bigram

This is a table of type bigram and their frequencies. Use it to search & browse the list to learn more about your study carrel.

bigram frequency
new york298
long island141
pennsylvania railroad109
railroad company106
per day103
ninth avenue102
river tunnels96
north river96
east river89
york city86
iron lining75
terminal station70
soft ground67
per sq58
air pressure55
seventh avenue54
chief engineer52
bottom heading51
new jersey51
compressed air50
per min49
island railroad49
concrete lining48
tenth avenue44
reinforced concrete44
east side44
cutting edge43
island city42
center line42
th street41
per cu39
cubic yards37
civil engineers36
retaining wall36
weehawken shaft35
rock surface34
tunnel extension33
american society33
jersey city33
west side33
first avenue32
metal lining32
per cubic32
elevated railway32
bergen hill31
per ring31
tunnel lining31
retaining walls30
linear foot30
south side30
st street29
shield chambers29
per linear29
fifth avenue27
per shift27
rapid transit27
cubic yard26
north side26
top heading26
resident engineer25
manhattan shaft25
writer believes25
wood pipe25
river division25
york tunnel25
average time25
land tunnels25
hudson river24
open cut24
free air24
york side24
rock bottom23
eighth avenue23
town tunnels23
station west23
per square23
february th23
cast iron22
twin tunnel22
bore segments21
elastic limit21
van der21
water pressure21
assistant engineer21
manhattan side21
steam shovel21
structural materials20
pennsylvania tunnel20
air per20
water supply20
per lin20
hill tunnels20
may th20
concrete design19
rail sections19
mine accidents19
contracting company19
sunnyside yard19
terminal railroad19
skin friction19
federal investigations19
special committee18
track tunnel18
april th18
railway structure18
meadows division18
der hoek18
yellow pine18
per hour17
final report17
page image17
arch action17
soft material17
transactions paper17
mixed rock17
instituted transactions17
engineers instituted17
water tower17
full page17
time taken17
atlantic avenue17
center heading16
every ft16
cost per16
bulkhead wall16
harrison transfer16
time per16
broken plates16
face walls16
one end16
york central16
street surface16
river tunnel16
feet material16
excavated material16
york division16
tunnel work16
solid material16
jersey side15
york contracting15
pipe line15
march th15
tenth avenues15
earth pressure15
per sec15
rock cover15
iron pipe15
per ft15
either side14
bay ridge14
fine sand14
solid rock14
twin tunnels14
bridge seat14
flatbush avenue14
heading method14
face wall14
greater part14
driven tunnels14
general electric14
june st14
cents per14
concrete piers14
mean high14
total deflection14
cement used14
rock section14
rock cut14
total cost14
full width14
eleventh avenue14
june th14
normal air14
two tunnels14
square foot14
intermediate shaft14
portland cement14
per cent14
el paso14
duct bench14
table part14
american railway13
timber bents13
water main13
bench concrete13
december th13
surface railway13
house line13
july th13
rock excavation13
latter part13
lower part13
hour shift13
ninth avenues13
concrete arch13
early part13
bolting time13
permanent steel13
central railroad13
rock core12
pennsylvania station12
average cost12
subaqueous tunnels12
plate xlvii12
erie railroad12
third street12
high water12
pounds per12
plate xlviii12
org ebooks12
tunnel superintendent12
typical cross12
resident engineers12
full face12
muck loaded12
shoring girders12
pennsylvania terminal12
track tunnels12
working chamber12
upper part12
flat cars12
air cylinders12
temporary shoring12
east avenue12
permanent viaduct12
total time12
one time12
crushed stone12
plate lxxiv12
pump chamber12
breast boards11
steel rails11
lock bulkhead11
pressure due11
damage done11
per hours11
bolt holes11
track level11
first crack11
right angles11
transverse girders11
nogal reservoir11
hydrostatic head11
western railroad11
point ft11
will show11
plate lii11
west line11
bearing value11
sixth avenue11
river bulkhead11
october th11
one side11
west end11
plate xiii11
top charges11
mica schist11
clear water11
box drains11
total weight11
per month10
test pieces10
hydraulic grade10
concrete water10
plate lxxiii10
frictional resistance10
weight per10
tunnel excavation10
one tunnel10
pressure air10
shield chamber10
plate lxii10
heading oct10
third streets10
mixed bottom10
plate xii10
dry sand10
hackensack river10
raker braces10
central track10
august th10
new england10
earth pressures10
per mile10
new orleans10
hydrostatic pressure10
false bottom10
two tracks10
plate li10
memoir prepared10
bridge company10
exploration drift10
united states10
second street10
eighth avenues10
previously described10
plate lix10
intercepting arch10
cutting edges10
locomotive performance10
short distance10
unavoidable delays10
motive power10
cast steel10
typical working9
york connecting9
way ducts9
described later9
least ft9
ordinary cast9
bonito creek9
soft clay9
avenue improvement9
two years9
river shafts9
per minute9
large quantity9
working face9
railway columns9
grout pipes9
springing line9
first street9
electric conduits9
santa rosa9
shield method9
per foot9
various lengths9
november th9
general superintendent9
rock center9
specifications required9
within ft9
short lengths9
tractive power9
square inch9
hour shifts9
southwestern railway9
iron tunnel9
plate lx9
aqueous material9
brick arch9
taper rings9
great care9
material trestle9
various operations9
hydraulic pressure9
years ago9
electric motor9
city station9
tunnel section9
broken stone9
steam cylinders9
middle heading9
time spent9
lined tunnels9
plate lviii9
final position9
engineering staff9
inside bucket9
work done9
present time9
transfer station9
plate lxx9
chief office9
average rate9
east line9
railway company9
hrs min9
connecting railroad9
number progress8
construction work8
much less8
plant depreciation8
concrete walls8
ninth ave8
pumping main8
two lines8
plate lxiv8
part rock8
central rock8
neat cement8
shield doors8
lehigh valley8
south shaft8
high tide8
taken place8
plate xlix8
concrete pier8
table gives8
train service8
field office8
two men8
summary part8
center lines8
land tunnel8
leg derricks8
permanent shafts8
passenger traffic8
applied water8
arching properties8
railroad tracks8
table summary8
avenue shafts8
far enough8
grade crossings8
cement grout8
whole time8
poling boards8
electric motors8
short time8
steel rods8
caulking pockets8
hoisting engines8
distance piece8
top headings8
masonry lining8
sliding platform8
full size8
water mains8
per ton8
south tunnel8
large part8
filtered water8
part earth8
traveling stage8
two sets8
intermediate shafts8
stave pipe8
rubble masonry8
cortlandt street8
weehawken side8
manhattan railroad8
queens borough8
cubic foot8
plate lxviii8
powder used7
way association7
plate xxix7
tunnel company7
excavation per7
total length7
second air7
th avenue7
railway engineering7
per shield7
hearth steel7
transfer yard7
refuge niches7
track system7
full hydrostatic7
large number7
deflection log7
large quantities7
pressure compressors7
rear end7
concrete wall7
th ave7
contract dated7
structural steel7
sump segment7
office administration7
air dry7
freight terminal7
ii ii7
driven tunnel7
rolling stock7
iii iii7
timber trestle7
valley railroad7
expanded metal7
general foreman7
width heading7
harrison yard7
last ring7
finally decided7
electric traction7
alfred noble7
bolted together7
rock tunnels7
construction company7
working pressure7
street pier7
heading feb7
river bed7
iv iv7
river bridge7
private property7
steam locomotives7
francis mason7
pressure per7
bulkhead line7
bottom headings7
single track7
aqueous materials7
large amount7
terminal site7
electric locomotives7
heavy timbering7
general plan7
facing mixture7
south abutment7
viaduct girders7
pier construction7
deflecton curves7
heading nov7
belt conveyor7
four tunnels7
north shaft7
mean total7
working force7
steel tank7
reinforcing rods7
curves beam7
previously mentioned7
steam shovels7
eugene klapp7
tunnel line7
average force7
steel viaduct7
rails shall7
north tunnel7
finally adopted7
river line7
january st7
steel plates7
certain amount7
radial joints6
truck period6
freight traffic6
river lines6
ten years6
east new6
plate xxvii6
island shaft6
even though6
two shafts6
took place6
wall plant6
two parts6
ordinary iron6
york station6
lower face6
fine material6
segmental timbering6
january th6
tunnel lines6
water will6
henry steers6
pile foundations6
united engineering6
bed mortar6
september th6
just east6
tunnels fig6
steel plate6
total labor6
including time6
tar pitch6
total average6
laying mandrel6
rock middle6
time total6
also used6
average number6
plate xxviii6
horizontal diameter6
water pressures6
hydraulic jacks6
tunnel invert6
per drill6
pressure compressor6
repair shops6
built without6
disposal trestle6
two additional6
mortar equivalent6
arching action6
great northern6
annual convention6
st ave6
force employed6
miles long6
upper face6
sized twin6
external diameter6
sand used6
pipe laid6
island shafts6
shield advanced6
upper deck6
steel bolts6
island reef6
aqueous pressure6
southern pacific6
main line6
day work6
railway association6
heavy iron6
bench method6
hold back6
cement mortar6
longitudinal reinforcement6
field charges6
passenger yard6
grand total6
one shield6
rock sections6
partly filled6
first air6
outside diameter6
driven westward6
avenue terminal6
linear feet6
testing machine6
leg derrick6
south end6
long enough6
creosoted timber6
ultimate load6
sliding platforms6
invert concrete6
vehicular traffic6
five years6
multiple ducts6
ph oe6
total field6
hydraulic method6
total pressure6
heavy cast6
single tunnel6
city lots6
directly beneath6
entire length6
ground encountered6
grade line6
tunnels east6
engineering construction6
plate lxi6
tons per6
pier head6
tissue paper6
average progress6
iron workers6
tunnel transport6
per yard6
low tide6
bored pipe6
without caulking6
just west6
per annum6
elevated railroad6
avenue elevated6
generating plant6
wall sections6
leading end6
chief assistant5
freezing process5
views showing5
large scale5
east rivers5
total quantity5
tunnel roof5
hydraulic fittings5
avenue eastward5
iron tube5
grout ejected5
lowest point5
large portion5
arch thrust5
surface transportation5
street level5
elevated tank5
linus weed5
showing condition5
upper platform5
large area5
east house5
luther elman5
test holes5
heading mar5
total number5
heavy ground5
voids outside5
deceased members5
outside tracks5
two main5
sharp sand5
th streets5
neat line5
locking device5
earth section5
plan showing5
river front5
good results5
line will5
field engineering5
two single5
also shown5
dated august5
transit trains5
one hundred5
concrete form5
dome forms5
tunneling shields5
march st5
lower ft5
previously referred5
east end5
york shield5
creosote oil5
heading jan5
unit unit5
plate ix5
various parts5
survey lines5
cut sections5
whole length5
december st5
lateral pressure5
part ave5
square twisted5
leaf yellow5
blackwall tunnel5
working chambers5
charles alfred5
several kinds5
inside diameter5
john henderson5
permanent cast5
three sections5
ordinary type5
kenneth allen5
rod reinforcement5
rail committee5
weehawken tunnels5
pit excavation5
specific gravity5
moved ahead5
great value5
brick sewer5
samuel rea5
hoisting engine5
placing concrete5
hackensack meadows5
section gy5
already described5
pressure required5
avenue structures5
maximum pressure5
original intention5
one power5
building material5
transportation problem5
underground portions5
rock packing5
heavy traffic5
station will5
building tunnel5
original design5
miles per5
time min5
erecting iron5
hard material5
dry material5
permanent structures5
axis level5
freight yard5
transportation plant5
front street5
single tunnels5
cubic per5
plate xxiv5
twisted steel5
erector runner5
principal contract5
terminal yard5
july st5
lost time5
whole gang5
typical sections5
water used5
lift rail5
pushing back5
earth excavation5
almost entirely5
small gang5
north end5
concrete retaining5
west shore5
surface transport5
northern railroad5
steam cylinder5
completed previously5
full pressure5
clearly shown5
tunnel sections5
pumping station5
gas company5
twisted rods5
much better5
sand arch5
steel ring5
full height5
general way5
two types5
surface structures5
standard section5
operations involved5
general type5
two points5
first ring5
table showing5
passenger station5
clay blanket5
south tunnels5
cable conduits5
albert mather5
erector ram5
static theory5
plain concrete5
excavating ahead5
short posts5
iron sewer5
leaf pine5
spaced ft5
cover section5
many cases5
civil engineer5
three sets5
sketch showing5
bench walls5
william arthur5
natural slope5
bore segment5
many years5
plate xxxv5
chief draftsman5
tube tunnels5
various kinds5
general arrangement5
river railroad5
extension project5
island shields5
work will5
railroad station5
shield jacks5
block lagging5
working compartments5
sliding hoods5
storage bins5
showing method5
open stand5
tests made5
heading sept5
frequent intervals5
west portion5
station building5
permanent bench5
bag batch5
simple matter5
side thrust5
time required5
will make5
pocket iron4
two rows4
experiments noted4
ring taken4
avenue wall4
rock going4
rate per4
left open4
results obtained4
detailed records4
temporary posts4
stone used4
total per4
distance east4
power conduits4
many instances4
exposed sand4
fowler warehouse4
broaching line4
varied greatly4
writer will4
temporary timbering4
preliminary work4
different classes4
plate headings4
steel structure4
two sections4
one point4
grout hole4
lower portion4
caulking groove4
month date4
mixed face4
assistant tunnel4
rated capacity4
blacksmith shop4
shaft sites4
southern pine4
inner edge4
square earth4
pumping plant4
two electric4
several places4
drill shift4
time hrs4
second bulkhead4
plate lxv4
west shafts4
circumferential reinforcement4
coarse sand4
sufficiently large4
railroad traffic4
kennard thomson4
appointed chief4
plate xxvi4
died february4
lower end4
pacific railroad4
northern grafton4
central plant4
masonry retaining4
per gallon4
forward force4
recent years4
one case4
looking north4
manhattan island4
two steel4
bound track4
circumferential flanges4
weight weight4
succeeding papers4
top full4
vertical diameter4
four years4
central portion4
bulkhead walls4
river draw4
work east4
laying concrete4
died march4
gy west4
rock broke4
great many4
first put4
per per4
broken plate4
radial joint4
plate xxx4
mooted questions4
high vertical4
steam railroad4
entirely satisfactory4
first two4
uniform thickness4
per yd4
pumping plants4
actual cost4
train resistance4
drill steel4
supporting elevated4
plate lxiii4
loading platform4
air line4
will find4
entire width4
give access4
avenue plant4
air lock4
north manhattan4
live load4
arch timbers4
heat will4
table shows4
bearing power4
foremen foremen4
working gang4
material required4
full section4
rock bench4
beam ties4
thought best4
excavation done4
escaping air4
station construction4
trap rock4
dumping buckets4
street shaft4
large rock4
pennsylvania company4
two small4
spigot pipe4
tunnel cars4
heading july4
baldwin catalogue4
trailing platform4
erection labor4
full rock4
electric cables4
foot per4
two pieces4
muck taken4
velocity measurements4
local conditions4
earth soft4
west thirty4
great pressure4
steel rings4
mean low4
tion lost4
showing underpinning4
brick arches4
ring yard4
shore line4
cold weather4
fixed hoods4
facing mortar4
sliding extensions4
open material4
greater portion4
known theory4
dumping board4
curb line4
different methods4
plate xli4
transit railroad4
large enough4
vertical leads4
engineering news4
soon became4
eastern end4
completed tunnel4
mining cars4
required timbering4
work included4
upper end4
firm material4
large air4
will carry4
vertical breast4
greater depth4
excavating plant4
careful reading4
soft rock4
manufacturing company4
general resident4
dock plant4
service reservoirs4
exhaust valves4
upper floor4
stresses due4
somewhat similar4
first bulkhead4
four shields4
gas pipes4
lost total4
california stove4
first period4
plate xxv4
concrete base4
water pumps4
dotted lines4
middle drain4
fixed extensions4
apart vertically4
average amount4
seventh avenues4
lower half4
cubic mucking4
heading dec4
without timbering4
perfect contact4
disposal pier4
experiments made4
short description4
grout pipe4
different times4
writer agrees4
given turbidity4
brick wall4
tested timbers4
ft ft4
approximately ft4
freight tracks4
plate lxvi4
will probably4
trench mica4
plate xiv4
north abutment4
span twin4
trolley tracks4
tightening bolts4
river gas4
cut section4
general method4
oe nixville4
diagram showing4
also drilled4
sized single4
earth poling4
corona summit4
boards braced4
vertical boiler4
incrusting solids4
low water4
doors open4
plate lxvii4
will cause4
center wall4
cut work4
full volume4
per pound4
fixed hood4
excavated banks4
station lin4
earth excavated4
important part4
reaching new4
dollars per4
tunnel center4
second avenue4
pure water4
nearly completed4
city engineer4
driven ahead4
plant running4
loblolly pine4
yards cubic4
longitudinal shear4
day general4
public service4
four times4
track railroad4
grout holes4
assistant chief4
previously stated4
maiden lane4
two classes4
always kept4
large proportion4
driving shield4
arthur payne4
full depth4
main tracks4
shaft sump4
careful consideration4
herein described4
riveted steel4
ton jack4
showing excavation4
iron filings4
final lines4
will fail4
three classes4
looking east4
base line4
rock excavated4
total force4
much easier4
view looking4
salt water4
cameron pumps4
baldwin loco4
heavy pressure4
total items4
permanent timbering4
river bottom4
shoving shield4
excavated materials4
heading advanced4
pennsylvania system4
grafton greenough4
pieces shall4
schist center4
manhattan shield4
iron rings4
much larger4
average length4
introductory paper4
close contact4
material excavated4
pressure will4
including bolting4
middle wall4
glendale cut4
actual amount4
division engineer4
per bent4
muck cars4
branch pipe4
preliminary headings4
detailed description4
wet sand4
five rows4
excavation partially4
general scheme4
splicing chambers4
bay city4
pile met4
became necessary4
one stiff4
force per4
will also4
different kinds4
mucking tion4
overlying material4
steam shall4
arching effect4
opposite sides4
hackensack portal4
removing hood4
new design4
material will4
items hrs4
metal used4
house plant4
plate xliii4
first step4
small shaft3
elevated railroads3
ke may3
complete disposal3
analyzed cost3
forward end3
avoid damage3
vice versa3
three times3
westerly side3
st st3
power pumps3
ground surface3
another paper3
entire face3
partly constructed3
careful study3
delivering water3
sufficient depth3
consulting engineers3
previous paper3
outside forms3
staten island3
division tracks3
running tracks3
considerable settlement3
top timbers3
labor cost3
various stages3
will now3
new lines3
railroad companies3
railroad commissioners3
hot asphalt3
flat steel3
side toward3
new haven3
place measurement3
described elsewhere3
compressor plant3
survey stations3
cut excavation3
overhead platform3
town movement3
will undoubtedly3
tunnels begun3
november st3
detailed cost3
steel without3
forest service3
cement per3
terminal area3
ki may3
drainage system3
lower deck3
two shifts3
south sidewalk3
side trees3
outside concrete3
writer jostled3
oil fields3
associate member3
entire work3
bottom fell3
bad rock3
side holes3
vertical ordinate3
working space3
business center3
saw cuts3
hundred feet3
general design3
five times3
beyond doubt3
close together3
city railway3
almost immediately3
pressure varied3
project gutenberg3
gauge readings3
worked per3
bad ground3
live steam3
great interest3
min hrs3
rock face3
superheated steam3
glen cove3
wall ft3
avenue portal3
storage reservoir3
split end3
eleven segments3
greater loading3
summit avenue3
center compartments3
entire scheme3
every case3
piles driven3
mixing plant3
edward godfrey3
specially designed3
another contract3
pulled forward3
total earth3
built across3
new concrete3
split longitudinally3
plug cover3
engineer assistant3
time mr3
plate xx3
excavation center3
two segments3
hill tunnel3
bench forms3
steel pipe3
tied together3
plate lv3
maximum speed3
pilot tunnel3
concrete started3
set ft3
tunnels driven3
full area3
full pipe3
release valve3
rail ft3
dated june3
water directly3
physical defect3
ordinary manner3
superimposed load3
extended beyond3
rear wall3
square partially3
relative velocities3
extra heavy3
hydraulic action3
caissons sunk3
additional track3
rods used3
sledge hammer3
lateral movement3
stake boat3
patrick fitzgerald3
made without3
island side3
arch concrete3
accurate limits3
subaqueous materials3
fill will3
street lines3
little less3
paper page3
elman johnson3
problems similar3
larger bucket3
large volume3
pushed back3
lead joint3
shield showing3
main beams3
four single3
map showing3
charles herbert3
mechanical ventilation3
iron without3
safety valves3
circumferential joint3
concrete used3
timbering face3
dump cars3
electric generators3
track structure3
shoved ahead3
entire surface3
real value3
second vice3
concrete finished3
wall required3
concrete structure3
tower victoria3
finishing rolls3
figures relating3
four drills3
running continuously3
without pockets3
measurable leakage3
per barrel3
pipe full3
manhattan borough3
local traffic3
engineering profession3
chemical composition3
long grades3
four derricks3
loose rock3
john fiske3
james forgie3
permanent bents3
two coats3
longitudinal section3
terminal power3
much water3
natural cover3
short length3
steel beams3
general features3
two columns3
february st3
rock surfaces3
placed ft3
feet drilled3
transmitted laterally3
fender piles3
well known3
rodding mandrel3
cracked stone3
base required3
railroad trains3
considerable time3
whole height3
york quicksand3
different points3
ordinary sand3
interior surface3
unloading sand3
bench total3
cars standing3
rather wet3
small scale3
southern railway3
general average3
light iron3
railroad water3
steel rod3
partially completed3
vertical position3
tunnel terminal3
various classes3
foot sufficiently3
full length3
crown level3
vertical face3
outside circumference3
local passenger3
plate paper3
reading railroad3
time tunnel3
enough air3
south caisson3
form carriages3
assumed center3
sheeted trenches3
standard cross3
laid along3
total total3
temporary structures3
timber work3
final rodding3
shield work3
engineering force3
just south3
first type3
plate viii3
plate lxxii3
cables attached3
madison avenue3
adjacent buildings3
suez canal3
will increase3
drills mounted3
easily handled3
smooth steel3
fifth street3
assistant engineers3
loose sand3
hydraulic jack3
local trains3
express trains3
george gibbs3
property line3
plate lvi3
space occupied3
every effort3
also made3
south manhattan3
good rock3
general manager3
called section3
old foundation3
little trouble3
streets opposite3
tunnel transportation3
total area3
first appearance3
moist sand3
broke better3
tunnel passes3
middle third3
takes place3
two sides3
plate xxxix3
first erected3
little attention3
street station3
must necessarily3
dated april3
plate heading3
somewhat less3
will change3
good idea3
shorter grades3
without taking3
base lines3
ground within3
showing rock3
partially maximum3
two sons3
steel girders3
air compressors3
tunnels extending3
actual average3
rock disappeared3
main divisions3
soon found3
first ten3
pump main3
total capacity3
tunnel arches3
heavy buildings3
tunnel segments3
weehawken rock3
iron segments3
approximating tons3
will frequently3
pipe pile3
called quicksand3
west supplementary3
manner described3
passenger tracks3
overhead girders3
technical training3
sump segments3
plate lxxi3
upper surface3
excessive loss3
locomotives will3
temporary shaft3
two longitudinal3
special construction3
contract plans3
packed stone3
air supply3
sea water3
railroad tunnels3
transit company3
first pair3
one month3
wooden piles3
without removing3
tunnel north3
much lower3
cement warehouses3
manhattan gas3
cut feb3
american bridge3
preliminary borings3
air cylinder3
soupy sands3
borne commerce3
yard tunnel3
facilitate stripping3
lining castings3
transit subway3
henderson sample3
timber used3
several feet3
business transactions3
transverse bulkhead3
two double3
total excavation3
second test3
hydraulic power3
tunnels near3
field staff3
engine oil3
embedded stone3
wire rope3
tunnel sewer3
pure quicksand3
york district3
line compressors3
surrounding earth3
newly excavated3
heading timbered3
professional career3
william meier3
moved along3
new line3
south wall3
greatly enlarged3
month assistant3
date timber3
north wall3
rock tunnel3
certain quantity3
two platforms3
pile supports3
normal slopes3
splice bars3
largely increased3
bench aug3
quite probable3
gauge track3
fourth avenue3
good quality3
water may3
averaged lb3
two bottom3
timbers shall3
high school3
plate xxiii3
per lb3
washington plant3
western end3
iron water3
dredging plane3
burlington quincy3
general methods3
small part3
concrete cars3
middle section3
battery tubes3
cotton duck3
corrugated iron3
maximum load3
disposal period3
england water3
whole force3
interborough rapid3
first set3
also prepared3
net weight3
pressure may3
steel lining3
way duct3
will form3
good condition3
central core3
rock encountered3
removal labor3
alfred hasbrouck3
park place3
ordinary pocketless3
temporary platform3
definite thickness3
various types3
ridge tunnel3
railroads reaching3
one mile3
deep trenches3
pocketless iron3
surface labor3
form used3
steam engine3
slightly greater3
looking west3
undisturbed material3
feed pumps3
one set3
additional back3
two short3
loading material3
light charges3
several hours3
water coming3
arch forms3
materials except3
day per3
engine storage3
securely braced3
chenoweth pile3
freight shed3
extended westward3
one plant3
materials used3
four lines3
obtained permission3
jacobus van3
feet south3
cost records3
maximum curvature3
ko may3
railroad system3
entire order3
duct feet3
bottom lift3
interior diameter3
many engineers3
intermediate cap3
became chief3
will stand3
water per3
mechanical engineer3
morton street3
pocket book3
became evident3
except rock3
might occur3
two separate3
concrete construction3
practical purposes3
results may3
intermediate caps3
cornice forms3
deck construction3
subaqueous shield3
sand layer3
weehawken land3
station yard3
late fall3
lower bent3
aqueous matter3
hydraulic erector3
concrete mixers3
tunnel westward3
pile bore3
doors closed3
feet per3
two portions3
lower edge3
reasonably accurate3
drift excavated3
readily seen3
raker bench3
pitch water3
kept separate3
iron section3
standard tunnel3
traffic facilities3
concrete work3
date month3
posts resting3
equivalent area3
many places3
tons capacity3
fiske barnard3
city shafts3
preliminary treatment3
fairly well3
thought desirable3
used successfully3
pipe lines3
plaster coat3
shop contained3
august st3
per bbl3
carrizozo plain3
broaching holes3
first removed3
new section3
gas tunnel3
river silt3
nd st3
girders carrying3
sectional sliding3
working platform3
station site3
rings containing3
east th3
hoist engineer3
pipe will3
unloading points3
normally dry3
twelve sections3
sound rock3
rock drills3
boundary line3
within five3
several years3
several occasions3
permanent work3
great difficulty3
next fifteen3
street tunnels3
aqueous masses3
bore plug3
future time3
meadows yard3
sections showing3
safety valve3
general labor3
south edge3
entire construction3
one operation3
near eleventh3
public schools3
red lead3
bolts grummeted3
original contract3
yacht pier3
cow bay3
hours min3
easterly end3
light company3
estimated cost3
dryer sand3
jersey division3
annular space3
upper half3
firmly braced3
first chutes3
author states3
ransome mixers3
pier lines3
unit cost3
small cameron3
active service3
unit prices3
replacing sand3
lower platform3
internal bracing3
air required3
submerged structures3
first ft3
gas light3
shows one3
securely spiked3
two instances3
duct ft3
mather smith3
six rows3
given point3
face forms3
manner similar3
main features3
plate xxxviii3
thence running3
take care3
plate vii3
hydraulic grades3
high pressure3
rail shall3
normal slope3
driven eastward3
boonton branch3
directly chargeable3
neat lines3
power station3
edge air3
vent pipes3
steel castings3
looking northwest3
dumped directly3
near glen3
chief engineers3
small openings3
general view3
average quantity3
required amount3
forward ends3
circumferential flange3
pump chambers3
top cap3
thence eastward3
fifteen years3
manhattan ledge3
broken segments3
english lime3
gauge railway3
snatch teams3
caisson shafts3
beam tested3
manhattan tunnels3
carpenter shop3
england states3
bulkhead lines3
traffic capacity3
serious difficulties3
herbert deans3
main items3
civil engineering3
melting point3
showing first3
baldwin avenue3
inner edges3
transverse polings3
john stephen3
cement wash3
reference type3
used per3
heavy type3
tunnels will3
santa fe3
full normal3
two steam3
sliding hood3
taper base3
upper bent3
tunnel inspectors3
topeka santa3
weed brown3
unit costs3
also believes3
plate xxxii3
manhattan tunnel3
power plant3
just outside3
cubic run3
pressure exerted3
gravity section3
one shift3
duct laying3
steel angles2
avoid undue2
two operations2
arching stability2
ferry traffic2
piston began2
may change2
gravity supplies2
handling cement2
every second2
double heading2
bench sept2
crayon sketch2
appreciable viscosity2
tunnel without2
work adopted2
plate liv2
contract company2
telegraph ducts2
empty coal2
freight trains2
without breaking2
weight required2
tunnel shell2
brief account2
conditions will2
pocketless type2
held tightly2
sheeted trench2
bottom jacks2
excavation completed2
cylinder air2
finely divided2
entirely independent2
rapidly advanced2
gravity sections2
steel chute2
tapered lagging2
three groups2
fully described2
ram moving2
piled vertically2
move freely2
first cost2
bacterial counts2
trains destined2
station near2
made ready2
construct tunnels2
greenville yard2
weight utilized2
shoreward side2
copper pipe2
solid line2
hour min2
order will2
troublesome features2
experiment consisted2
showing area2
slight subsidence2
western division2
thoroughly grouted2
ply tar2
little experience2
current state2
pipes leading2
working faces2
acting rams2
broken rock2
piles piles2
absolutely tight2
rose gradually2
tunnel south2
deductions therefrom2
timber raised2
rockaway beach2
timber platform2
three months2
rio grande2
permanent position2
practically completed2
firm materials2
concrete caissons2
first plate2
minimum pressure2
approximately twice2
much rock2
total volume2
take place2
brick armor2
operation repeated2
new arrangements2
one another2
structure along2
mixed ground2
wearing rail2
surface inspectors2
rodding multiple2
vertical lagging2
energy due2
ran back2
manhattan will2
built around2
work just2
material saving2
pearson contract2
three horizontal2
area remaining2
piston might2
air plant2
rodding single2
careful inspection2
two faces2
average pressure2
steel diaphragm2
young man2
latter point2
joseph wright2
thorough ventilation2
part elevated2
richard montfort2
placed longitudinally2
express matter2
seven weeks2
southwestern system2
controlling valves2
put together2
narrowed twin2
may cause2
actual friction2
longitudinal girders2
vitrified pipes2
wood staves2
vitrified paving2
appointed assistant2
assistant superintendent2
engines mounted2
general tunnel2
ordinary ground2
solid stone2
solid matter2
packed tight2
hr min2
three different2
using concrete2
typical bent2
excessive depth2
telephone ducts2
prevent rupture2
iron company2
inner bent2
pipe diameters2
time ago2
open doors2
ascending grade2
placing water2
steel tapes2
electrically driven2
dead weight2
freight facilities2
equivalent pressure2
circumstances dictated2
badly broken2
full title2
results given2
main types2
long length2
good many2
sliding joints2
floor template2
led back2
four rings2
liquid weighing2
satisfactory results2
new amsterdam2
equals zero2
first miles2
certainly prior2
concrete inside2
wire brushes2
electric lights2
obvious alternative2
known precautions2
necessarily rather2
lower elevation2
grand central2
spiked together2
middle trench2
description will2
street east2
front forms2
deans entered2
works association2
beam iv2
per second2
pumped directly2
center soft2
bad weather2
great importance2
average temperature2
partially average2
initial pressure2
rendered using2
percival roberts2
missouri pacific2
complete ring2
much time2
shown graphically2
three rand2
vertical jack2
concrete cross2
hours per2
pipe per2
gas mains2
tunnel built2
avenue leading2
scraped clean2
completely excavated2
yards placed2
inside scaffold2
small pilasters2
bending tests2
disintegrated rock2
pressures equal2
shoal water2
conditions met2
double bents2
bridge work2
lidgerwood boiler2
change somewhat2
large factor2
henry japp2
described previously2
placed directly2
different batters2
soft nature2
displaced plates2
taken directly2
president since2
franchise granted2
sufficiently heavy2
able air2
chief points2
drum lambert2
run along2
various pieces2
small concrete2
thick base2
badly seamed2
nearly parallel2
minor modifications2
victoria water2
assumed arches2
east track2
standard joints2
crusher plant2
lake railroad2
three tiers2
every section2
man per2
iron men2
stone per2
full water2
accepted without2
phi angle2
gravity system2
two lifts2
tunnel timbering2
secondary platform2
compressor running2
various modifications2
city will2
medical officer2
railway trains2
careful handling2
contractor maintained2
much air2
michigan pipe2
dumping mixers2
timber cradle2
north edge2
absolutely necessary2
many points2
gear engines2
using compressed2
structural engineering2
platforms will2
three distinct2
briquetting machine2
proposed new2
tunnel ft2
ring erected2
anyone doubt2
short sections2
wooden walls2
similar material2
measuring loss2
vitrified pipe2
heavy trucks2
three hydraulic2
executive officer2
ultimate strength2
desired quantity2
one heavy2
plate xl2
grouting outside2
laid across2
always considered2
nearly equal2
proofing consisted2
much room2
survey station2
will always2
locomotive may2
electric shunt2
electric power2
contracting firm2
erection time2
expansion joint2
city council2
three residencies2
newtown creek2
finally become2
rods supporting2
decreasing since2
improvement proper2
column arch2
damp spots2
extended eastward2
concrete cradle2
water displaced2
duplex pump2
carefully worked2
beam vi2
vitrified earthenware2
ten months2
iron may2
two pipes2
one derrick2
average excavation2
two pumps2
reinforcement consists2
top discard2
nd street2
shield fitted2
upper plates2
engineer will2
floor concrete2
material brought2
five cross2
grade revision2
driven blind2
cover work2
facing diaphragms2
former paper2
terminal improvement2
homogeneous material2
service mains2
will come2
thorough inspection2
shield door2
transport laborers2
either end2
well advanced2
proper quantities2
gradually widened2
two shields2
averaged min2
heavily loaded2
resume work2
form stood2
cable haulage2
parts received2
terminal passenger2
laid circumferentially2
th ward2
second period2
earth earth2
good deal2
shall work2
construction purposes2
final disposal2
silt displaced2
cement brick2
west th2
every respect2
river approached2
inner waters2
tunnel level2
standard cast2
contractor furnished2
large numbers2
sterling boilers2
bound traffic2
desired position2
bucket conveyor2
goodrich assumes2
one small2
one additional2
additional ones2
barges furnished2
pedestrian traffic2
balancing pressure2
near th2
head trees2
carefully pasted2
greatest care2
two consecutive2
absolutely safe2
plates attached2
two months2
one society2
platform rams2
box forms2
drains back2
mechanical analysis2
showing widths2
old concrete2
red sand2
manhattan beach2
three layers2
mild steel2
tulane university2
natural state2
wooden piston2
key lagging2
also high2
natural arch2
transit board2
weaken wood2
narrow limits2
landward side2
railway location2
area subject2
three parts2
complete chemical2
extensive repairs2
metropolitan district2
minimum height2
average air2
entire line2
phosphorus content2
ditch boxes2
island bridge2
properly done2
ultimate capacity2
tunneling general2
considerable depth2
exterior width2
york state2
signalmen muckers2
dated november2
joralemon street2
methods used2
true arch2
every way2
small sand2
carefully made2
circular arches2
borden avenue2
close accord2
radialax machine2
swinging gear2
author index2
without waiting2
preceding pages2
one shall2
schist bench2
soft concrete2
continual slipping2
equal signs2
pressure toward2
specific data2
laborers watchmen2
center medium2
considering semi2
monthly progress2
perfectly tight2
machine per2
city blocks2
height permissible2
maximum reaction2
large steel2
practically finished2
top rail2
sometimes two2
generally made2
automatic air2
railway column2
rock july2
steel wedge2
took min2
proved without2
upper ft2
settlement took2
facilities connected2
linear linear2
frozen sand2
headings east2
carrizozo service2
thomson avenue2
original bottom2
hudson schist2
stone ballast2
gauge cars2
sufficient width2
reinforcement extends2
full capacity2
sound material2
circumferential reinforcing2
machine shop2
passage lining2
rail connection2
per powder2
blake manufacturing2
within reasonably2
exhaust steam2
boat service2
town station2
form lumber2
rings per2
th row2
brought together2
bound tunnels2
key given2
initial settlement2
good material2
carefully regulated2
pit east2
permit allowed2
center rows2
considerable part2
full discussion2
complete destruction2
considerable force2
plates plate2
eight electric2
special consideration2
three tunnels2
weehawken tunnel2
will agree2
three stages2
proper laps2
drains leading2
low pressure2
may require2
several hundred2
four hours2
additional platforms2
latter company2
eight caissons2
city terminal2
working three2
loading points2
horizontal distance2
authoritative opinions2
shoved together2
circular conduit2
corresponding ones2
chief tunnel2
bridge foundations2
wherever possible2
plate liii2
bearing ground2