This is a table of adjective/noun combinations and their frequencies from sentences in your study carrel. Use it to search & browse the list to learn more about your study carrel.
adjective | noun | frequency |
---|---|---|
- | iron | 62 |
- | track | 51 |
- | wall | 41 |
- | section | 39 |
concrete | . | 37 |
same | time | 35 |
total | . | 33 |
- | pressure | 30 |
- | walls | 20 |
average | time | 18 |
- | water | 18 |
soft | material | 17 |
- | rock | 16 |
top | . | 16 |
- | lined | 14 |
high | . | 13 |
other | . | 13 |
- | sections | 12 |
high | water | 12 |
possible | . | 11 |
open | . | 9 |
- | pipe | 9 |
long | . | 8 |
necessary | . | 8 |
permanent | shafts | 8 |
- | line | 7 |
- | pipes | 7 |
concrete | wall | 7 |
concrete | walls | 7 |
total | pressure | 6 |
total | time | 6 |
main | line | 6 |
first | air | 6 |
- | tunnel | 5 |
average | | | 5 |
full | pressure | 5 |
main | . | 5 |
others | . | 4 |
main | tracks | 4 |
large | rock | 4 |
such | work | 4 |
low | water | 4 |
open | material | 4 |
large | air | 4 |
great | pressure | 4 |
- | ft | 4 |
full | section | 4 |
full | rock | 4 |
heavy | pressure | 4 |
other | tunnels | 3 |
new | concrete | 3 |
new | line | 3 |
new | lines | 3 |
new | section | 3 |
permanent | work | 3 |
other | work | 3 |
mains | . | 3 |
same | material | 3 |
such | material | 3 |
total | excavation | 3 |
more | water | 3 |
other | side | 3 |
less | . | 3 |
concrete | work | 3 |
large | . | 3 |
- | air | 3 |
concrete | lining | 3 |
concrete | water | 3 |
- | works | 3 |
full | pipe | 3 |
good | rock | 3 |
great | . | 3 |
heavy | iron | 3 |
high | pressure | 3 |
small | concrete | 2 |
other | lines | 2 |
other | materials | 2 |
other | sections | 2 |
other | tunnel | 2 |
permanent | concrete | 2 |
permanent | shaft | 2 |
similar | material | 2 |
such | pipe | 2 |
small | sand | 2 |
small | section | 2 |
soft | concrete | 2 |
soft | rock | 2 |
such | lines | 2 |
total | material | 2 |
total | | | 2 |
lower | pressure | 2 |
open | sand | 2 |
heavy | work | 2 |
low | pressure | 2 |
first | . | 2 |
- | tracks | 2 |
low | . | 2 |
- | waters | 2 |
average | air | 2 |
average | excavation | 2 |
average | pressure | 2 |
concrete | line | 2 |
- | work | 2 |
first | work | 2 |
good | . | 2 |
good | material | 2 |
higher | . | 2 |
full | water | 2 |
long | shaft | 2 |
large | rocks | 2 |
opened | . | 1 |
newer | work | 1 |
open | air | 1 |
open | excavation | 1 |
open | pipe | 1 |
open | work | 1 |
other | pipes | 1 |
other | lined | 1 |
other | shafts | 1 |
permanent | . | 1 |
possible | lines | 1 |
new | water | 1 |
same | . | 1 |
new | work | 1 |
more | time | 1 |
new | tunnel | 1 |
new | sections | 1 |
new | material | 1 |
necessary | material | 1 |
necessary | air | 1 |
more | work | 1 |
same | pressure | 1 |
more | sides | 1 |
more | sections | 1 |
more | concrete | 1 |
more | air | 1 |
more | . | 1 |
many | times | 1 |
main | work | 1 |
same | line | 1 |
small | shaft | 1 |
same | side | 1 |
soft | materials | 1 |
main | side | 1 |
top | shield | 1 |
top | sections | 1 |
such | tunnels | 1 |
such | times | 1 |
such | time | 1 |
such | pressures | 1 |
such | materials | 1 |
such | excavations | 1 |
such | excavation | 1 |
softer | material | 1 |
soft | water | 1 |
soft | sand | 1 |
smaller | water | 1 |
same | times | 1 |
smaller | tunnels | 1 |
smaller | pipes | 1 |
smaller | pipe | 1 |
small | works | 1 |
small | water | 1 |
small | shield | 1 |
small | shafts | 1 |
small | rock | 1 |
small | . | 1 |
similar | work | 1 |
similar | water | 1 |
similar | shafts | 1 |
similar | line | 1 |
main | wall | 1 |
concrete | sand | 1 |
main | excavation | 1 |
first | shield | 1 |
good | water | 1 |
good | sand | 1 |
good | concrete | 1 |
general | water | 1 |
full | shaft | 1 |
full | sand | 1 |
full | lines | 1 |
full | excavation | 1 |
full | air | 1 |
full | . | 1 |
first | water | 1 |
first | walls | 1 |
first | side | 1 |
first | section | 1 |
lower | track | 1 |
first | line | 1 |
first | concrete | 1 |
concreting | . | 1 |
concrete | tunnel | 1 |
concrete | track | 1 |
concrete | section | 1 |
concrete | materials | 1 |
best | lines | 1 |
- | time | 1 |
- | sanded | 1 |
- | pressures | 1 |
- | irons | 1 |
- | _ | 1 |
good | work | 1 |
great | tunnels | 1 |
great | work | 1 |
greater | pressure | 1 |
lower | shield | 1 |
lower | section | 1 |
lower | new | 1 |
low | walls | 1 |
low | side | 1 |
low | pressures | 1 |
longer | side | 1 |
long | time | 1 |
long | side | 1 |
long | sections | 1 |
long | section | 1 |
larger | tunnels | 1 |
larger | tunnel | 1 |
large | work | 1 |
large | water | 1 |
large | shaft | 1 |
large | sections | 1 |
large | pressure | 1 |
large | pipes | 1 |
high | side | 1 |
high | pressures | 1 |
heavy | | | 1 |
heavy | water | 1 |
heavy | . | 1 |
heaviest | tunnel | 1 |
heavier | rock | 1 |
heavier | iron | 1 |
total | materials | 1 |