This is a table of type bigram and their frequencies. Use it to search & browse the list to learn more about your study carrel.
bigram | frequency |
---|---|
new york | 399 |
railroad company | 245 |
per cent | 157 |
long island | 144 |
greenfield railroad | 123 |
per day | 119 |
pennsylvania railroad | 109 |
bell rock | 106 |
hoosac tunnel | 105 |
thousand dollars | 103 |
ninth avenue | 102 |
north river | 97 |
river tunnels | 96 |
york city | 91 |
east river | 89 |
elastic limit | 89 |
iron lining | 85 |
compressed air | 78 |
per sq | 76 |
soft ground | 76 |
chief engineer | 71 |
terminal station | 70 |
forest service | 69 |
see fig | 67 |
air pressure | 61 |
cubic yards | 60 |
floating light | 59 |
resident engineer | 54 |
seventh avenue | 54 |
bottom heading | 53 |
new jersey | 53 |
one hundred | 53 |
steam engine | 53 |
company shall | 52 |
per min | 50 |
island railroad | 49 |
west end | 49 |
haupt co | 49 |
united states | 48 |
per square | 48 |
east end | 48 |
mechanical properties | 48 |
concrete lining | 48 |
reinforced concrete | 47 |
east side | 46 |
civil engineers | 46 |
hundred thousand | 45 |
cutting edge | 45 |
tenth avenue | 44 |
per minute | 43 |
per cu | 43 |
island city | 42 |
work done | 42 |
center line | 42 |
per cubic | 42 |
portland cement | 41 |
crown vo | 41 |
th street | 41 |
let us | 41 |
late wood | 38 |
pounds per | 38 |
cubic yard | 38 |
square inch | 38 |
retaining wall | 37 |
hudson river | 37 |
american society | 36 |
saint louis | 35 |
western railroad | 35 |
weehawken shaft | 35 |
rock surface | 34 |
new england | 34 |
jersey city | 33 |
tunnel lining | 33 |
west side | 33 |
elevated railway | 33 |
western road | 33 |
tunnel extension | 33 |
first avenue | 32 |
retaining walls | 32 |
one end | 32 |
central shaft | 32 |
years ago | 32 |
metal lining | 32 |
feet per | 31 |
south side | 31 |
per ring | 31 |
fitchburg railroad | 31 |
young man | 31 |
bergen hill | 31 |
five years | 31 |
two hundred | 31 |
per month | 30 |
right angles | 30 |
tunnel line | 30 |
feet wide | 30 |
linear foot | 30 |
maximum load | 30 |
every one | 29 |
one side | 29 |
shield chambers | 29 |
capital stock | 29 |
st street | 29 |
specific gravity | 29 |
per linear | 29 |
yellow pine | 28 |
per shift | 28 |
north side | 28 |
per annum | 28 |
shelburne falls | 28 |
rapid transit | 28 |
west shaft | 28 |
fifth avenue | 27 |
testing machine | 27 |
average time | 27 |
one thing | 27 |
tunnel work | 27 |
hoosac mountain | 27 |
one day | 27 |
top heading | 27 |
cast iron | 27 |
greater part | 26 |
longleaf pine | 26 |
two years | 26 |
water pressure | 26 |
writer believes | 26 |
another portion | 25 |
wood pipe | 25 |
thames tunnel | 25 |
one time | 25 |
river division | 25 |
manhattan shaft | 25 |
water supply | 25 |
land tunnels | 25 |
york tunnel | 25 |
open cut | 24 |
first time | 24 |
feet high | 24 |
free air | 24 |
endwise compression | 24 |
york side | 24 |
douglas fir | 24 |
th june | 24 |
green condition | 24 |
screw piles | 24 |
per inch | 24 |
feet long | 24 |
hereby authorized | 24 |
first day | 23 |
station west | 23 |
town tunnels | 23 |
lineal feet | 23 |
will find | 23 |
february th | 23 |
may th | 23 |
latent heat | 23 |
robert stevenson | 23 |
eighth avenue | 23 |
two men | 23 |
three years | 23 |
rock bottom | 23 |
th aug | 22 |
soft material | 22 |
screw blade | 22 |
thousand lineal | 22 |
cross section | 22 |
dollars per | 22 |
cubic foot | 22 |
twin tunnel | 22 |
new orleans | 22 |
crushing strength | 22 |
north adams | 22 |
five hundred | 21 |
river tunnel | 21 |
two sections | 21 |
good deal | 21 |
steam shovel | 21 |
one thousand | 21 |
van der | 21 |
bore segments | 21 |
civil engineering | 21 |
york central | 21 |
assistant engineer | 21 |
structural materials | 21 |
manhattan side | 21 |
hill tunnels | 20 |
april th | 20 |
concrete design | 20 |
either side | 20 |
per lin | 20 |
pennsylvania tunnel | 20 |
two feet | 20 |
second edition | 20 |
neutral plane | 20 |
air per | 20 |
per per | 20 |
much less | 20 |
high water | 20 |
railroad corporations | 19 |
early part | 19 |
small clear | 19 |
rail sections | 19 |
july th | 19 |
per hour | 19 |
structural timbers | 19 |
steam engines | 19 |
six hundred | 19 |
railroad corporation | 19 |
federal investigations | 19 |
mine accidents | 19 |
scrip shall | 19 |
contracting company | 19 |
five per | 19 |
th july | 19 |
upper part | 19 |
skin friction | 19 |
terminal railroad | 19 |
sunnyside yard | 19 |
many years | 19 |
large beams | 19 |
eighteen hundred | 18 |
full page | 18 |
der hoek | 18 |
motive power | 18 |
special committee | 18 |
fine sand | 18 |
track tunnel | 18 |
took place | 18 |
dry wood | 18 |
cost per | 18 |
meadows division | 18 |
rings per | 18 |
three miles | 18 |
railway structure | 18 |
one man | 18 |
per mile | 18 |
short time | 18 |
eastern railroad | 18 |
per foot | 18 |
five thousand | 18 |
final report | 18 |
bending tests | 18 |
tensile strength | 18 |
arch action | 17 |
five feet | 17 |
much better | 17 |
static bending | 17 |
time taken | 17 |
four years | 17 |
page image | 17 |
solid rock | 17 |
instituted transactions | 17 |
civil engineer | 17 |
water tower | 17 |
earth pressure | 17 |
lower part | 17 |
years later | 17 |
public works | 17 |
transactions paper | 17 |
sinking fund | 17 |
thousand feet | 17 |
engineers instituted | 17 |
present time | 17 |
mixed rock | 17 |
atlantic avenue | 17 |
horse power | 17 |
southern vermont | 16 |
harrison transfer | 16 |
miles long | 16 |
thirty feet | 16 |
low water | 16 |
every man | 16 |
large number | 16 |
three days | 16 |
jersey side | 16 |
state scrip | 16 |
center heading | 16 |
york division | 16 |
test specimen | 16 |
face walls | 16 |
feet material | 16 |
deerfield river | 16 |
movable head | 16 |
every ft | 16 |
specimens will | 16 |
solid material | 16 |
time per | 16 |
twenty years | 16 |
march th | 16 |
concrete work | 16 |
vermont railroad | 16 |
street surface | 16 |
bulkhead wall | 16 |
excavated material | 16 |
broken plates | 16 |
central railroad | 15 |
lowell railroad | 15 |
york contracting | 15 |
five miles | 15 |
cubic feet | 15 |
square foot | 15 |
iron pipe | 15 |
erie railroad | 15 |
northern line | 15 |
loblolly pine | 15 |
rock cover | 15 |
short lengths | 15 |
help us | 15 |
th may | 15 |
even though | 15 |
six feet | 15 |
per ft | 15 |
tenth avenues | 15 |
latter part | 15 |
pipe line | 15 |
short distance | 15 |
cents per | 15 |
total cost | 15 |
three feet | 15 |
total deflection | 15 |
per sec | 15 |
cent cent | 15 |
will make | 15 |
american railway | 15 |
two tunnels | 15 |
practical treatise | 15 |
road east | 15 |
full width | 15 |
rock cut | 14 |
cement used | 14 |
working face | 14 |
bay ridge | 14 |
june st | 14 |
moisture content | 14 |
horizontal shear | 14 |
eleventh avenue | 14 |
will show | 14 |
wet dry | 14 |
el paso | 14 |
something like | 14 |
intermediate shaft | 14 |
compression tests | 14 |
ten per | 14 |
june th | 14 |
general electric | 14 |
two millions | 14 |
rock section | 14 |
flatbush avenue | 14 |
bridge seat | 14 |
mean high | 14 |
average progress | 14 |
made fast | 14 |
normal air | 14 |
well known | 14 |
two thousand | 14 |
hour shift | 14 |
broken stone | 14 |
fifty thousand | 14 |
far beyond | 14 |
driven tunnels | 14 |
face wall | 14 |
concrete piers | 14 |
december th | 14 |
thirty years | 14 |
table part | 14 |
subaqueous tunnels | 14 |
per yard | 14 |
maine railroad | 14 |
long enough | 14 |
duct bench | 14 |
ten years | 14 |
timber testing | 14 |
twin tunnels | 14 |
heading method | 14 |
tower subway | 13 |
concrete arch | 13 |
three hearty | 13 |
weight per | 13 |
may say | 13 |
three hundred | 13 |
test specimens | 13 |
surface railway | 13 |
hearty cheers | 13 |
rails shall | 13 |
peter logan | 13 |
timber bents | 13 |
shearing strength | 13 |
boston railroad | 13 |
franklin inst | 13 |
house line | 13 |
western hemlock | 13 |
set forth | 13 |
water main | 13 |
next day | 13 |
four times | 13 |
average rate | 13 |
smithsonian photo | 13 |
white oak | 13 |
four hours | 13 |
permanent steel | 13 |
growth rings | 13 |
hundred feet | 13 |
th century | 13 |
heavy sea | 13 |
great deal | 13 |
lighthouse yacht | 13 |
material will | 13 |
ninth avenues | 13 |
bench concrete | 13 |
iron piles | 13 |
mht model | 13 |
rock excavation | 13 |
just like | 13 |
thomas smith | 13 |
twenty thousand | 13 |
th sept | 13 |
pretty well | 13 |
bolting time | 13 |
white pine | 13 |
muck loaded | 12 |
crushed stone | 12 |
take care | 12 |
time required | 12 |
pennsylvania station | 12 |
shoring girders | 12 |
pennsylvania terminal | 12 |
resident engineers | 12 |
october th | 12 |
plate lxxiv | 12 |
shall take | 12 |
will soon | 12 |
typical cross | 12 |
strength values | 12 |
fibre stress | 12 |
compression across | 12 |
third street | 12 |
mortar gallery | 12 |
will go | 12 |
whole length | 12 |
plate xlvii | 12 |
west line | 12 |
track tunnels | 12 |
air cylinders | 12 |
total time | 12 |
tunnel superintendent | 12 |
one million | 12 |
rock core | 12 |
flat cars | 12 |
give us | 12 |
south wales | 12 |
western side | 12 |
working chamber | 12 |
east avenue | 12 |
hydrostatic head | 12 |
wood substance | 12 |
inch per | 12 |
fourteen feet | 12 |
two miles | 12 |
temporary shoring | 12 |
far enough | 12 |
state control | 12 |
six months | 12 |
inches wide | 12 |
million dollars | 12 |
plate xlviii | 12 |
every day | 12 |
american woods | 12 |
four feet | 12 |
eight hundred | 12 |
state engineer | 12 |
single track | 12 |
test pieces | 12 |
average cost | 12 |
treasure island | 12 |
lower end | 12 |
org ebooks | 12 |
pump chamber | 12 |
full face | 12 |
cell walls | 12 |
seven years | 12 |
clear water | 12 |
permanent viaduct | 12 |
nogal reservoir | 11 |
pressure due | 11 |
testing materials | 11 |
first crack | 11 |
dead load | 11 |
box drains | 11 |
structural timber | 11 |
steel rails | 11 |
previously described | 11 |
good many | 11 |
mica schist | 11 |
blacksmith shop | 11 |
early wood | 11 |
common name | 11 |
point ft | 11 |
large quantities | 11 |
sixth avenue | 11 |
river bulkhead | 11 |
damage done | 11 |
great northern | 11 |
three times | 11 |
railway company | 11 |
total weight | 11 |
bearing value | 11 |
per lbs | 11 |
one another | 11 |
will probably | 11 |
cortlandt street | 11 |
feet inches | 11 |
great care | 11 |
false bottom | 11 |
brick arch | 11 |
large proportion | 11 |
almost every | 11 |
plate xiii | 11 |
progress made | 11 |
dry material | 11 |
three thousand | 11 |
transverse girders | 11 |
working force | 11 |
lock bulkhead | 11 |
james watt | 11 |
plate lii | 11 |
timber tests | 11 |
railroad tracks | 11 |
track level | 11 |
new south | 11 |
cement mortar | 11 |
per hours | 11 |
soho works | 11 |
young men | 11 |
one hand | 11 |
many cases | 11 |
company may | 11 |
may well | 11 |
capstan bars | 11 |
bolt holes | 11 |
will never | 11 |
various parts | 11 |
will come | 11 |
august th | 11 |
top charges | 11 |
lineal foot | 11 |
breast boards | 11 |
th cong | 11 |
dry sand | 11 |
large enough | 11 |
hydraulic pressure | 11 |
state management | 11 |
river bridge | 11 |
last night | 11 |
eighth avenues | 10 |
raker braces | 10 |
two lines | 10 |
hydraulic grade | 10 |
became necessary | 10 |
one year | 10 |
two tracks | 10 |
photo courtesy | 10 |
frictional resistance | 10 |
two days | 10 |
cutting edges | 10 |
second street | 10 |
little people | 10 |
plate lix | 10 |
third streets | 10 |
plate xii | 10 |
carried away | 10 |
river bottom | 10 |
pile shaft | 10 |
cast steel | 10 |
two points | 10 |
intercepting arch | 10 |
plate lxii | 10 |
plain concrete | 10 |
railroad commissioners | 10 |
service cir | 10 |
great britain | 10 |
five times | 10 |
earth pressures | 10 |
frost splits | 10 |
will also | 10 |
masonry lining | 10 |
northern lights | 10 |
pressure air | 10 |
principal beams | 10 |
exploration drift | 10 |
plate lxxiii | 10 |
bell rung | 10 |
also used | 10 |
des bois | 10 |
plate li | 10 |
mixed bottom | 10 |
bolted together | 10 |
green material | 10 |
long time | 10 |
shield method | 10 |
heading oct | 10 |
one part | 10 |
say nothing | 10 |
eight feet | 10 |
large amount | 10 |
central track | 10 |
hour shifts | 10 |
concrete water | 10 |
rolling stock | 10 |
air lock | 10 |
complete failure | 10 |
two parts | 10 |
cold water | 10 |
electric motor | 10 |
will now | 10 |
general superintendent | 10 |
upper end | 10 |
seven miles | 10 |
shall see | 10 |
look back | 10 |
unavoidable delays | 10 |
terminal facilities | 10 |
east line | 10 |
years old | 10 |
massachusetts railroad | 10 |
old age | 10 |
one else | 10 |
steel rods | 10 |
without breaking | 10 |
shield chamber | 10 |
large quantity | 10 |
one tunnel | 10 |
water power | 10 |
clear pieces | 10 |
compression parallel | 10 |
whole time | 10 |
locomotive performance | 10 |
tunnel excavation | 10 |
much greater | 10 |
cement concrete | 10 |
large scale | 10 |
will see | 10 |
three months | 10 |
november th | 10 |
western larch | 10 |
hydrostatic pressure | 10 |
full size | 10 |
memoir prepared | 10 |
fifty feet | 10 |
table showing | 10 |
ground tunneling | 10 |
different kinds | 10 |
taken place | 10 |
bridge company | 10 |
tests will | 10 |
hackensack river | 10 |
final position | 9 |
railway columns | 9 |
three hours | 9 |
good enough | 9 |
various lengths | 9 |
will take | 9 |
cement grout | 9 |
chief office | 9 |
new line | 9 |
ordinary cast | 9 |
impact bending | 9 |
working plan | 9 |
various operations | 9 |
sir joseph | 9 |
aqueous material | 9 |
green dry | 9 |
general plan | 9 |
described later | 9 |
powder used | 9 |
one pound | 9 |
tension test | 9 |
east heading | 9 |
rock center | 9 |
middle heading | 9 |
material trestle | 9 |
main line | 9 |
one inch | 9 |
driven tunnel | 9 |
deerfield dam | 9 |
railway engineering | 9 |
first street | 9 |
taper rings | 9 |
least one | 9 |
time spent | 9 |
steam cylinders | 9 |
ten feet | 9 |
neat cement | 9 |
transfer station | 9 |
artificers landed | 9 |
avenue improvement | 9 |
within ft | 9 |
lined tunnels | 9 |
soft clay | 9 |
part ii | 9 |
plate lviii | 9 |
nine hundred | 9 |
captain wilson | 9 |
estimated cost | 9 |
majority bill | 9 |
one place | 9 |
springing line | 9 |
specifications required | 9 |
way ducts | 9 |
cold weather | 9 |
one half | 9 |
connecting railroad | 9 |
considerable time | 9 |
shortleaf pine | 9 |
lunar society | 9 |
inside bucket | 9 |
railroad system | 9 |
inch deflection | 9 |
grout pipes | 9 |
take place | 9 |
iron tunnel | 9 |
tunnel section | 9 |
rock lighthouse | 9 |
nothing else | 9 |
timber physics | 9 |
work will | 9 |
human nature | 9 |
tractive power | 9 |
york connecting | 9 |
plate lxx | 9 |
state treasurer | 9 |
also made | 9 |
act shall | 9 |
four hundred | 9 |
subaqueous tunnel | 9 |
river shafts | 9 |
third edition | 9 |
see table | 9 |
watt engine | 9 |
city station | 9 |
electric conduits | 9 |
least ft | 9 |
great many | 9 |
total length | 9 |
every case | 9 |
hrs min | 9 |
cheap transportation | 9 |
santa rosa | 9 |
see also | 9 |
commonwealth shall | 9 |
numerous illustrations | 9 |
electric motors | 9 |
forty years | 9 |
last year | 9 |
later years | 9 |
hundred miles | 9 |
great importance | 9 |
plate lx | 9 |
southwestern railway | 9 |
amount paid | 9 |
engineering staff | 9 |
bending test | 9 |
bonito creek | 9 |
force employed | 9 |
typical working | 9 |
rear end | 9 |
river railroad | 9 |
shear along | 9 |
tunnel railroad | 9 |
amount earned | 8 |
several years | 8 |
great measure | 8 |
train service | 8 |
first failure | 8 |
finally decided | 8 |
two sets | 8 |
twenty feet | 8 |
grand trunk | 8 |
green wood | 8 |
eastern end | 8 |
pressure per | 8 |
water mains | 8 |
different methods | 8 |
applied water | 8 |
per week | 8 |
bag batch | 8 |
capstan head | 8 |
static tests | 8 |
twelve noon | 8 |
outside diameter | 8 |
mortgage bonds | 8 |
timber trestle | 8 |
actual cost | 8 |
entire length | 8 |
central rock | 8 |
railroad companies | 8 |
near greenfield | 8 |
large part | 8 |
center lines | 8 |
south tunnel | 8 |
passenger traffic | 8 |
royal society | 8 |
tunnel company | 8 |
plant depreciation | 8 |
construction work | 8 |
completed tunnel | 8 |
clearly shown | 8 |
water will | 8 |
prime minister | 8 |
high tide | 8 |
manhattan railroad | 8 |
caulking pockets | 8 |
high pressure | 8 |
consulting engineer | 8 |
western line | 8 |
states national | 8 |
weehawken side | 8 |
short column | 8 |
first step | 8 |
royal vo | 8 |
six years | 8 |
man must | 8 |
certain amount | 8 |
low tide | 8 |
lighthouse service | 8 |
one point | 8 |
compressive stress | 8 |
heavy swell | 8 |
poling boards | 8 |
foreman builder | 8 |
machine drills | 8 |
state library | 8 |
ultimate strength | 8 |
intermediate shafts | 8 |
total number | 8 |
will give | 8 |
inch pipe | 8 |
field office | 8 |
swamp white | 8 |
pumping main | 8 |
concrete pier | 8 |
log sheet | 8 |
plate lxiv | 8 |
private property | 8 |
packing boxes | 8 |
stave pipe | 8 |
distance piece | 8 |
plate lxviii | 8 |
rock tunneling | 8 |
two additional | 8 |
first patent | 8 |
grade crossings | 8 |
norway pine | 8 |
per unit | 8 |
experiments made | 8 |
different parts | 8 |
average ratio | 8 |
table summary | 8 |
green river | 8 |
queens borough | 8 |
land tunnel | 8 |
leg derricks | 8 |
large area | 8 |
directors voted | 8 |
almost entirely | 8 |
two shafts | 8 |
permanent shafts | 8 |
two main | 8 |
great west | 8 |
number progress | 8 |
part earth | 8 |
concrete walls | 8 |
first two | 8 |
pile foundations | 8 |
cross grain | 8 |
western yellow | 8 |
sliding platform | 8 |
eastern terminus | 8 |
hoisting engines | 8 |
compressive strength | 8 |
summer wood | 8 |
table gives | 8 |
various kinds | 8 |
steel plate | 8 |
transportation tax | 8 |
january th | 8 |
commonly used | 8 |
per ton | 8 |
bad weather | 8 |
gross earnings | 8 |
full height | 8 |
plate xlix | 8 |
traveling stage | 8 |
rubble masonry | 8 |
avenue shafts | 8 |
materials delivered | 8 |
first section | 8 |
lehigh valley | 8 |
four miles | 8 |
summary part | 8 |
south shaft | 8 |
professor black | 8 |
hundred pounds | 8 |
top headings | 8 |
rob roy | 8 |
passed away | 8 |
something else | 8 |
part rock | 8 |
filtered water | 8 |
may prove | 8 |
shield doors | 8 |
set apart | 8 |
newcomen engine | 8 |
two boats | 8 |
greatly increased | 8 |
arching properties | 8 |
many instances | 8 |
great value | 8 |
per year | 8 |
intimate friend | 8 |
ninth ave | 8 |
previously mentioned | 7 |
steel tank | 7 |
watt wrote | 7 |
disc piles | 7 |
shall become | 7 |
francis mason | 7 |
general foreman | 7 |
bending large | 7 |
way association | 7 |
double track | 7 |
viaduct girders | 7 |
commissioners shall | 7 |
scientific american | 7 |
fifteen feet | 7 |
four tunnels | 7 |
working pressure | 7 |
failure occurs | 7 |
part thereof | 7 |
contract dated | 7 |
national museum | 7 |
whole line | 7 |
many places | 7 |
heavy traffic | 7 |
upper surface | 7 |
expanded metal | 7 |
eighteen feet | 7 |
office administration | 7 |
plate xxix | 7 |
part cement | 7 |
many things | 7 |
anything like | 7 |
hardwoods ash | 7 |
one word | 7 |
will become | 7 |
clair tunnel | 7 |
small beams | 7 |
steel viaduct | 7 |
steam locomotives | 7 |
little less | 7 |
heavy timbering | 7 |
street pier | 7 |
deflecton curves | 7 |
will agree | 7 |
tunnel lines | 7 |
takes place | 7 |
structural steel | 7 |
new concrete | 7 |
alfred noble | 7 |
placing concrete | 7 |
north shaft | 7 |
tells us | 7 |
iii iii | 7 |
track system | 7 |
private corporation | 7 |
single tunnel | 7 |
sump segment | 7 |
act authorizing | 7 |
several times | 7 |
tons per | 7 |
one piece | 7 |
three per | 7 |
satisfactory evidence | 7 |
much easier | 7 |
reinforcing rods | 7 |
concrete wall | 7 |
eugene klapp | 7 |
thousand pounds | 7 |
large timbers | 7 |
soon became | 7 |
will tell | 7 |
great enterprise | 7 |
facing mixture | 7 |
iv iv | 7 |
john newman | 7 |
one mile | 7 |
excavation per | 7 |
electric traction | 7 |
hundred horse | 7 |
will break | 7 |
fourth edition | 7 |
cleavage test | 7 |
showing method | 7 |
new ones | 7 |
tests made | 7 |
dry condition | 7 |
second air | 7 |
inches long | 7 |
river bed | 7 |
great extent | 7 |
natural philosophy | 7 |
take effect | 7 |
heading feb | 7 |
cent per | 7 |
pier construction | 7 |
shall never | 7 |
steam shovels | 7 |
francis watt | 7 |
high degree | 7 |
applied mechanics | 7 |
like us | 7 |
mathematical instrument | 7 |
old partner | 7 |
average force | 7 |
cent moisture | 7 |
rock tunnels | 7 |
tunnel will | 7 |
many people | 7 |
electric locomotives | 7 |
bending strength | 7 |
curves beam | 7 |
width heading | 7 |
ii ii | 7 |
lord kelvin | 7 |
passenger station | 7 |
refuge niches | 7 |
six thousand | 7 |
good work | 7 |
tunnel roof | 7 |
wood engravings | 7 |
dear sir | 7 |
two small | 7 |
transfer yard | 7 |
north tunnel | 7 |
joseph banks | 7 |
th avenue | 7 |
twenty per | 7 |
easterly line | 7 |
cross sections | 7 |
northern lighthouses | 7 |
little doubt | 7 |
south abutment | 7 |
last ring | 7 |
strain diagram | 7 |
tunnel engineering | 7 |
mississippi valley | 7 |
two classes | 7 |
longitudinal shear | 7 |
southern pine | 7 |
eighty thousand | 7 |
four months | 7 |
water used | 7 |
bulkhead line | 7 |
pressure compressors | 7 |
natural history | 7 |
good condition | 7 |
monthly progress | 7 |
good order | 7 |
terminal site | 7 |
fair isle | 7 |
present day | 7 |
steel plates | 7 |
hearth steel | 7 |
creosoted timber | 7 |
air dry | 7 |
northern railroad | 7 |
state board | 7 |
january st | 7 |
osage orange | 7 |
porous woods | 7 |
long ago | 7 |
clear specimens | 7 |
mississippi river | 7 |
whole amount | 7 |
great man | 7 |
one way | 7 |
rock drills | 7 |
average number | 7 |
freight terminal | 7 |
inside diameter | 7 |
bottom headings | 7 |
table shows | 7 |
part iii | 7 |
creosote oil | 7 |
valley railroad | 7 |
good weather | 7 |
great work | 7 |
belt conveyor | 7 |
earth excavation | 7 |
september th | 7 |
aqueous materials | 7 |
per shield | 7 |
inches thick | 7 |
hundred dollars | 7 |
river line | 7 |
honest man | 7 |
eight inches | 7 |
full hydrostatic | 7 |
every possible | 7 |
whole work | 7 |
glasgow university | 7 |
anything else | 7 |
new methods | 7 |
machine shop | 7 |
factors affecting | 7 |
finally adopted | 7 |
heading nov | 7 |
construction company | 7 |
directly beneath | 7 |
harrison yard | 7 |
vertical section | 7 |
th ave | 7 |
mean total | 7 |
actually paid | 7 |
fiber stress | 7 |
deflection log | 7 |
west portal | 6 |
upper face | 6 |
york station | 6 |
transverse tests | 6 |
ordinary iron | 6 |
results obtained | 6 |
lowest point | 6 |
first part | 6 |
will increase | 6 |
boston freight | 6 |
one shield | 6 |
st sess | 6 |
per drill | 6 |
already described | 6 |
tar pitch | 6 |
permanent structures | 6 |
disposal trestle | 6 |
annual convention | 6 |
heavy cast | 6 |
engineer say | 6 |
without much | 6 |
public opinion | 6 |
built without | 6 |
increased cost | 6 |
twenty pounds | 6 |
instrument maker | 6 |
will stand | 6 |
unit stress | 6 |
ten thousand | 6 |
will follow | 6 |
freight yard | 6 |
sand used | 6 |
one case | 6 |
near squeak | 6 |
radial joints | 6 |
will remain | 6 |
total pressure | 6 |
july st | 6 |
pacific coast | 6 |
segmental timbering | 6 |
half inch | 6 |
sharp sand | 6 |
hydraulic jacks | 6 |
horizontal diameter | 6 |
open air | 6 |
far away | 6 |
black powder | 6 |
beyond question | 6 |
city lots | 6 |
great interest | 6 |
watt writes | 6 |
directly proportional | 6 |
south end | 6 |
captain wemyss | 6 |
house doc | 6 |
burleigh drill | 6 |
vehicular traffic | 6 |
general way | 6 |
impact tests | 6 |
steel bolts | 6 |
important consideration | 6 |
grade line | 6 |
ph oe | 6 |
bed mortar | 6 |
load will | 6 |
past eight | 6 |
much water | 6 |
random memories | 6 |
united engineering | 6 |
plate xxviii | 6 |
rich man | 6 |
plate lxi | 6 |
inch hardwoods | 6 |
laying mandrel | 6 |
rock middle | 6 |
tunneling shields | 6 |
first air | 6 |
total labor | 6 |
tunnel transport | 6 |
ground encountered | 6 |
sir walter | 6 |
special legislation | 6 |
wind shifted | 6 |
iron workers | 6 |
miles away | 6 |
new shaft | 6 |
many others | 6 |
every point | 6 |
great pressure | 6 |
deeply interested | 6 |
pure water | 6 |
short columns | 6 |
royal mo | 6 |
considerable portion | 6 |
per horse | 6 |
lower face | 6 |
invert concrete | 6 |
just east | 6 |
ten pounds | 6 |
wall plant | 6 |
thousand eight | 6 |
hold back | 6 |
dated april | 6 |
time total | 6 |
twenty miles | 6 |
engineering construction | 6 |
lateral pressure | 6 |
longitudinal reinforcement | 6 |
data obtained | 6 |
water pressures | 6 |
two million | 6 |
walled cells | 6 |
street level | 6 |
will always | 6 |
drilling machines | 6 |
static testing | 6 |
much trouble | 6 |
southern pacific | 6 |
external forces | 6 |
th oct | 6 |
half feet | 6 |
beyond doubt | 6 |
four thousand | 6 |
soon found | 6 |
timber piles | 6 |
repair shops | 6 |
like manner | 6 |
fibre strain | 6 |
grand total | 6 |
east new | 6 |
entirely satisfactory | 6 |
cylinder bridge | 6 |
des holzes | 6 |
shield advanced | 6 |
straight line | 6 |
different species | 6 |
island reef | 6 |
total field | 6 |
strong enough | 6 |
considerable extent | 6 |
inch inch | 6 |
two hours | 6 |
many respects | 6 |
avenue elevated | 6 |
professor robison | 6 |
one month | 6 |
frequent intervals | 6 |
hardwood timbers | 6 |
make us | 6 |
coarse aggregate | 6 |
hydraulic method | 6 |
much time | 6 |
bored pipe | 6 |
usual way | 6 |
square inches | 6 |
hand labor | 6 |
chapter two | 6 |
shall pay | 6 |
one kind | 6 |
several feet | 6 |
truck period | 6 |
per barrel | 6 |
hoisting apparatus | 6 |
opposite sides | 6 |
much chance | 6 |
forest products | 6 |
new one | 6 |
fine material | 6 |
leading end | 6 |
external diameter | 6 |
seamen term | 6 |
driven westward | 6 |
tunnel invert | 6 |
rock drill | 6 |
may become | 6 |
hoisting engine | 6 |
demy vo | 6 |
iron company | 6 |
mortar equivalent | 6 |
two types | 6 |
sized twin | 6 |
sliding platforms | 6 |
loan act | 6 |
island shaft | 6 |
heavy iron | 6 |
without delay | 6 |
slow growth | 6 |
arching action | 6 |
seven thousand | 6 |
total average | 6 |
higher parts | 6 |
henry steers | 6 |
including time | 6 |
deep water | 6 |
railway association | 6 |
west shore | 6 |
inches per | 6 |
two instances | 6 |
tensile stress | 6 |
mechanical engineer | 6 |
thirty per | 6 |
tunnel shall | 6 |
state credit | 6 |
partly filled | 6 |
river lines | 6 |
two months | 6 |
wall sections | 6 |
tunnels fig | 6 |
pipe laid | 6 |
first made | 6 |
per gallon | 6 |
day work | 6 |
river front | 6 |
much higher | 6 |
council shall | 6 |
great difficulty | 6 |
tests mois | 6 |
end heading | 6 |
leg derrick | 6 |
ordinary sand | 6 |
went away | 6 |
front street | 6 |
avenue terminal | 6 |
present location | 6 |
first instance | 6 |
ultimate load | 6 |
miles per | 6 |
north sea | 6 |
iron rings | 6 |
work included | 6 |
hard soil | 6 |
old soldier | 6 |
five minutes | 6 |
hard material | 6 |
freight traffic | 6 |
island shafts | 6 |
multiple ducts | 6 |
broadway subway | 6 |
per thousand | 6 |
give way | 6 |
without caulking | 6 |
interest thereon | 6 |
bench method | 6 |
water may | 6 |
various forms | 6 |
middle wall | 6 |
may seem | 6 |
pier head | 6 |
close together | 6 |
passenger yard | 6 |
ratio average | 6 |
export trade | 6 |
civil war | 6 |
aqueous pressure | 6 |
will cost | 6 |
rock sections | 6 |
pressure compressor | 6 |
average man | 6 |
torsion test | 6 |
just west | 6 |
building operations | 6 |
generating plant | 6 |
small amount | 6 |
pass away | 6 |
water content | 6 |
mechanical power | 6 |
past seven | 6 |
plate xxvii | 6 |
will cause | 6 |
every step | 6 |
st ave | 6 |
writer took | 6 |
linear feet | 6 |
young jack | 6 |
early years | 6 |
general arrangement | 6 |
railroad station | 6 |
say anything | 6 |
unfinished portion | 6 |
six inches | 6 |
shall receive | 6 |
fine weather | 6 |
acting engine | 6 |
fifty years | 6 |
fourth inch | 6 |
six per | 6 |
tunnels east | 6 |
field charges | 6 |
tissue paper | 6 |
upper deck | 6 |
inch sq | 6 |
robinson crusoe | 6 |
alvah crocker | 6 |
room floor | 6 |
elevated railroad | 6 |
eight hours | 6 |
man may | 6 |
extra profit | 6 |
gives us | 6 |
still continued | 6 |
hot water | 6 |
bridge piers | 5 |
moist sand | 5 |
see speed | 5 |
per lineal | 5 |
john henderson | 5 |
successful operation | 5 |
thousand horse | 5 |
knew nothing | 5 |
sheet metal | 5 |
must necessarily | 5 |
field engineering | 5 |
medullary rays | 5 |
several kinds | 5 |
concrete base | 5 |
ten days | 5 |
plan showing | 5 |
must always | 5 |
seven times | 5 |
second section | 5 |
steam cylinder | 5 |
forms may | 5 |
different times | 5 |
railroad shall | 5 |
water per | 5 |
elevated tank | 5 |
nd june | 5 |
seven hours | 5 |
sliding hoods | 5 |
clay blanket | 5 |
whole thing | 5 |
voces fidelium | 5 |
concrete retaining | 5 |
transverse bending | 5 |
chief draftsman | 5 |
twisted rods | 5 |
erecting iron | 5 |
one direction | 5 |
whole area | 5 |
march st | 5 |
beretania street | 5 |
surface transportation | 5 |
solid piles | 5 |
serious difficulties | 5 |
old one | 5 |
working compartments | 5 |
reader may | 5 |
total per | 5 |
present state | 5 |
spiral grain | 5 |
useful information | 5 |
natural slope | 5 |
manual laborers | 5 |
moisture determination | 5 |
make sure | 5 |
turn round | 5 |
boats left | 5 |
brick sewer | 5 |
dollars shall | 5 |
manhattan island | 5 |
luther elman | 5 |
near shave | 5 |
money matters | 5 |
axis level | 5 |
adjusting specimen | 5 |
south pass | 5 |
terminal yard | 5 |
one corporation | 5 |
also voted | 5 |
chief assistant | 5 |
white spruce | 5 |
minority bill | 5 |
kenneth allen | 5 |
total quantity | 5 |
six millions | 5 |
lower portion | 5 |
central portion | 5 |
engineering profession | 5 |
wait till | 5 |
may now | 5 |
north end | 5 |
one operation | 5 |
grout ejected | 5 |
literary work | 5 |
erector runner | 5 |
may even | 5 |
one element | 5 |
several apartments | 5 |
gilt edges | 5 |
detailed description | 5 |
will retain | 5 |
hundred years | 5 |
open stand | 5 |
salt water | 5 |
first period | 5 |
trustees shall | 5 |
eight years | 5 |
static theory | 5 |
surface transport | 5 |
weehawken tunnels | 5 |
hard gale | 5 |
european tunnels | 5 |
cable conduits | 5 |
rock works | 5 |
another way | 5 |
one face | 5 |
time min | 5 |
full section | 5 |
leaf yellow | 5 |
wood fibres | 5 |
shield jacks | 5 |
great quantities | 5 |
old pal | 5 |
large portion | 5 |
enough money | 5 |
charles alfred | 5 |
short length | 5 |
excavating ahead | 5 |
prose writer | 5 |
every respect | 5 |
will undoubtedly | 5 |
private life | 5 |
greater portion | 5 |
transportation problem | 5 |
pure air | 5 |
swept away | 5 |
pressure will | 5 |
will prevent | 5 |
chapter ii | 5 |
transit trains | 5 |
whole gang | 5 |
neat line | 5 |
superheated steam | 5 |
rod reinforcement | 5 |
without exception | 5 |
railroad leading | 5 |
never knew | 5 |
results will | 5 |
five days | 5 |
every direction | 5 |
views showing | 5 |
may perhaps | 5 |
either end | 5 |
much good | 5 |
cup shake | 5 |
good results | 5 |
practical purposes | 5 |
materials required | 5 |
rock packing | 5 |
three sections | 5 |
several hours | 5 |
three inches | 5 |
blackwall tunnel | 5 |
proper place | 5 |
might occur | 5 |
operations involved | 5 |
chapter iii | 5 |
still kept | 5 |
appointed chief | 5 |
applied continuously | 5 |
plate ix | 5 |
one occasion | 5 |
every description | 5 |
land damages | 5 |
building material | 5 |
east rivers | 5 |
seven hundred | 5 |
six times | 5 |
state ownership | 5 |
road shall | 5 |
whole state | 5 |
industrial interests | 5 |
impact testing | 5 |
james glen | 5 |
pushing back | 5 |
may yet | 5 |
railroad facilities | 5 |
just now | 5 |
small gang | 5 |
short posts | 5 |
dated august | 5 |
laid aside | 5 |
simple beam | 5 |
firm sand | 5 |
various methods | 5 |
evidence shall | 5 |
westerly side | 5 |
native town | 5 |
lost time | 5 |
two double | 5 |
sufficient power | 5 |
iron tube | 5 |
careful consideration | 5 |
material may | 5 |
fibre walls | 5 |
great force | 5 |
spaced ft | 5 |
floating stage | 5 |
steam power | 5 |
sur les | 5 |
good man | 5 |
show us | 5 |
great part | 5 |
engineer came | 5 |
twelve feet | 5 |
work together | 5 |
line will | 5 |
west portion | 5 |
also shown | 5 |
important part | 5 |
made possible | 5 |
building materials | 5 |
young gentleman | 5 |
temporary platform | 5 |
december st | 5 |
may hereafter | 5 |
voids outside | 5 |
heart shake | 5 |
railroad traffic | 5 |
total amount | 5 |
heading mar | 5 |
inch thick | 5 |
nineteenth century | 5 |
showing condition | 5 |
much harder | 5 |
nine feet | 5 |
man ever | 5 |
sixteen feet | 5 |
much beyond | 5 |
nearly one | 5 |
south tunnels | 5 |
sketch showing | 5 |
one power | 5 |
past one | 5 |
formerly noticed | 5 |
wales hardwood | 5 |
pressure required | 5 |
took possession | 5 |
twisted steel | 5 |
storage bins | 5 |
half way | 5 |
upper course | 5 |
plate xxxv | 5 |
sufficiently large | 5 |
human life | 5 |
pressure exerted | 5 |
permanent bench | 5 |
eastern side | 5 |
past nine | 5 |
inner portion | 5 |
bore segment | 5 |
general design | 5 |
readers will | 5 |
table xiv | 5 |
take possession | 5 |
two sides | 5 |
outside tracks | 5 |
general manager | 5 |
three sets | 5 |
hackensack meadows | 5 |
general supervision | 5 |
completed previously | 5 |
station building | 5 |
square twisted | 5 |
growth ring | 5 |
avenue structures | 5 |
three cheers | 5 |
general reader | 5 |
heavy ground | 5 |
year eighteen | 5 |
payments made | 5 |
arch thrust | 5 |
within three | 5 |
good sense | 5 |
freezing process | 5 |
bench walls | 5 |
broken rock | 5 |
concrete may | 5 |
work began | 5 |
corporate management | 5 |
extension project | 5 |
materials used | 5 |
part ave | 5 |
fall back | 5 |
small pieces | 5 |
time ago | 5 |
due regard | 5 |
road west | 5 |
steel ring | 5 |
ship canal | 5 |
left behind | 5 |
carried forward | 5 |
shearing stresses | 5 |
general type | 5 |
first ring | 5 |
principal contract | 5 |
simple matter | 5 |
upper platform | 5 |
brick masonry | 5 |
side thrust | 5 |
hand drilling | 5 |
smooth surface | 5 |
somewhat similar | 5 |
water deprived | 5 |
must draw | 5 |
issue scrip | 5 |
approved april | 5 |
hydraulic fittings | 5 |
man might | 5 |
always kept | 5 |
behind us | 5 |
pipe joints | 5 |
heading jan | 5 |
much lower | 5 |
burleigh machine | 5 |
tube tunnels | 5 |
done much | 5 |
york shield | 5 |
lift rail | 5 |
new hampshire | 5 |
connecting roads | 5 |
general laws | 5 |
must say | 5 |
make money | 5 |
deceased members | 5 |
big shellbark | 5 |
east house | 5 |
moved ahead | 5 |
watt found | 5 |
will depend | 5 |
avenue eastward | 5 |
became much | 5 |
two portions | 5 |
single tunnels | 5 |
per second | 5 |
make one | 5 |
exposed surfaces | 5 |
first thing | 5 |
foggy weather | 5 |
full pressure | 5 |
running yard | 5 |
mechanical tests | 5 |
surface structures | 5 |
old woman | 5 |
good faith | 5 |
night long | 5 |
iron sewer | 5 |
never saw | 5 |
chemical composition | 5 |
lower ft | 5 |
nine years | 5 |
died march | 5 |
one horse | 5 |
section gy | 5 |
sufficient number | 5 |
herman haupt | 5 |
three quarters | 5 |
rolling motion | 5 |
island shields | 5 |
miles apart | 5 |
considerable difficulty | 5 |
treasurer shall | 5 |
assistant engineers | 5 |
absolutely dry | 5 |
put together | 5 |
gas pipes | 5 |
first year | 5 |
concrete form | 5 |
much larger | 5 |
quite different | 5 |
original design | 5 |
respective boats | 5 |
leaf pine | 5 |
looked like | 5 |
public service | 5 |
linus weed | 5 |
tunnel sections | 5 |
bring us | 5 |
year one | 5 |
mixing plant | 5 |
first course | 5 |
two single | 5 |
monthly estimates | 5 |
engineering news | 5 |
samuel rea | 5 |
internal stresses | 5 |
cubic per | 5 |
trees growing | 5 |
shield showing | 5 |
felt sure | 5 |
moved along | 5 |
pipe will | 5 |
atmospheric pressure | 5 |
parts sand | 5 |
permanent lining | 5 |
teach us | 5 |
transverse section | 5 |
ever since | 5 |
typical sections | 5 |
come back | 5 |
first one | 5 |
erector ram | 5 |
spring wood | 5 |
station will | 5 |
shear tests | 5 |
four men | 5 |
still continuing | 5 |
common forms | 5 |
transportation plant | 5 |
two large | 5 |
recent years | 5 |
live load | 5 |
let go | 5 |
underground portions | 5 |
good concrete | 5 |
annual rings | 5 |
annual meeting | 5 |
payable semi | 5 |
will say | 5 |
actual work | 5 |
test holes | 5 |
rail committee | 5 |
speedy completion | 5 |
sand arch | 5 |
plate xxiv | 5 |
kinnaird head | 5 |
pit excavation | 5 |
two specimens | 5 |
average amount | 5 |
gas company | 5 |
oblique shear | 5 |
unit unit | 5 |
trunk lines | 5 |
william arthur | 5 |
previously referred | 5 |
longitudinal section | 5 |
england states | 5 |
best way | 5 |
average working | 5 |
first appearance | 5 |
heading sept | 5 |
standard section | 5 |
earth section | 5 |
maximum pressure | 5 |
nowhere else | 5 |
good thing | 5 |
permanent way | 5 |
th streets | 5 |
new lines | 5 |
cut sections | 5 |
tight concrete | 5 |
old lady | 5 |
never heard | 5 |
building tunnel | 5 |
whole day | 5 |
careful study | 5 |
original intention | 5 |
albert mather | 5 |
dome forms | 5 |
survey lines | 5 |
entire face | 5 |
specially designed | 5 |
busily employed | 5 |
french revolution | 5 |
cape wrath | 5 |
cover section | 5 |
considerably less | 5 |
various woods | 5 |
specimen will | 5 |
elastic resilience | 5 |
loose sand | 5 |
eight men | 5 |
one line | 5 |
speaking race | 5 |
took care | 5 |
pumping station | 5 |
feet distant | 5 |
trap rock | 5 |
found necessary | 5 |
ordinary static | 5 |
section paper | 5 |
suez canal | 5 |
timber used | 5 |
top timbers | 5 |
working chambers | 5 |
treated timber | 5 |
permanent cast | 5 |
block lagging | 5 |
looking back | 5 |
lay aside | 5 |
ordinary type | 5 |
greater depth | 5 |
large beam | 5 |
locking device | 5 |
considered safe | 4 |
probable cost | 4 |
act together | 4 |
screw cutting | 4 |
short description | 4 |
mechanical genius | 4 |
nearly every | 4 |
common use | 4 |
inventive genius | 4 |
white ash | 4 |
total force | 4 |
scamping tricks | 4 |
rock excavated | 4 |
et seq | 4 |
static loading | 4 |
fixed hood | 4 |
watt knew | 4 |
many points | 4 |
chapter iv | 4 |
street shaft | 4 |
electric cables | 4 |
dock plant | 4 |
time within | 4 |
twelve men | 4 |
earth poling | 4 |
burleigh rock | 4 |
vertical diameter | 4 |
seasoned material | 4 |
sea broke | 4 |
continued efforts | 4 |
work advanced | 4 |
executive ability | 4 |
pine timber | 4 |
arching effect | 4 |
one stiff | 4 |
next year | 4 |
schist center | 4 |
die festigkeit | 4 |
one must | 4 |
rock going | 4 |
enables us | 4 |
backward stroke | 4 |
air line | 4 |
long since | 4 |
permanent load | 4 |
may seek | 4 |
heat will | 4 |
wet sand | 4 |
one dollar | 4 |
storrow says | 4 |
heading dec | 4 |
temporary structures | 4 |
business transactions | 4 |
work may | 4 |
second bulkhead | 4 |
drying proceeds | 4 |
full length | 4 |
shall find | 4 |
best game | 4 |
hydraulic jack | 4 |
father damien | 4 |
different points | 4 |
curb line | 4 |
forces act | 4 |
vertical boiler | 4 |
physical properties | 4 |
metal forms | 4 |
well enough | 4 |
west shafts | 4 |
steam railroad | 4 |
steam expansively | 4 |
sized tunnel | 4 |
faithful performance | 4 |
sea water | 4 |
tremulous motion | 4 |
given turbidity | 4 |
guide frame | 4 |
stresses due | 4 |
special tests | 4 |
timber beams | 4 |
free water | 4 |
oil used | 4 |
quite right | 4 |
soft rock | 4 |
pile will | 4 |
cutting ring | 4 |
laying concrete | 4 |
concave side | 4 |
fowler warehouse | 4 |
railroad managers | 4 |
manufactured goods | 4 |
certain conditions | 4 |
one boat | 4 |
foremen foremen | 4 |
various ways | 4 |
four groups | 4 |
implement woods | 4 |
thought proper | 4 |
made without | 4 |
two things | 4 |
shaft sites | 4 |
bulkhead walls | 4 |
dumping board | 4 |
shoving shield | 4 |
hundred men | 4 |
certain quantity | 4 |
middle drain | 4 |
three boats | 4 |
large pieces | 4 |
dumping buckets | 4 |
long length | 4 |
will reach | 4 |
shall forthwith | 4 |
known theory | 4 |
boats reached | 4 |
shearing tool | 4 |
general scheme | 4 |
house plant | 4 |
overlying material | 4 |
great eagerness | 4 |
steam used | 4 |
plate xli | 4 |
boats returned | 4 |
plate lxiii | 4 |
perfect contact | 4 |
iron filings | 4 |
underground railway | 4 |
general method | 4 |
escaping air | 4 |
pushed back | 4 |
three different | 4 |
north manhattan | 4 |
moisture determinations | 4 |
two inches | 4 |
one bolt | 4 |
early day | 4 |
lost total | 4 |
lease shall | 4 |
lord brougham | 4 |
high temperature | 4 |
river draw | 4 |
see tiemann | 4 |
next four | 4 |
stone used | 4 |
whole party | 4 |
sufficient depth | 4 |
wet mixture | 4 |
uniform thickness | 4 |
tightening bolts | 4 |
dry rot | 4 |
telegraph wires | 4 |
readily seen | 4 |
western shaft | 4 |
corona summit | 4 |
typographical errors | 4 |
two pieces | 4 |
soft soils | 4 |
supreme court | 4 |
sharp curves | 4 |
greatest strength | 4 |
work involved | 4 |
full volume | 4 |
square ture | 4 |
several places | 4 |
soon got | 4 |
west indies | 4 |
benjamin franklin | 4 |
nearly feet | 4 |
caulking groove | 4 |
brief description | 4 |
common shanties | 4 |
twelve days | 4 |
driven ahead | 4 |
weight weight | 4 |
two shifts | 4 |
six miles | 4 |
first suggested | 4 |
required timbering | 4 |
yale forest | 4 |
general account | 4 |
sliding extensions | 4 |
weighing platform | 4 |
legislature may | 4 |
western australia | 4 |
must take | 4 |
ring yard | 4 |
two engineers | 4 |
good material | 4 |
wood becomes | 4 |
rock bench | 4 |
previously stated | 4 |
north abutment | 4 |
also drilled | 4 |
new idea | 4 |
must also | 4 |
will serve | 4 |
still greater | 4 |
pieces shall | 4 |
connected therewith | 4 |
making boston | 4 |
far less | 4 |
bald cypress | 4 |
plate xxx | 4 |
one sense | 4 |
radial tangential | 4 |
never yet | 4 |
timber work | 4 |
will cut | 4 |
plate xliii | 4 |
henry cartwright | 4 |
corporation may | 4 |
future time | 4 |
days past | 4 |
pumping plant | 4 |
last named | 4 |
great distance | 4 |
will render | 4 |
mucking tion | 4 |
herein described | 4 |
annular space | 4 |
pretty nearly | 4 |
head will | 4 |
first trial | 4 |
pitch pockets | 4 |
base line | 4 |
fresh concrete | 4 |
earth soft | 4 |
day general | 4 |
tion lost | 4 |
circumferential reinforcement | 4 |
seven days | 4 |
western creek | 4 |
state bonds | 4 |
last stone | 4 |
much work | 4 |
go back | 4 |
pound hammer | 4 |
great credit | 4 |
holes drilled | 4 |
und festigkeit | 4 |
plate xiv | 4 |
two steel | 4 |
john reid | 4 |
top full | 4 |
will produce | 4 |
mountain barrier | 4 |
tension tests | 4 |
never finished | 4 |
average strength | 4 |
raw material | 4 |
including bolting | 4 |
work east | 4 |
final lines | 4 |
plate lxv | 4 |
two principal | 4 |
federal currency | 4 |
rated capacity | 4 |
least three | 4 |
small scale | 4 |
characteristic failures | 4 |
branch pipe | 4 |
radial joint | 4 |
two separate | 4 |
young watt | 4 |
driving shield | 4 |
green concrete | 4 |
pretty good | 4 |
left open | 4 |
probably find | 4 |
must either | 4 |
deserving poor | 4 |
will learn | 4 |
tangential direction | 4 |
past five | 4 |
depot buildings | 4 |
million seven | 4 |
general use | 4 |
testing machines | 4 |
hot weather | 4 |
assistant chief | 4 |
showing excavation | 4 |
bird says | 4 |
marc isambard | 4 |
almost immediately | 4 |
sized single | 4 |
will just | 4 |
good care | 4 |
clear beams | 4 |
brick arches | 4 |
preliminary headings | 4 |
red gum | 4 |
right side | 4 |
fixed hoods | 4 |
practical experience | 4 |
often heard | 4 |
riveted steel | 4 |
seven dollars | 4 |
best method | 4 |
comparatively little | 4 |
muck taken | 4 |
per tests | 4 |
rock elm | 4 |
good spirits | 4 |
day long | 4 |
spigot pipe | 4 |
power conduits | 4 |
proper time | 4 |
governor andrew | 4 |
drill steel | 4 |
compression test | 4 |
total volume | 4 |
principal keeper | 4 |
city engineer | 4 |
november st | 4 |
main beams | 4 |
anstruther easter | 4 |
grafton greenough | 4 |
plate lxvi | 4 |
tunnel passes | 4 |
live steam | 4 |
gy west | 4 |
light airs | 4 |
rock broke | 4 |
first work | 4 |
also provided | 4 |
plate lxvii | 4 |
many parts | 4 |
state trustees | 4 |
public mind | 4 |
may think | 4 |
eighth commandment | 4 |
fixed extensions | 4 |
vertical breast | 4 |
safety valve | 4 |
great works | 4 |
outside forms | 4 |
never known | 4 |
lower half | 4 |
first bulkhead | 4 |
masonry retaining | 4 |
past twelve | 4 |
square earth | 4 |
running order | 4 |
exhaust valves | 4 |
next step | 4 |
loading platform | 4 |
engineering works | 4 |
red oak | 4 |
dotted lines | 4 |
machinery west | 4 |
whole world | 4 |
striking body | 4 |
best possible | 4 |
pneumatic drills | 4 |
pocket iron | 4 |
actual practice | 4 |
general effect | 4 |
movable shield | 4 |
large air | 4 |
simple beams | 4 |
inch span | 4 |
half mile | 4 |
county commissioners | 4 |
earth excavated | 4 |
compression perpendicular | 4 |
tunnel cars | 4 |
per perch | 4 |
five rows | 4 |
new route | 4 |
careful reading | 4 |
sample log | 4 |
warnford lock | 4 |
sectional area | 4 |
great variation | 4 |
wide enough | 4 |
foregoing tables | 4 |
one night | 4 |
two rows | 4 |
rock ballast | 4 |
permanent work | 4 |
held tightly | 4 |
removing hood | 4 |
good business | 4 |
detailed records | 4 |
season checks | 4 |
concrete will | 4 |
see appendix | 4 |
piles screwed | 4 |
blessed dog | 4 |
ten hours | 4 |
great public | 4 |
remedy defects | 4 |
lewis thompson | 4 |
arthur payne | 4 |
power required | 4 |
must try | 4 |
boulton wrote | 4 |
working unit | 4 |
reader will | 4 |
several points | 4 |
captain jones | 4 |
excavated banks | 4 |
second part | 4 |
distance east | 4 |
two sons | 4 |
seventy thousand | 4 |
one person | 4 |
power plant | 4 |
two columns | 4 |
small quantity | 4 |
general methods | 4 |
four shields | 4 |
station construction | 4 |
thank god | 4 |
little experience | 4 |
cut work | 4 |
bearing plate | 4 |
baldwin loco | 4 |
strenuous life | 4 |
steel structure | 4 |
manhattan shield | 4 |
muck cars | 4 |
highly probable | 4 |
festigkeit der | 4 |
severe test | 4 |
long way | 4 |
weight required | 4 |
forest school | 4 |
work continued | 4 |
sheet piles | 4 |
concrete construction | 4 |
black locust | 4 |
much sea | 4 |
small beam | 4 |
preliminary work | 4 |
give access | 4 |
diagram showing | 4 |
dam across | 4 |
local conditions | 4 |
quite probable | 4 |
tied together | 4 |
convex surface | 4 |
nearly completed | 4 |
years hence | 4 |
iron segments | 4 |
maiden lane | 4 |
second place | 4 |
will scarce | 4 |
bound track | 4 |
plant running | 4 |
railroad line | 4 |
bearing ground | 4 |
iron pile | 4 |
varied greatly | 4 |
abbreviations used | 4 |
actual amount | 4 |
circumferential flanges | 4 |
pile may | 4 |
fund shall | 4 |
writer also | 4 |
will carry | 4 |
per yd | 4 |
going forward | 4 |
first sight | 4 |
full area | 4 |
watt became | 4 |
experiments noted | 4 |
main tracks | 4 |
pennsylvania system | 4 |
forward force | 4 |
larger one | 4 |
feet deep | 4 |
new engine | 4 |
per str | 4 |
northern grafton | 4 |
must lie | 4 |
four sides | 4 |
breaking strength | 4 |
will permit | 4 |
guy mannering | 4 |
may take | 4 |
shear parallel | 4 |
previously done | 4 |
will continue | 4 |
heroic line | 4 |
average quantity | 4 |
vertical position | 4 |
tested timbers | 4 |
moisture condition | 4 |
one portion | 4 |
little attention | 4 |
solid ground | 4 |
interior diameter | 4 |
general consideration | 4 |
greatly enlarged | 4 |
first used | 4 |
avenue plant | 4 |
center wall | 4 |
direct line | 4 |
line somewhere | 4 |
five dollars | 4 |
broken plate | 4 |
sawed material | 4 |
central plant | 4 |
upper side | 4 |
uniform speed | 4 |
test piece | 4 |
material excavated | 4 |
without timbering | 4 |
days later | 4 |
four others | 4 |
rate per | 4 |
john fiske | 4 |
spiral groove | 4 |
various proportions | 4 |
every share | 4 |
whole country | 4 |
upper portion | 4 |
shall bear | 4 |
will appear | 4 |
rotative motion | 4 |
apart vertically | 4 |
several hundred | 4 |
will doubtless | 4 |
western end | 4 |
dear brother | 4 |
may occur | 4 |
shaft sump | 4 |
high vertical | 4 |
force per | 4 |
able report | 4 |
cut away | 4 |
political corruption | 4 |
track railroad | 4 |
looking east | 4 |
must make | 4 |
tangential surface | 4 |
items hrs | 4 |
second time | 4 |
seventh avenues | 4 |
great state | 4 |
yards cubic | 4 |
growth layers | 4 |
fifteen years | 4 |
red lead | 4 |
looking north | 4 |
ten miles | 4 |
exceeding five | 4 |
different classes | 4 |
iron screw | 4 |
arch timbers | 4 |
fifty miles | 4 |
outside circumference | 4 |
exposed sand | 4 |
service reservoirs | 4 |
tangential shrinkage | 4 |
certain points | 4 |
fourteen years | 4 |
steam shall | 4 |
temperature will | 4 |
pacific railroad | 4 |
given point | 4 |
foot per | 4 |
tunnel center | 4 |
station lin | 4 |
per bent | 4 |
unconditional subscriptions | 4 |
broaching line | 4 |
cameron pumps | 4 |
long years | 4 |
shall come | 4 |
pile met | 4 |
fresh breezes | 4 |
second delivery | 4 |
les bois | 4 |
division engineer | 4 |
might say | 4 |
large rock | 4 |
soon made | 4 |
executive council | 4 |
boundary line | 4 |
boats landed | 4 |