^ ^^.^^ IMAGE EVALUATION TEST TARGET (MT-3) 7 A V*^ ,.% #,?< L^^^ .^< 1.0 I.I 1.25 iia 12.5 w ilM i||||2.2 2.0 III™ \A. IIIII5 6 v^ s^\V\S^^\ and when the Northerly Slope is done, by red lines in the opposite direction, thus : /////////,' It is of some importance to carry out a uniformity of sys- tem throughout the whole line, in preparing the Plans and Profiles, as well as in everything else. It appears to me, therefore, that the Earthwork executed during each month, might be shown by the same colours on every Contract Pro- file ; with that view the following colours are selected ; they form good contrasts, and I shall be glad to see them employed throughout your District. Blue for work done in January and July. Yellow do February and August. Red do March and September. Green do A})ril and (3ctobcr, Purple do May and Novemhei-. Orange do June and December. 1 1 5 The Drawings and Profiles dow asked for, are intended to be a complete exhibit of all the work done in each month up to the end of the year. In addition to the above, I have to request that you will furnish as soon as possible, detail Schedules (from Cross Sec- tions) of Excavations and Embankments on each Contract within the limits of your District. ' These Schedules should be in the form of those printed for the last Tenders called for, and should be as much in detail as may seem necessary. At the same time yoa will be good enough to prepare and forward Schedules (according to the printed foi-ms) of all structures deemed necessary, but before the final adoption of the latter, I shall probably require some further consultation with you. The above refers to all Contracts as far as applicable. I need scarcely add that all the documents askod for should be signed by yourself in attestation of their accuracy. They are intended as Records for this Oftice. ',. (Signed,) SANDFORD FLEMING, Chief Engineer. f t \