key: cord-0980295-llpnru1n authors: Wu, Di; Gong, Min; Peng, Rui; Yan, Xiangbin; Wu, Shaomin title: Optimal Product Substitution and Dual Sourcing Strategy considering Reliability of Production Lines date: 2020-05-23 journal: Reliability engineering & system safety DOI: 10.1016/j.ress.2020.107037 sha: df54c8715f5723b360b503dc967006e77d999829 doc_id: 980295 cord_uid: llpnru1n Abstract Most of the supply chain literature assumes that product substitution is an effective method to mitigate supply chain disruptions and that all production lines either survive or are disrupted together. Such assumptions, however, may not hold in the real world: (1) when there is a shortfall of all products, product substitution may be inadequate unless it is paired with other strategies such as dual sourcing; and (2) production lines do not survive forever and may fail. To relax such assumptions, this paper therefore investigates the situations that the manufacturer may optimize substitution policy and dual sourcing policy to cope with supply chain disruptions. The paper obtains and compares the optimal policies for both deterministic and stochastic demands. A real-world case is also studied to verify the effectiveness of the proposed model. 1 Introduction Supply chain disruptions caused by unforeseen incidents such as natural disasters, labor strikes, terrorism attack, and financial defaults may occur with a high probability and can result in enormous ramifications for a firm [1, 2] . For the example in March 2011, Toyota's production lines were shut down for two weeks when their sole supplier suffered from an earthquake, which caused a supply chain disruption. To cope with supply chain disruption, authors regard flexible supply chains as an effective strategy [3, 4] and have developed methods such as multiple sourcing, product substitution, and flexible product volume to enhance supply chain resilience [5, 6] . For example, during the harsh winter in China's northern provinces in 2010, to combat the disorder in the transportation and production of goods, the Chinese government substituted their imported coal supply for the supply of southern power plants. In addition, the northern grocery market substituted products from southern farms for the supply that was previously provided by the local farms. In this case, product substitution proved valuable [7] . Similarly, the electricity meter subdivision of major oilfield services companies is another good example, where the effective management of changeover and substitution costs enabled those companies to supply radio-frequency-enabled meters in place of the cheaper traditional meters, which leaded to a great decrease in cost and an increase in profit [8] . The most recent example is the Covid-19 pandemic, due to which many countries shut down their nonessential businesses. For example, we witnessed that many supermarkets provided a large quantity of whole milk but did not provided semi-skimmed milk in the UK. All the existing work on dual sourcing and product substitution is restricted to the assumption that all the production lines of the supplier either survive together or are disrupted together. In practice, some events may disrupt part of a supplier's production lines whereas other production lines are still functioning. For instance, [9] discussed the mixed oxide fuel exploitation and its destruction in power reactors. Among all six reactors, four of them are totally disrupted and the rest still remain functioning. In light of this, this paper considers a supply chain with two separate production lines that are subject to random failures, where the manufacturer decides on the optimal sourcing and substitution strategy. In the literature, [10] considered the agility and proximity in a supply chain design. [11] solved a similar problem with consideration of distributional uncertainty. Both [3] and [12] assumed that all the production lines of a supplier either survive together or are disrupted together. However, in practice, two separate production lines may produce different goods at the same time, and the supplier may only be partially disrupted. 4 In this paper, we propose a model where two separate production lines are subject to disruption with different probabilities. Through mathematical derivations and numerical simulation, we obtain some useful results about the joint strategy of product substitution and dual sourcing. Specifically, a supply chain involving a manufacturer and two suppliers (one reliable and one unreliable) is analyzed. The unreliable supplier in this case might only be partially disrupted. The optimal sourcing strategy and the corresponding substitution strategy are solved under different settings of cost and disruption parameters. The solution is obtained under both deterministic and stochastic demands, respectively, and the effects of the interactions between dual-sourcing and substitution are discussed. Besides, a real-world example is proposed to illustrate the application of the proposed model. It should be noted that the methods used in our paper are different from [13, 14] although they considered the mix-flexibility and analyzed the optimal substitution and dual sourcing strategies under uncertainty. [13] considered the game between investment and dual-sourcing whereas this paper analyzes the sourcing-substitution decision from a manufacturer's perspective. [14] utilized a decision tree approach to determine the optimal number of suppliers whereas this paper analytically formulates the optimal sourcing and substitution problem and studies the solution. This paper makes the following contributions.  Supply chain authors may benefit from this paper as a theoretical method is employed to obtain the optimal policy under deterministic demand and numerical examples and a real-world case are solved under stochastic demand. The paper also summarizes the interaction between substitution strategy and dual sourcing strategy and illustrates their impacts on optimal managerial decision.  Practitioners such as supply chain managers may benefit from the paper as it provides a guidance in their decision making on sourcing and substitution strategy for the more realistic case where production lines can be partially disrupted.  This paper considers the reliability of a production line in supply chain management and has an intension to describe the real-world problem with a more practical manner. The remainder of this paper is organized as follows. Section 2 reviews previous literature and highlight differences. Section 3 provides the problem description and formulates the supply chain model with deterministic demand and stochastic demand, respectively. Section 4 solves the optimal policy under both cases and provides numerical examples. Section 5 applies the proposed model to a real case study. Section 6 concludes the paper and discusses further research avenues. Literature relevant to this paper includes: unreliable supply chains, product substitution between higher-grade products and lower-grade products, and multiple sourcing in supply chain management. A supply chain is a network between a manufacturer and its suppliers to produce and distribute a specific product to the end consumer. Unreliable supply chains may confront with internal and external impact. Specifically, some components may be disrupted and the performance of supply chain will degrade. Many papers have been published to investigate various challenges caused by unreliable supply chains [3, [15] [16] [17] . [18] evaluated the impact of supply disruption risks on the choice between the single and dual sourcing methods in a two-stage supply chain with a non-stationary and price-sensitive demand. They found that the dual sourcing strategy can be employed to increase supply chain efficiency. [19] analyzed the interaction between demand substitution and product changeovers, performing another commonly employed strategy in flexible supply chains. [20] considered the case where a supplier facing the prospect of disruption must decide whether or not to invest in restoration capability. Their discussion of disruption leads to the analysis of an unreliable supply chain. [21] considered risk pooling, risk diversification and supply chain disruption in a multi-location system where the supply is subject to disruptions. Their results show that when the demand is deterministic, the use of a decentralized inventory design can reduce cost variance through the effect of risk diversification. Recently, [22] analyzes the maintenance policy of competing failures under random environment. This paper differs from existing research since it considers both deterministic and stochastic demands, which provides a better depiction of the reality. Product substitution refers to using other product to substitute an existing product to meet the same needs, which is widely studied under a retail background [5, 23] . [24] adopted a stylized two-segment setup with uncertain market sizes under endogenous substitution and illustrated the interplay between risk-pooling and market segmentation. [25] studied a real case in the substitution of cars. Specifically, they considered the demand for two-car households and showed that the car efficiency and substitution are strongly correlated. [26] considered inventory decisions for a finite horizon problem with product substitution options and time varying demand. We conduct a similar research topic as theirs but differ in the partial production line destruction. [27] considered the process flexibility design in heterogeneous and unbalanced networks and employed a stochastic programming approach to solve the optimal substitution strategy. [28] employed substitution strategies in a time allocation model that considers external providers. [29] considered two inventory-based substitutable products in an inventory replenishment system. In this paper, we analogically consider product substitution and introduce the flexible production into concern. The reliable supplier can enlarge its 6 production quantity in case some production lines of unreliable suppliers are disrupted. A multiple sourcing in a supply chain is outsourcing several of manufacturer's most important operations to several different vendors instead of using a single source [30] . Multiple sourcing, when used in conjunction with product substitution, is another efficient method to mitigate supply disruptions. [31] first proposed a dual sourcing model with random lead time and uncertain demand. [14] connected the mix-flexibility and dual-sourcing literatures by studying unreliable supply chains that produce multiple products. The model was extended by [32] , which further considered capacity constraint and flexibility in order quantities. [13] compared the effectiveness of dual sourcing, contingent sourcing and product substitution, and the model proposed by [13] was further extended by [4] , which used product substitution as the primary disruption mitigation method while regarding dual sourcing and contingent supply as supporting mechanisms. It is found that the optimal dual sourcing policy is to guarantee the effect of product substitution. [33] examined a double-layered supply chain where a buyer facing the end-users has the option of selecting from a cohort of suppliers that have different yield rates and unit costs in the related field. [34] considered the pricing strategy and coordination in a supply chain with risk-averse retailer taking dual sourcing policy. Nonetheless, little research analyzes the case where only part of the unreliable supplier's production lines is disrupted. This paper therefore bridges the gap by considering this realistic case. Furthermore, many papers studied the reliability of the production lines and the related optimization problems. For example, [35] and [36] analyzed the optimal maintenance policy for a given product line. Our paper can be also regarded as an optimization problem related to unreliable productions lines and its aim is to make the optimal sourcing and substitution decisions to deal with the possible unsupplied demand caused by disruption of production lines. In order to increase the reliability of a system, methods like redundancy and performance sharing are widely employed [37, 38] . [39] studied the optimal replacement policy in terms of the substitution cost. In our paper, the dual sourcing strategy can be regarded as a type of redundancy and the substitution strategy can be taken as a type of performance sharing. On the other hand, research has been done in the analysis of supply chain management from the perspective of reliability. For instance, [40] performed the mathematical definition and the theoretical structure in analyzing the supply chain based on the reliability theory. Specifically, they discussed the structural reliability model and introduced a case study of a supply chain for the personal computer assembly. [41] considered a supply chain where the service provider has limited resources and proposed an emergency supply contract based method to maximize the expected profit. [42] considered both reliability and disruption and analyzed the optimal 7 network design problem for perishable products. Recently, [43] proposed a resilience measure to characterize the interruption in cyber-physical supply chain systems. Following prior literature [24, 28] , we assume that product substitution is the primary disruption mitigation technique, and dual sourcing and contingent supply are the supporting mechanisms and that there is a supply chain model in which two products are downward substitutable (i.e. only higher-grade products can be substituted for lower-grade ones) and are sourced from two suppliers. , , The subscript " U " denotes an unreliable supplier and " R " denotes a reliable supplier. In reality, it is easy to deduce that supplier R has more flexibility in contingent volume than supplier U . That is, if the demand of any product cannot be satisfied due to the disruption of supplier U , the manufacturer can increase its order from supplier R . Since only 2 P can substitute for 1 P , it is easy to know that the manufacturer may increase the order of R . Without loss of generality, we assume that the flexibility function is linear, that is, ()   is the flexibility coefficient and it represents the supplier's ability to supply product units even if disruption occurs. We also assume that both products own the same level of flexibility, say that, 12     , without loss of generality. The game proceeds as follows. At the beginning, the manufacturer makes sourcing decisions. Then two production lines of unreliable suppliers break down independently with different probabilities. Each supplier fulfills the sourcing order. The manufacturer makes a substitution decision based on the sourcing situation. First, the manufacturer determines the quantity of order based on the demand. Assume we need i q units of i P ( = 1,2). According to the sourcing policy, the manufacturer splits the order between the two suppliers, where the proportion of supply status is observed, where supplier U has two production lines that may break down independently from each other with different probabilities. Third, the manufacturer receives the ordered volume from the suppliers. Fourth, the manufacturer allocates the available products to customers by making the substitution decision. The production line for 1 P may break down with probability 1  , while the production line for 2 P may break down with probability 2  . Generally, the greedy allocation algorithm is still optimal: first, we should satisfy the demand for 2 P as much as possible; second, we should satisfy the demand for 1 P with the available volume of 1 P as much as possible; third, we should consider substituting the remaining demand of 1 P with 2 P . Note that the holding of the greedy allocation needs to be supported by the conditions that cb  guarantees that obtaining a 1 P from R is cheaper than bearing the penalty for 1 P ,  22 R cb  guarantees that obtaining a 2 P from R is cheaper than bearing the penalty for 2 P ,  11 Rs c c b  guarantees that obtaining a 2 P from R and substituting for 1 P is better than 10 bearing the penalty for 1 P but worse than satisfying the demand for 1 P by obtaining a 1 P from R , and 2 P should first satisfy its own demand before Without loss of generality, we assume that the higher-grade product has a higher penalty than the lower-grade product. To illustrate the model, we give a numerical example, as shown in Table 1 (1 ) U c r q  is the cost of sourcing 2 P from unreliable supplier. 11 2. Partial working state: production line for 1 The demand for 2 P can be satisfied. Therefore, we first try to satisfy the demand for 1 P as much as possible with the available volume of 1 P . We then use 2 P to satisfy any unmet demand for 1 P , as detailed in Table 2 . To summarize, the number of 2 P used to substitute 1 P is x . Thus, the total cost under disruption on production line 1 P is 3. Partial working state: 2 P production line breaks down 12 The demand for 1 P can be satisfied, so substitution is not necessary. We try to satisfy the demand for 2 P as much as possible. The cost will contain both the sourcing cost and the penalty costs incurred for any unmet demand for 2 P : To summarize, the number of 2 P used to substitute for 1 P is Thus, the total cost under disruption on production line 1 P is If the demand is deterministic, it is optimal to choose 11 qd  and 22 qd  since the manufacturer makes the sourcing decision before the failure state of the production lines is observed. Therefore, since the manufacturer is rational and does not predict the future, the optimal order quantity is equal to the demand. Thus, the sourcing problem is to minimize the cost 12 ( , ) C r r such that 12 0 , 1 rr  . Another problem under consideration is stochastic demand. Under this case, the demand 12 ( , ) dd is random and has a cumulative distribution function . Suppose the manufacturer's order quantity for each product equals to the product's expected demand. This assumption holds since the status of suppliers cannot be observed before a decision is made. Indeed, [44] assumed that the optimal ordering quantity do not equal to the product's expected demand in a newsvendor-type setting. Nonetheless, they studied an investment and production game where the investment decisions are made in advance. In reality, the fluctuation of demand is assumed to be low, say that, the probability that the realized demand is larger than the expected demand multiplied by the flexible coefficient can be neglected. Again, for a given demand realization 12 ( , )  , we have four cases: The expected cost is therefore given by 2 "sourcing", "substitution", and "penalty" in Eq. (9) represent the different parts of total cost. 3. Partial working state: production line for 2 The demand for 1 P can be satisfied, so substitution is not necessary. We try to satisfy the demand for 2 P as much as possible. The cost will include both the sourcing cost and the penalty costs incurred for any unmet demand for 2 P : (1 ) Min( , ) (Max(0, )). Therefore, the expected cost is 3 Therefore, the expected cost is 4 12 ( , ) C r r can be expressed by Eq. (7) . Like the deterministic demand problem, the optimal sourcing policy can be obtained by minimizing the expected cost. In this section, we solve the optimal sourcing policy ** 12 ( , ) rr and corresponding substitution policy ** 12 ( , ) ss qq for deterministic demand and stochastic demand, respectively. When dealing with the deterministic demand, we employ theoretical analysis and minimize the cost of the manufacturer. The solution of optimization leads to the optimal strategy combination. When dealing with stochastic demand, we employ numerical analysis and assign specific numbers to the parameters in our proposed model. We run the simulation and obtain the numerical solution by similarly minimizing the cost of the manufacturer [46] . Deterministic demand 15 For deterministic demand, the total cost is denoted in Eq. (7) . Note that 12 ( , ) C r r contains several functions. To obtain the optimal 12 ( , ) C r r , different ranges of 1 r and 2 r should be explored. We consider eighteen cases and only perform the specific derivation and optimality proof for the first case (a) here. See Appendix C for the other seventeen cases (b-r). (a) 2 Since the expected total cost is a linear function of 1 2 1 ,, r r q and 2 q , the problem can be translated into linear programming. To find the optimal sourcing policy and related substitution policy, we take   as an entirety and use the first-order condition to solve this issue. Let Thus, the optimal sourcing policy can be represented by Similarly, the optimal substitution strategy can be denoted by In this case, if the respective demands of the higher-grade and lower-grade products are greater than the flexible quantity (contingently increasable ordering) from the reliable supplier, the optimal sourcing strategy is a function of the disruption probabilities of both production lines, the flexible coefficient, the sourcing cost, and the substitution cost. As for the substitution policy, the best strategy is to substitute some lower-grade products rather than to substitute higher-grade products. This is 16 because the manufacturer would rather retain higher-grade products than substitute them if the demands are greater than the flexible quantity. We conduct sensitivity analysis in Section 3.2 to test the robustness of the proposed model. Now we prove the optimality of the given sourcing policy and the corresponding substitution policy. Since the total cost is a linear function, the policy is optimal within the boundaries. We illustrate this by comparing the expected total cost between our obtained policy and the boundary. In this case, the boundaries of the sourcing policy are The other seventeen cases are the same as (a). We will therefore go directly to Proposition 1 (the remaining seventeen derivations are shown in Appendix C, for your reference). Our derivations show there are five different patterns. The substitution of higher-grade products is equal to zero while the sourcing amounts of lower-grade products slightly changes. From their preconditions, the demands for both products are higher than the flexible quantities. 2. (e)-(g): When the demand for the lower-grade product is higher than the flexible quantity but the demand for the higher-grade product is lower than the flexible quantity and with some other limitations, the optimal substitution strategy follows the same pattern. This leads us to Proposition 1. A. Cases (a)-(d) conform to Pattern 1. If the demand for both products are higher than their flexible quantity, the optimal substitution strategy is that any higher-grade product is unsubstituted. B. Cases (e)-(g) conform to Pattern 2. If the demand for the higher-grade product is higher than its flexible quantity, the demand for the lower-grade product is not higher than its flexible quantity, and the latter one is larger, the optimal substitution strategy has a similar pattern to C. Cases (h)-(k) conform to Pattern 3. If the demand for the higher-grade product is higher than its flexible quantity, the demand for the lower-grade product is not higher than its flexible quantity, and the former one is larger, the optimal substitution strategy has a similar pattern as The higher-grade product is now employed to compensate for the deficiency of the lower-grade product in case the penalty is incurred. Pattern E is a worse version of Pattern D where the normal production line will also be severely influenced by the destruction of unreliable production line. The optimal substitution strategy shares a similar pattern if the precondition that the demand for the higher-grade product is lower than the flexible quantity of the higher-grade product is met. In general, there are five different expressions of * 1 s q and * 2 s q , depending on the diverse value of demand and the flexible quantity of both products, as shown in Table 3 . As assumed in the traditional inventory control field, the demand in the market follows the Poisson distribution, where 11 ( ) dP  and 22 ( ) dP  , respectively [6, 20, 44] . The Poisson probability function is given by Therefore, we can calculate the probability of different combinations of the realized demand 12 ( , )  and then calculate the expected total cost. Nonetheless, the optimal sourcing and substitution strategy is hard to obtain in this case. Without loss of generality, we assume that 1~( 2) dP and 2~ ( 1) Note that the realized demand follows the Poisson distribution and the probability that each line in 2 d is disrupted is given. We calculate the cost when each realized demand occurs, and the summation of these costs gives us the expected total cost. By minimizing the expected total cost, the optimal sourcing and substitution strategy can be obtained. The expected total cost can be obtained by 12 1 1 2 2 The goal is to find the minimal expected cost through the optimal sourcing strategy. Therefore, the program is To better illustrate the optimal strategy under each case, we vary the disruption probability of each production line from 0 to 1 by increments of 0.2. The results are performed in Table 4 . Table 4 . The optimal sourcing strategy and corresponding total cost under benchmark. If the sourcing strategy * 0 i r  , then sourcing from the cheaper supplier is optimal. If * 1 i r  , then sourcing from the expensive and reliable supplier is optimal. From Table 5 , we see that if the disruption probabilities of both production lines are equal to zero, the best sourcing strategy is to source all goods from the cheaper supplier. In contrast, if the disruption probability of both production lines is equal to one, the best sourcing strategy is to source all lower-grade product from the expensive and reliable supplier and source over 70% of the higher-grade product from the expensive and reliable supplier. Because the cost of sourcing from the reliable supplier and of substitution is so high that it is preferable to lose part of the sales, products should not be sourced from the reliable supplier when the 21 disruption probability reaches one (i.e. when the production line is certainly disrupted). We should also point out that the cost under this case is still the highest among all possible cases. If the disruption probability of the lower-grade production line is less than one, then the optimal sourcing strategy for higher-grade products remains the same. This is reasonable as only the higher-grade product can substitute for the lower-grade product, so sourcing the higher-grade product from the reliable supplier will always be guaranteed by the manufacturer at first. Moreover, the percentage of higher-grade product from the reliable supplier diminishes when the disruption probability of both production lines changes from 2 = 0.8 to 2 = 1 while keeping 1 fixed. This is counterintuitive as it seems normal to source more higher-grade product from the reliable supplier than from the unreliable supplier since the disruption of the higher-grade production line is unavoidable. The manufacturer should first satisfy the demand for each product before considering the substitution since the lower-grade production line will be disrupted. We first compare the results obtained from the proposed model under deterministic and stochastic demand. Since the expectation of the Poisson distribution is equal to the variance and the arrival rate, there is no difference between the two cases when the deterministic demand is equal to the arrival rate. In other types of demand distributions, the difference between the two cases depends on the degree of risk aversion of the manufacturer. When the expectation of demand remains the same and the variance is higher (i.e. the demand is more unpredictable), the manufacturer with a high-risk aversion might source more from the reliable supplier to mitigate the destruction of the production lines. The corresponding substitution fraction will decrease and then remain at a very low degree. In contrast, when the manufacturer is risk-seeking, they might source more goods from the cheaper but unreliable supplier. This increases the possible amount of substitution. In this paper, we assume that all parties in the supply chain are risk-neutral; variations on this can be explored in future research. Moreover, we find that the substitution strategy is more effective for the reliable supplier than for the unreliable supplier. If the probability of destruction increases, the sourcing strategy from the reliable supplier increases, leading to the necessity of the flexible area, i.e. substitution. In contrast, the unreliable supplier suffers from the disruption and own less flexibility in substitution than the reliable supplier. Interestingly, from the results obtained in Section 3.2, we find that the substitution effect is at its peak when the probability of destruction is at a middle level. Under this circumstance, the sourcing strategies for the reliable supplier and the unreliable supplier are similar. Additionally, the integrated profit of the supply chain is maximized because of the substitution effect (where both suppliers maximize their flexibility), forming a Pareto area. When the probability of destruction is at a low or high level, the substitution effect is maximized, that is, the manufacturer should adjust their sourcing strategy instead of relying on substitution. This is counter-intuitive since existing literature usually concludes that substitution should be employed as much as possible when production lines may be disrupted. Nonetheless, by relaxing the assumption that both production lines can suffer from disruption, we prove that this conclusion is incorrect. Rather, substitution should be significant when anticipating that the destruction probability is of a middle level. By using the results from Figure 2 , a We now illustrate the practical application of our model by using real case data collected from a steel product factory in China to analyze the optimal sourcing and substitution strategy. Managerial insights are proposed to help the factory make better decisions when their production line may be disrupted. First, we test the assumption that the arrival of demand follows a Poisson process. We use the Asymptotic significances are displayed. The significance level is 0.05. Similarly, we use another product that can substitute for the steel product (higher-grade product) and analyze the data from the same period to obtain the arrival rate. Nonetheless, the higher-grade steel product in this case is a product of constant demand. There is a downstream factory ordering 6 specific goods per 10 days. The demand that the factory is confronted with is a random demand following a Poisson distribution with 1 0.529   and a deterministic demand 2 0.6 d  . The objective function can now be rewritten as Using our investigation of the steel product factory and the average price of a single mold, we 24 estimate the cost parameters for the practical example. The substitution cost between the different product grades is around s c  $195. The sourcing cost of the higher-grade product from the reliable supplier is 1 R c  $19.5/ton while the sourcing cost of the lower-grade product is around 2 R c  $12.5/ton. Additionally, the sourcing cost of the higher-grade product from the unreliable supplier is 1 U c  $9.5/ton while the sourcing cost of the lower-grade product is around 2 U c  $6.5/ton. The penalty cost is 30% of the initial price, which means for the higher-grade product it is 1 b  $148 and for the lower-grade product it is 2 b  $206. The flexible coefficient is still 2. After several interviews and surveys, we found that the disruption probabilities of the lower-and higher-grade products are 80% and 40%, respectively. Using our model to calculate the optimal sourcing strategy and the corresponding total cost, we find that . The optimal data we obtained is very close to the factory's actual practice, where they source none of the lower-grade steel product from the reliable supplier and they source around two-thirds of their higher-grade steel product from the reliable supplier. The corresponding cost minus the fundamental sourcing cost is 10%, which is also close to the cost we obtained. This verifies the usefulness and effectiveness of our Figure 2 shows that the optimal sourcing strategy for the lower-grade product remains at 1 if the 25 disruption probability of the lower-grade product is less than 0.7, except the case when the disruption probability of the higher-grade product is 0 as well. If the destruction probability of the lower-grade product is high enough, the manufacturer prefers to leave the demand unfulfilled rather than source them from the reliable supplier. Figure 3 .Higher-grade product sourcing proportion from reliable supplier with varying disruption probabilities for both products. Figure 3 shows that the optimal sourcing strategy for the higher-grade product remains at 1 when the disruption probability of the lower-grade product is less than 0.7, except when the disruption probability of the higher-grade product is 0 as well. When the destruction probability of the lower-grade product is high enough, the manufacturer prefers to source two-thirds of the higher-level product from the reliable supplier. This becomes a dominating strategy. 26 Figure 4 shows that, after the given strategies shown in Figure 3 and Figure 4 , the expected cost shows the following trend: before the disruption probability of the lower-grade product reaches 0.7, the expected total cost increases at a normal rate. However, when this destruction probability becomes high enough, the expected cost rises rapidly because of the alteration of the optimal strategies. All results obtained here agree with our major conclusion in the model foundation, illustrating the effectiveness of our proposed model. We now conduct some sensitivity analysis to discuss what managers should alter in their strategy under different contexts. The probability density function, cost of sourcing, cost of penalty and cost of substitution may vary. For simplification, we only consider the alteration of product 1. In fact, the increase in sourcing cost of product 1 can be regarded as the relative decrease in sourcing cost of product 2. We directly illustrate the results in Figure 5 . the manufacturer should source more products from the reliable suppliers, no matter for high-grade or low-grade products. One explanation for this could be that the best strategy when the parameter is increasing is to keep the product sourced in a steady state rather than taking the risk of penalty. When the substitution cost between two types of product is increasing, the manufacturer would source more low-grade products from a reliable supplier since the substitution is more costly under this case. When the sourcing cost of low-grade products from a reliable supplier is increasing, it is reasonable that the sourcing for low-grade from a reliable supplier is decreasing and the sourcing for high-grade products is increasing since the substitution cost becomes relatively cheaper now. In contrast, when the sourcing cost of low-grade product from unreliable supplier is increasing, the ordering of low-grade products 27 from a reliable supplier becomes relatively cheaper and thus the manufacturer now orders more low-grade products from a reliable supplier and fewer high-grade products. Now we go to the case where there is an augment in substitution cost. Under this case, the manufacturer chooses to order more low-grade product to satisfy the demand instead of relying on substitution. Finally, the increase in flexible capacity of a reliable supplier has no impact on the sourcing strategy of the manufacturer since the initial sourcing amounts from a reliable supplier is less than the maximal value of the flexible capacity. Contrary from that, when the flexible capacity is going down, then the manufacturer has to source more low-grade products in order to satisfy the demand. Thus, we conclude our managerial insights through theoretical analysis and numerical examples as follows: For a manufacturer, it can decide the optimal substitution and sourcing policy under different scenarios to maximize its profit. Actually, there are five patterns that the manufacturer can find themselves in and take the corresponding strategy combination. The employment of dual sourcing and substitution strategies forms a flexible area, where two types of strategies can compensate with each other. For a supplier, anticipating the sourcing policy of the manufacturer, the supplier can alter its flexible capacity to better coordinate with downstream, leading to a win-win situation. This paper considered a supply chain that utilizes product substitution and dual sourcing. Suppose that products can be ordered from a supplier that may or may not be reliable. A reliable supplier may be able to offer more choices at any time than an unreliable one. Assume that there are two separate production lines, which are subject to random disruptions with different probabilities of occurrence. The manufacturer chooses the optimal substitution policy and the dual sourcing policy to minimize the total cost. Through backward induction, we found that under deterministic demand there are five possible substitution functions, given that different relationships between demand and flexible quantity are held. We analyzed the case of stochastic demand through numerical study, and the different strategies from the manufacturer's perspective were established through sensitivity analysis. The interaction between the substitution and dual-sourcing strategy was performed under a more realistic case. We also employed real world data to gain a better understanding of the practical applicability of our model. Our future research will aim to improve the proposed model from a variety of aspects. First, in our proposed model, we did not consider the backorder cost, which incurs commonly in supply chain models. Further research could assume that some consumers will backorder the product. It might also be of interest to investigate what types of product can be backordered easily, i.e. higher-grade products 28 or lower-grade products. Second, in our proposed model, we assumed that the products are not perishable. In the real world, some products might perish during transportation, which should be considered by the manufacturer indecision making. Third, in our proposed model, we considered only two products, where one product can substitute for the other. In practice, a supplier might have a great number of different product combinations. This would increase the number of product categories, which is worth investigating in the future. Fourth, the game under asymmetric information and competitive market are also an interesting direction that deserves further analyzing [45] . Finally, in our proposed model, we only considered a one-period game between the manufacturer and the suppliers. The analysis of multi-period game, i.e., newsvendor, is definitely needed. The optimal ordering will thus be influenced by the information disturbance in different stages, making the product's expected demand unequal to the optimal ordering. Besides, our work analyses a supply chain problem through reliability modelling and optimization. Our future work aims to solve other types of management challenges by taking into account practical reliability issues, i.e., redundancy. We believe that the consideration of reliability can lead to more interesting and convincing managerial implications in practice. The authors declare that they have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper. All persons who meet authorship criteria are listed as authors, and all authors certify that they have participated sufficiently in the work to take public responsibility for the content, including participation in the concept, design, analysis, writing, or revision of the manuscript. Furthermore, each author certifies that this material or similar material has not been and will not be submitted to or published in any other publication before its appearance in the Reliability Engineering & System Safety. For specific contribution: Capacity and inventory management in the presence of a long-term channel and a spot market Vulnerable options in supply chains: effects of supplier competition Product substitution and dual sourcing under random supply failures The Resilient Enterprise: Overcoming Vulnerability for Competitive Advantage A profit-maximizing supply chain network design model with demand choice flexibility The power of flexibility for mitigating supply chain risks A Dual-Sourcing Inventory Problem with Disruption and Preference between the Products Schlumberger optimizes receiver location for automated meter reading Mixed Oxide Fuel (Mox) Exploitation and Destruction in Power Reactors Agility and proximity considerations in supply chain design Robust shortest path problem with distributional uncertainty Disruption-management strategies for short life-cycle products On the value of mix flexibility and dual sourcing in unreliable newsvendor networks The optimal number of suppliers considering the costs of individual 30 supplier failures Advances in stochastic programming and robust optimization for supply chain planning Comparative analysis of standby systems with unreliable server and switching failure A value-based preventive maintenance policy for multi-component system with continuously degrading components Single or dual sourcing: decision-making in the presence of supply chain disruption risks On the interaction between demand substitution and production changeovers Managing risk of supply disruptions: incentives for capacity restoration An assessment of supply chain disruption mitigation strategies Hybrid preventive maintenance of competing failures under random environment Consumer Inter-Product Showrooming and Information Service Provision in an Omni-Channel Supply Chain. Decision Sciences Centralization versus decentralization: risk pooling, risk diversification, and supply chain disruptions Substitution between cars within the household Inventory decisions for a finite horizon problem with product substitution options and time varying demand Process flexibility design in heterogeneous and unbalanced networks: a stochastic programming approach A time allocation model considering external providers An inventory replenishment system with two inventory-based substitutable products Diversification under supply uncertainty Just-in-time purchasing: single or multiple sourcing On the value of mitigation and contingency strategies for managing supply chain disruption risks Sourcing with random yields and stochastic demand: a newsvendor approach Pricing strategy and coordination in a dual channel supply chain with a risk-averse retailer A condition-based maintenance policy for degrading systems with age-and state-dependent operating cost Group maintenance scheduling for two-component systems with failure interaction Balancing mission success probability and risk of system loss by allocating redundancy in systems operating with a rescue option Optimal design of a linear sliding window system with consideration of performance sharing Cost analysis for multi-component system with failure interaction under renewing free-replacement warranty A mathematical definition and basic structures for supply chain reliability: A procurement capability perspective Emergency supply contracts for a service provider with limited local resources A perishable product supply chain network design problem with reliability and disruption considerations A resilience measure for supply chain systems considering the interruption with the cyber-physical systems Normal approximation on Poisson spaces: Mehler's formula, second order Poincaré inequalities and stabilization. Probability Theory and Related Fields Multi-methodological research in operations management Defender-Attacker Games with Asymmetric Player Utilities Table 3 , we can easily obtain the optimal substitution strategy under deterministic demand.Note that the optimal strategy under both 2 2 2 r q d   and 1 1 1 r q d   is similar to the case when Table 3 to find out the corresponding optimal sourcing and substitution decision. Since it is difficult to obtain analytic solutions under the stochastic demand, we now illustrate the ( , )  . The backward induction is one of the most commonly used methods to solve such a problem, see [18, 20, 21] , for example. Therefore, we first give the essential parameters that are necessary to obtain the optimal solution based on a real-world case, used in [24] . We then find the optimal substitution strategy when the two production lines may fail with different probabilities. After taking this substitution into account, the optimal sourcing strategy is obtained. Finally, sensitivity analysis is conducted to test the robustness of our model. 1