key: cord-0968493-p0cyo6s2 authors: Xu, Jinying; Ye, Meng; Lu, Weisheng; Bao, Zhikang; Webster, Chris title: A four-quadrant conceptual framework for analyzing extended producer responsibility in offshore prefabrication construction date: 2020-10-07 journal: J Clean Prod DOI: 10.1016/j.jclepro.2020.124540 sha: 0ec4427bb1cc85077ff4c06d12a9fb0232cd5651 doc_id: 968493 cord_uid: p0cyo6s2 Prefabrication has been widely advocated as a green production strategy to minimize the adverse environmental impacts of construction. Amid economic globalization, prefabricated construction materials are commonly sourced offsite and even offshore. As an issue emerging alongside offshore prefabrication, extended producer responsibility (EPR) is yet to be clearly identified, allocated, and implemented. This research develops a conceptual framework using a design thinking process, through which EPR associated with offshore prefabrication can be analyzed, agreed upon, and allocated. By considering the scope and scale of the responsibility and the procurement methods, the framework comprises four quadrants representing four typical scenarios for implementation of the EPR principle. It is applicable for both short-term and lifelong EPR analysis, in both traditional and integrated project delivery contexts. The framework will be particularly useful for devising public policies to achieve an onshore and offshore stakeholder win-win situation. and final disposal. EPR is an environmental policy approach of Organisation for Economic 64 Co-operation and Development (OECD, 2001) , which extends producers' physical and 65 financial responsibilities to the post-consumer stage of a product's life cycle. Advocates of 66 EPR are particularly focused on channelling back to producer's responsibilities for dealing 67 with waste, forcing a shift from the traditional silo of production to a more holistic approach 68 encompassing not only design, production, marketing, and distribution of products, but also 69 eventual recycling. Already explored as a regulation or law in developed economies 70 including Europe (European Parliament and Council Directive, 2000) , the US (Nash and 71 Bosso, 2013), Canada (Canadian Council of Ministers of the Environment, 2017), and Japan 72 (Ogushi and Kandlikar, 2007) , EPR is now being introduced with its implications in the fields 73 of packaging waste (Nahman, 2010; Pires et al., 2015) , management of waste electrical and 74 electronic equipment (Manomaivibool, 2009) , vehicle remanufacturing (Xiang and Ming, 75 2011), plastic products (Leal Filho et al., 2019) , and buildings (Acree Guggemos and Horvath, 76 2003) . However, the implication of EPR in offshore prefabrication is complicated compared to other 79 manufacturing fields. Precast construction components normally have a service life of fifty 80 years or longer before the building is demolished. How, in reality, can EPR operate with 81 regards to, e.g. takeback and demolition waste recycling? If an extra fee is imposed during 82 importation, for example, manufacturers may simply add it to the selling price. Offshore 83 prefabrication clients are not always in a buyer's market. Should they also extend 84 responsibilities for occupational health and safety, working environment provision, 85 professional standard upholding, corporate social responsibility, and local talent training to 86 producers so that a predatory economy does not arise around offshore prefabrication? How to 87 deal with the situation that offshore prefabrication is faced with multiple administrative 88 authorities with diverse environmental regulations or policies? These dilemmas thus lead to 89 the research question: how to implement EPR in offshore prefabrication construction with 90 regards to multiple stakeholders and procurement methods? 91 92 This research aims to develop a conceptual analytical framework using a design thinking 93 process. Through this framework, EPR associated with offshore prefabrication can be 94 analyzed and allocated, fostering a win-win situation among stakeholders including clients, 95 designers, contractors, manufacturers, and environmental management authorities. The 96 remainder of the paper is structured as follows. Subsequent to this introductory section is an 97 EPR and offshore prefabrication literature review in Sections 2 and 3, respectively. Section 4 98 is a description of our design thinking research methodology. Section 5 presents our 99 conceptual framework, elaborating on its components and how it can be used. Section 6 is an 100 in-depth discussion of the EPR framework, including its pros and cons, prospects and 101 challenges, followed by a conclusion in Section 7. 102 103 J o u r n a l P r e -p r o o f 2005). Given problems that have led to the adoption of EPR, including lack landfill space, 144 contamination, hazardous waste production, and abandonment of products in the environment 145 (Spicer and Johnson, 2004) , an EPR programme should be designed by considering industries 146 and products covered by the policy context, the forms of organization, and the economic, 147 social and cultural context in which the programme operates (OECD, 2005) . Generally, there 148 are two ways to achieve EPR programmes by a legal means, economic regulations and 149 administrative controls. Economic regulations aim to stimulate stakeholders to adopt EPR by 150 a series of economic mechanisms, such as 'deposit-refund' mechanism and lease or service 151 economy mechanisms, while administrative control measures are mainly to improve the 152 market access threshold for the industry, government supervision and recognition (Xiang and 153 Ming, 2011) . Despite the fact that EPR can provide substantial benefits, its implementation 154 still has a large room for improvement, at present, most EPR legislations are organized at 155 sectoral level due to the convenience for implementation, where costs for the collection and 156 recycling are shared among participants based on the market of products in the market, but 157 this approach damages the ambition of individual companies to develop more circular 158 products (Milios, 2018) . Some pioneers have explored the adoption of EPR in the construction industry due to the 161 large amount of waste generated (Lu and Tam, 2013) . Guggemos and Horvath (2003) 162 explored EPR strategies for buildings, finding that, due to the uniqueness of building 163 products, takeback policies of other industries are infeasible for entire buildings but possible 164 for some building materials and components. Similarly, Balba et al. (2013) evaluated EPR 165 potential for different construction materials in metro Vancover and found that EPR can only 166 be recommended to several types of materials. Generally, compared with the exploration of 167 EPR in other industries, to probe into EPR in the construction industry is still in its infancy. 168 Particularly, how to analyze and allocate EPR in cast in-situ and offshore prefabrication 169 construction remains unsolved. 170 171 3. Offshore prefabrication construction 172 EPR in construction cannot be understood without appreciating the heterogeneity of the 173 industry. Construction products such as buildings and bridges are bespoke, unlike the 174 standardized, transferable products that are designed, prototyped, and massively produced for 175 the market. There is a long production cycle for construction outputs, from concept to project 176 completion and then outputs normally having a lifespan of over fifty years. C&D waste is 177 mainly generated at the construction and demolition stages at opposing ends of a building's 178 lifecycle. Unlike standardized products which are produced by major firms, design or 179 construction services are provided by a myriad of fragmented companies contracted to do a 180 parcel of the jobs, leading to the widespread discontinuity problems. Production services in 181 the construction industry are often organized under different projects. It is extremely difficult, 182 if not impossible, to allocate any takeback responsibility to these temporary organizations 183 which will dissolve after project completion. All of these factors contribute to the conundrum 184 of EPR in construction. In considering EPR, prefabrication is closer to the known production. This manufacturing 187 process generally takes place at a specialized factory or manufacturing site, where various 188 materials are joined to form a component part of a final installation (Tatum et al., 1986) . In 189 construction, the term "prefabrication" is often used interchangeably with others, such as pre-190 assembly in construction (Gibb, 2001) , off-site construction (Pan et al., 2008; Taylor, 2010), 191 industrialized building (Jonsson and Rudberg, 2014) , and combinations thereof, such as off-192 site fabrication (Gibb, 1999) . Definitions of these terms depend almost entirely on the 193 previous experience of the users, but each of them has their own focus (Gibb, 2001) . For 194 example, prefabrication emphasizes the manufacturing process of the component; pre-195 assembly focuses on the process of subsequent installation as a sub-unit with the location of 196 the process not being the key point; and off-site construction highlights that some of the 197 fabrication works have been moved from the construction site to the factory. Prefabrication 198 construction, the term used in this paper, indicates that a certain proportion of the 199 construction work is prefabricated , either as individual components, or in the 200 assembly of building modules. Some aspects of prefabrication construction transcend national boundaries, since economic 203 globalization has created an interdependent market for construction companies (Ye et al., 204 2017) . This is called offshore prefabrication construction (Lu and Yuan, 2013) . The "offshore" 205 concept is inherited from international business, where it refers to a location of business 206 functions outside of one's national boundaries, whether that location is land-or water-based 207 (Roza et al., 2011) . Offshoring strategy has emerged from the waves of global sourcing since 208 the mid-1980s, when supply chains became more global and complex (Kotabe et al., 2009) . 209 The drivers for companies' offshoring strategy are generally lower costs and abundant 210 resources at offshore locations (Roza et al., 2011) . Construction works, including 211 prefabrication, require much material and labor, but companies are faced with rising material 212 costs and labor shortages (Turner and Townsend, 2019) . This dilemma has forced the sector 213 to reconfigure its resources globally, and this process includes use of offshore prefabrication. However, issues emerge with offshore prefabrication beyond those arising from the 216 heterogeneity of traditional construction. When prefabrication takes place offshore, it is hard 217 to ensure production standards consistency. This may lead to quality issues: the qualified 218 components in offshore place may not be accepted due to different codes of production or 219 cultural differences between onshore and offshore places (Gibb, 1999) . Operational risks also 220 exist for the process (Aron and Singh, 2005) , meaning that processes may not operate 221 smoothly after being offshored. Li et al. (2016) argued that fragmentation and discontinuity 222 of the offshore prefabrication construction supply chain lead to frequent project schedule 223 delays. Offshore prefabrication also contends with a more complex context, with added 224 stakeholders involved such as offshore manufacturers, transporters, and local authorities, and 225 divergent regulatory environments. Lu and Yuan (2013) reflected that it is much easier to 226 minimize waste in prefabrication than on construction sites. From a normative perspective, 227 offshoring strategy is argued to transfer parts of responsibilities out of nations, such as 228 responsibilities for labor, or the environment (Doh, 2005; Lu et al., 2015) . Amid the global 229 resurgence of offshore prefabrication construction, revisiting EPR is warranted by 230 incorporating considerations of diverse codes of production, multiple stakeholders, different 231 procurement methods, and global level responsibilities. 232 233 4. Research methods 234 This study adopts design thinking, "a methodology that imbues the full spectrum of 236 innovation activities with a human-centered design ethos" (Brown, 2008) . It emphasizes 237 "thinking like a designer" who would traditionally focus on improving the functionality of 238 products based on client or customer needs (Brown and Wyatt, 2010) . By working closely 239 with clients and consumers, design thinking allows "high-impact solutions to bubble up from 240 below rather than being imposed from the top" (Brown and Wyatt, 2010) . There are five core 241 characteristics of design thinking: 1) a user centered approach, 2) an integrative and holistic 242 view on complex problems, 3) collaboration in multidisciplinary teams, 4) a mix of mental 243 processes mainly in abduction, and 5) a strong integration of experimenting with artefacts 244 (Geissdoerfer et al., 2016) . With these characteristics, this methodology goes beyond today's 245 conventional problem solving, using a designer's sensibility and methods to match people's 246 needs with what is technologically feasible or a viable business strategy (Brown and Wyatt, 247 2010). The design thinking process consists of five steps or stages: empathize, define, ideate, 250 prototype and test. The empathize stage is the effort to understand people within the context 251 of challenge, with empathy providing the critical starting point for design thinking; the define 252 stage crafts a meaningful and actionable problem statement; the ideate stage combines 253 understanding of the problem space and user with imagination to generate solutions; the 254 prototype stage turns ideas into tangible products; and the test stage interacts with users again. 255 Brown (2008) summarized these stages into three spaces, i.e. inspiration, ideation, and 256 implementation, to indicate the process of finding problems, coming up with solutions, and 257 implementing solutions. Design thinking is not a linear path, but a continual looping back to 258 different places in the process (Brown and Wyatt, 2010) . With the aim of exploring a conceptual framework for EPR associated with offshore 261 prefabrication construction, this research involves many stakeholders in onshore and offshore 262 countries and requires multiple methods to be organized in a systematic fashion. Its nature 263 J o u r n a l P r e -p r o o f thus lends itself to a design thinking methodology. To be well adopted, a design thinking 264 methodology needs to be specified. For example, Geissdoerfer et al. (2016) proposed their 265 design thinking framework based on literature synthesis, expert interviews, and multiple 266 workshops; Cerejo and Barbosa (2012) applied their design thinking methodology with 267 specific methods of case studies, brainstorming, and surveys. In this specific context, we 268 specify our design thinking methodology as five design thinking process stages along with 269 methods including interviews, brainstorming, and case studies (see Fig.1 ). The case study is a qualitative research method with concerns on how and why things occur, 276 which allows investigations of contextual realities and differences between what was planned 277 and what actually happened (Anderson et al., 1998) . It has been widely applied for in-depth 278 studies across disciplines as it enables researchers to gain a holistic view of a certain 279 phenomenon, understand complex real-life activities, come up hypotheses and generate 280 theories (Gummesson, 2000; Noor, 2008) . As an important part of the design thinking 281 methodology, a case study can adapt the conceptual framework developed from scratch into a 282 real context, making the framework more concrete and generalizable to other settings in the 283 world. We conducted case studies as a specific approach of the design thinking methodology with 286 the purpose of embedding our basic ideas on EPR of offshore prefabrication construction and 287 its framework in an eligible context. In this way, we can test and validate our framework by 288 linking it to the reality. We chose the Greater Bay Area (GBA) as the context of our case 289 studies, which involves Hong Kong, Macao, and the Pearl River Delta (PRD), Guangdong 290 Province, China, which are located in the same area with different political systems. The 291 Hong Kong government enacted a series of Joint Practice Notes (Building Department of 292 Hong Kong, 2001; 2002) to encourage the adoption prefabrication and modular integrated 293 construction with the aim of supporting the Hong Kong's massive construction programs 294 while reducing its waste management burden. Embedding this, Hong Kong actively exploits 295 supplies, including construction materials and precast components, produced in the world's 296 factory. Thousands of Hong Kong-based manufacturing businesses, including the entire 297 prefabrication industry, have relocated to the GBA, reflected as the concept -offshore 298 prefabrication. Lu and Yuan (2013) reported that the underlying force is to exploit the GBA's 299 cheap and abundant materials and labor force, similar to the foreign entities referred to above, 300 as well as the space available. This widely explored cooperation mode and increasing 301 environmental concerns provide an opportunity to explore EPR of offshore prefabrication 302 construction in GBA. We have conducted two case studies straddling over several years. The first one relates to a 305 series of stakeholder engagement activities (e.g., meetings, visits, talks, and community 306 engagement) initiated in 2013 by the Hong Kong government and industry to tackle Hong 307 Kong's urgent C&D waste management issues. Increasing waste disposal charges and 308 exploring EPR were high on the agenda. The second case study was conducted alongside two 309 big research projects undertaken by this team from 2014 to 2019 exploring the potential of 310 auto-ID and BIM technologies for managing the cross-border public housing logistics and 311 supply chain. The factory we have frequently engaged with over five years supplies around 312 15% of all precast components consumed in Hong Kong per annum. We have also visited 313 most of the sizable prefabrication yards in the PRD. Although the purpose was not initially 314 EPR-related, these visits were an invaluable opportunity to probe into the offshore 315 prefabrication industry between Hong Kong and the PRD and the EPR debates arising from 316 the first case study. 317 318 Following the design thinking methodology, a series of semi-structured interviews were 320 conducted in the GBA, to garner insights on offshore prefabrication construction EPR. The 321 semi-structured interview is a commonly used qualitative research method involving a series 322 of predetermined, open-ended questions (Given, 2008) . During our two case studies over the 323 years and another recent research project concerning the GBA, we have conducted dozens of 324 "trawling" interviews. Some were directly related to EPR, but most were about the offshore 325 prefabrication industry in GBA. We propose the conceptual framework shown in Fig. 2 , aimed at facilitating stakeholders to 342 analyze, agree on, and allocate the EPR associated with offshore prefabrication construction. 343 The framework distinguishes the offshore place where the prefabricated products are 344 manufactured and the onshore place where the prefabricated products are designed, 345 assembled and utilized. Five directly related stakeholders are organized in the offshore and 346 onshore places: prefabrication manufacturer, environmental management authority (EMA), 347 client, designer, and contractor. The framework can be understood from two dimensions: scope and scale of the responsibility, 350 and procurement methods. The producers' waste minimization responsibility can be 351 comprehended in the short term and lifelong. By short-term responsibility, we mean saving 352 C&D waste immediately by adopting greener prefabrication at design, prefabrication, and 353 construction stage. This part of the responsibility, like its counterparts in other ordinary 354 products, can be identified and allocated when the building is designed, manufactured, and 355 constructed. By lifelong responsibility, we mean the reduction, reuse, and recycling (the 3Rs) 356 of the residual waste when the building is demolished. Such division reflects the nature of 357 C&D waste generation, which straddles decades from construction to demolition stages of a 358 building's lifecycle. The EPR of waste minimization can also be comprehended from project procurement 361 methods. In traditional project delivery, a.k.a., design-bid-build, parties such as client, 362 designer, and contractor are separate. They only do a parcel of the works during the design 363 and construction stages. Contractors and subcontractors are only engaged to materialize 364 whatever design has passed from the designer and are reimbursed when their construction 365 services are rendered. The project team formed by these parties will normally dissolve after 366 the project is constructed. Integrated project delivery (IPD) means methods such as design-367 build and public-private partnership, whereby the designer, contractor, and other parties form 368 one consortium lasting for the duration of the design and construction period, and sometimes 369 extending to operations and whole lifecycle. This IPD thus provides a window of opportunity 370 to assume EPR, particularly in relation to the 3Rs of residual waste. By following the two dimensions, the conceptual framework is developed as a four-quadrant 373 system, each containing a typical EPR scenario, as shown in Fig. 2 . Each of the scenarios is 374 elaborated upon in the following subsections. 375 In traditional project delivery (TPD) methods, the environmental management agency (EMA), client, designer, contractor onshore, and manufacturer offshore are the key stakeholders. The EMA imposes C&D waste minimization responsibility on the client, who will normally pass this responsibility on to the designer and contractor. They enter separate contracts with the client and have no contractual relationship with each other. The contractor will also have a contractual relationship with the offshore manufacturer. Under this situation, responsibility shirking between designer, contractor, and manufacturer occurs frequently (Lin et al., 2017) , which adds management difficulties to clients and hampers the achievement of waste minimization goals. Short-term responsibility, i.e., immediate waste minimization, can be achieved through greener design, materials, and prefabrication technology. The client will require cleaner prefabrication products designed and delivered by the parties as mentioned above. Under EPR, clients and designers will also transfer responsibilities to manufacturers. Ideally, offshore manufacturers will minimize waste generation by adopting greener design, materials, or technologies. Meanwhile, the contractor and manufacturer can argue that they just receive the design and produce it. There is not much they can do to assume this EPR and achieve the designated sustainability goals. That is, in TPD methods, even under the pressure of EPR, it is still highly possible that the contractor, manufacturer, and designer tend to shirk from short-term waste minimization responsibilities and pass the duties to others. Therefore, the EMA and client need to formulate stricter waste minimization regulations and stronger supervision forces, nevertheless it is hard to ensure their effects. The EPR effectiveness under this scenario is thus discounted. In integrated project delivery (IPD), the key stakeholders remain the same, but their relationships are different. The client contracts with a consortium of design and construction firms. This consortium will have a contractual relationship with the offshore manufacturer and sometimes even internalize a producer within their remit of business. Unlike in TPD, the consortium will provide the client with one-stop services including design-build, or even operation/facilities management. It is the only responsible subject for the project. The client only focuses on specifying the services it needs, the goals to achieve, and the responsibility description for the consortium. Short-term responsibility imposed by the EMA on the client can be written as a part of the specification and legitimately passed to the design and build consortium. With the more integrated services it supposedly provides, the consortium can work closely with the offshore manufacturers to assume EPR, e.g., by pondering greener design, and adopting more sustainable and recyclable materials, a cleaner offshore production strategy, and a cleaner onshore assembly method. The consortium can achieve the short-term waste saving goal by collaborating with the offshore manufacturer. The accountability of the waste minimization is easier to conduct for both the client and the EMA. EPR under this scenario can therefore stimulate a virtuous circle among stakeholders by facilitating greener design and cleaner production approaches to reduce wastes in the short-term and enhancing the efficiency of waste minimization at a lower regulation cost. Lifelong responsibility is concerned with the 3Rs of residual waste when a building comes to the end of its service life. For ordinary products such as glass bottles, cars, or airplanes, their EPR can be assumed when they are produced, or at least, traced back to the makers. However, for building products, which utilize materials from various suppliers and normally last fifty years or longer, EPR is difficult to identify and allocate. This is particularly true for TPD, as stakeholders such as clients, designers, contractors, and manufacturers are fragmented and unlikely be traceable after fifty years. In this scenario, the stakeholders and their relationships remain almost the same as those in Scenario I. What is new is the introduction of a producer responsibility organization (PRO): a non-profit organization jointly supported by offshore manufacturers and onshore EMA to be responsible for the onshore 3Rs of all manufacturers' prefabricated products when the buildings are demolished. When the building is constructed, the PRO will sign a contract with the client, the contractor, or the manufacturer, who will pay a service fee based on the industry's standard. Even if the stakeholders are non-traceable when the building is demolished, the PRO is still there to handle the 3Rs on behalf of the manufactures or other stakeholders who entered the contract. In fact, this practice is widely seen in analyzing, agreeing upon, and allocating the EPR of ordinary products. Upon demolition, the recyclable and reusable materials can be treated and exported back to the manufacturers. The manufacturers can also receive subsidies from the PRO to maintain a healthy balance sheet. Therefore, manufacturers will be driven by the profit of low-price recyclable and reusable materials and subsidies of reduced waste to employ greener materials during production. By paying a fee now for a product to be taken back in fifty years, waste minimization responsibility is placed upfront. Stakeholders, in particular manufacturers, will be incentivized to carefully consider strategies to minimize the C&D waste generation. With the PRO to take the lifelong responsibility, the whole industry is better organized and incentivized for the greener, cleaner and more sustainable development. However, while the designer is not contractually connected with the contractor and manufacturer, the latter may find it difficult to change the design which are not green and sustainable enough. The PRO can neither communicate design requirements directly to designers. Consequently, the PRO, contractor, and manufacturer may shirk the EPR to designers. Thus, the impact of the EPR under this scenario can also be discounted. This scenario concerns the EPR in a building project adopting IPD. We maintain the design of the PRO, which will assume lifelong 3R responsibility as in Scenario III. The PRO will have a direct relationship with the EMA, client, contractor, and the manufacturer. What is slightly different here is the contractual relationship with the design-construction consortium. The manufacturer can have a direct strong relationship with the design team of the consortium, and it makes the communication of greener design easier and more efficient. The PRO can also directly talk to the designers to improve green design requirements and standards. This approach will get the designers more involved in the whole ecosystem and consider waste minimization since the start of design. The communication cost between the stakeholders will thereby be reduced. Moreover, by working with the offshore prefabrication manufacturer, the design-construction consortium can directly undertake EPR. Unlike the temporary project teams in TPD projects, the consortium in this IPD is a long-standing organization in a good position to undertake EPR for cleaner production and waste reduction. Lifelong EPR in IPD methods will turn the industry more compact and efficient in reducing waste by shifting design closer to manufacturing and construction at an earlier stage. The impacts of EPR can reach its full potential under this scenario. Despite the promise of EPR in minimizing C&D waste, all the unique characteristics of construction products, productions, and practices make EPR implementation difficult. Our research approaches the problem by structuring it into two dimensions; short-and long-term responsibility, and traditional project delivery (TPD) and integrated project delivery (IPD) methods. The division into short-and long-term responsibility recognizes that waste is mainly generated during construction and demolition, which may be decades apart. The division between TPD and IPD recognizes the fragmentation and discontinuity issues in construction. The two dimensions divide the problem domain into a four-quadrant system, wherein each quadrant represents a typical industrial scenario for analyzing EPR. One finding, not explored before, is that IPD as a procurement innovation has great potential for assuming EPR. Interviewee A, a prefabrication manufacturer, said: In our (construction) business, what are we afraid of? It is long tail. Like it or not, it is our nature to get it done, get yourself paid, and quickly move on. This view was echoed by Interviewee F, who runs a material supply business. Nevertheless, a clear trend in recent construction management literature is to advocate IPDs such as designbuild (DB), public-private partnership (PPP), and built-operate-transfer (BOT). Whilst prevailing literature is concerned with integrated services (Gu et al., 2019) , innovative financing (Mayers, 2007) , or lifelong and stable services (McKerlie et al., 2006) , this research finds that IPD, by reducing discontinuity and organizing compact consortiums, increases the accountability and efficiency of implementing EPR. It also supplements the existing theory of project management that IPD can facilitate coordination and better performance (Mesa et al., 2016; Hamzeh et al., 2019) for waste management. It is apparent that, to sustain their existence, the operation of producer responsibility organizations (PROs) should be superior to existing C&D waste management services. Many companies specializing in the C&D waste management are thriving in emerging cities such as Shenzhen and Suzhou (Bao et al., 2019; Li et al., 2020) . As competitive market entities, they can be commissioned as the PRO. This was endorsed by Interviewee B: These companies are doing good business in Shenzhen's zero waste strategy. They are specialized in construction waste management, with their onsite and offsite plants. They can stand for long if we further pursue a zero-waste society with the economic development in this city. As business lines from both the regular market and the EPR, these companies will be in a more stable position to assume the EPR. This exploring practice is worth promoting in other countries and areas to found PROs based on existing waste management companies. The PRO can originate from either a single company or a consortium of several companies. This approach can both benefit the contractors and clients by shifting their waste management responsibility to specialized organizations and profit the waste management companies by expanding their service scale and influences in the construction ecosystem. By doing so, the stream of the construction industrial chain will be completely integrated (Briscoe & Dainty, 2005) . Implementing EPR can also exploit technological advancements. In our previous studies, Internet of Things (IoT) technologies, such as global positioning system (GPS), radio frequency identification (RFID), Quick Response (QR) code, and smart construction objects (SCOs), have been adopted to track the transportation of precast components (e.g., façades, tile beams, volumetric kitchens) from the GBA to Hong Kong and in real time displace their status information in a building information model (Niu et al., 2016; Chen et al., 2017) . Similarly, these embedded technologies can be used to track and trace C&D waste . What is under explored is the emerging blockchain technology, which keeps immutable, cryptographic, and verifiable information in a decentralized ledger that transacting parties cannot change or deny (Li et al., 2019) . This technology seems to present a unique opportunity to handle discontinuity issues for prevailing project delivery organizations in assuming EPR. Information on waste generation and its agreed upon and allocated EPR can be safeguarded in blockchain, and cannot be shirked by responsible parties even decades later. All these techniques enhance the traceability and accountability of information to guarantee the successful implementation of EPR. The EPR framework will not survive without several factors being carefully considered. First, we need to change the mindset that producers/manufacturers can do little waste minimization as they receive a design from upstream. Interviewee A is a typical holder of this mindset: No problem. If you pay, I can do whatever you ask me to do. The separation of design and production in construction is an issue but increasingly the practice is to involve downstream manufacturers in product design through IPD or similar methods. This changing practice will provide an opportunity to refine the design to achieve EPR goals (OECD, 2001; . However, from a case study, Huang et al. (2019) found that EPR implementation leads to lower recyclability and higher durability in the photovoltaic panel industry. Therefore, design should not be separately considered in the EPR framework but should be integrated with other processes. Second, EPR needs a business case. For the short-term responsibility (i.e., immediate construction waste saving), the key is to have a mechanism to share the saving so as to incentivize different parties to sustain their EPR efforts. To quantify the saving, a baseline of the prevailing waste generation in current construction practice should be drawn, e.g., using various waste quantification methods (Xu et al., 2020) . For the long-term responsibility, manufacturers will be incentivized by the subsidies and low-price recyclable and reusable materials. In the business case, risk allocation and profit-sharing between stakeholders (Jones, et al., 2018) should be carefully designed to motivate the virtuous circle. Implementation of the EPR framework may be challenged by the changing relationships of a buyer's or a seller's market. In our case study, Interviewee A runs a massive offshore business, supplying around 15% of all prefabrication components used in Hong Kong. He serves various clients. It is typical for him to use a hedging and coordination model (Zhai et al., 2019) to accommodate multiple clients in multiple periods. When he was in a seller's market, imposing an EPR on him may not have had the expected outcome. Interviewee C said: Boss A tends to bid a lot of jobs, some are public clients like us, some are private real estate developers. You have to talk to them nicely. Talking about EPR? Don't joke. He may simply place the EPR fee in his bids, meaning it is actually paid by the client. Even worse, he may not bid the project altogether because of the EPR. Looking at industry level, prefabrication manufacturers in the region not only serve Hong Kong, Japan, and the US, but also face strong demand from the domestic market. Interviewee D reflected that: Nowadays, it is more and more difficult to negotiate with the local governments in the PRD. Recently, you see, Guangdong tightened the import of twenty-four types of waste material. To impose an EPR on these manufacturers may not have the desired result. Transaction cost theory will help explain this dilemma. If such transaction cost is only imposed on seller in one region, they would rather give up the transaction because they don't need to pay the EPR fee in other regions of the global market. But if this EPR fee is embedded in a global system, even a partially global system, the transaction cost will not be possibly escaped and EPR will result in a more structured industrial chain with a reduction in transaction costs and achieves greater consistency (Hickle, 2016) . Implementation of the EPR framework is also highly contingent on the changing ideology of globalization. While it has progressed quickly despite challenges (e.g., climate change, economic inequality, predatory economy), it has never been challenged like now. Heated debate on globalization has been triggered by trade wars and populism spreading around the world. The global Coronavirus disease 2019 (COVID-19) outbreak is further fueling the globalization backlash (Goodman, 2020) . The world will definitely revisit current logistics and supply chain (LSC) paradigm, and offshore prefabrication as a means of configuring construction LSC globally and its EPR implementation, will not be immune. Contingency theories should be employed in the analysis of long-term EPR implementation and LSC paradigm revisiting (Khalid et al., 2015) . Construction materializes the built environment, but it also generates a huge amount of waste. Over the years, it has become common industry practice to import raw materials and prefabricated products from offshore regions. In the context of the offshore prefabrication construction, this research considers how to implement the EPR principle, which aims to extend producer responsibilities for reducing, reusing, and recycling C&D waste so as to encourage them to pursue production in a cleaner way, e.g., by adopting green design, using recyclable materials, and developing low waste technologies. We develop a conceptual framework to analyze, agree upon, and allocate EPR in offshore prefabrication construction, recognizing two dimensions of difficulties: (a) responsibility for reducing, reusing, and recycling arising at the stages of construction and demolition, decades apart; and (b) fragmentation and discontinuity of stakeholders making the EPR untraceable and difficult to assign. By following the two dimensions, we develop our framework into a four-quadrant system, each containing a typical EPR scenario. Scenario I is concerned with how to analyze, agree upon, and allocate short-term responsibility (i.e., immediate saving of construction waste) when a traditional project delivery (TPD) method (e.g., design, bid, and build) is adopted. Producers (e.g., contractors and offshore manufactures) often adopt a passive stance, producing whatever design the client/designer presents. Scenario II concerns the short-term responsibility when an integrated project delivery (IPD) method (e.g., design-build, publicprivate partnership) is adopted. An IPD consortium as a single entity will be in a better position than that in TPD to assume EPR. Scenario III concerns the long-term responsibility (i.e., 3Rs of residual waste when a building is demolished) when a TPD method is adopted. In this scenario, a producer responsibility organization (PRO), widely seen in electronic and car industries, is introduced to overcome fragmentation and discontinuity problems. Scenario IV relates analyzing, agreeing upon, and allocating long-term responsibility when an IPD is adopted. In this scenario, both the PRO and IPD consortium can act as a long-standing organization to assume EPR. EPR is an innovative principle aimed at alleviating the downside of the prefabrication construction/production. Moreover, several managerial implications are discussed: (1) Implementation of the EPR conceptual framework should exploit procurement innovation and advanced technological instruments, e.g., auto-ID and blockchain; (2) It should consider changing the ingrained passive mindset and seeking a business case to sustain in the market; (3) Special attentions should be paid to the shifting relationships of a buyer's or a seller's market commonly witnessed in the offshore prefabrication construction; (4) EPR in construction, emerging from a conspicuous background of economic globalization, now faces changes in this background, triggered by climate crisis, trade wars, populism, and more recently the outbreak of COVID-19. This research extends the implication of EPR to C&D waste management in the construction industry which is different from other traditional industries due to its long production cycle and heterogenous characteristics. It contributes to the project management theory by supplementing that IPD is not only a better project delivery method for communication and project performance but also for waste minimization and sustainable project. It further contributes to the stakeholder management theory by pointing out that fragmented stakeholders are difficult to manage while a consortium of stakeholders will largely solve the problem. For the waste management practice, it extends the waste minimization responsibility to producers, suggesting an ideal approach to implement EPR in offshore prefabrication construction by introducing a novel PRO and the IPD methods, and finally aims to reduce C&D waste from the upper part of industrial chain. Strategies of extended producer responsibility for buildings Fundamentals of Educational Research Extended producer responsibility for e waste: Individual or collective producer responsibility Assessing the potential for extended producer responsibility in construction, renovation and demolition waste in Metro Vancouver Developing efficient circularity for construction and demolition waste management in fast emerging economies: Lessons learned from Shenzhen, China Procurement innovation for a circular economy of construction and demolition waste: Lessons learnt from Suzhou Construction supply chain integration: an elusive goal? Design thinking Design thinking for social innovation Joint Practice Note no.1. Green and Innovative Buildings Second Package of Incentives to Promote Green and Innovative Building. HKSARG, Hong Kong Canadian Council of Ministers of the Environment (2017) The application of design thinking methodology on research practices: A mind map of tools and method Modeling the e-waste mitigation strategies using Grey-theory and DEMATEL framework A physical Internetenabled BIM system for prefabricated construction Construction waste minimization in green building: A comparative analysis of LEED-NC 2009 certified projects in the US and China Critical factors for environmental regulation change management: Evidences from an extended producer responsibility case study Offshore outsourcing: Implications for international business and strategic management theory and practice European Parliament and Council Directive 2000/53/EC of 18 Design thinking to enhance the sustainable business modelling process-A workshop based on a value mapping process Off-site fabrication: Prefabrication, pre-assembly and modularisation Pre-assembly in Construction (CRISP): A review of recent and current industry and research initiatives on pre-assembly in construction The Sage encyclopedia of qualitative research methods Towards a zeroemission, efficient, and resilient buildings and construction sector: Global Status A global outbreak is fueling the backlash to globalization. The New York Times An integrated architecture for implementing extended producer responsibility in the context of Industry 4.0 Strategies of extended producer responsibility for buildings Qualitative methods in management research Integrated project delivery as an enabler for collaboration: a Middle East perspective To realize better extended producer responsibility: Redesign of WEEE fund mode in China The policy and practice of extended producer responsibility: an assessment of key themes and policy choices for advancing sustainable materials management Evaluation of a new extended producer responsibility mode for WEEE based on a supply chain scheme. Science of The Total Environment Life cycle design and prefabrication in buildings: A review and case studies in Hong Kong Waste electrical and electronic equipment (WEEE) management in Korea: generation, collection, and recycling systems How applying instrumental stakeholder theory can provide sustainable competitive advantage Classification of production systems for industrialized building: A production strategy perspective Putting sustainable supply chain management into base of the pyramid research Electronic waste management in Addis Ababa: The case of Bole and Nefas Silk Lafto sub-cities Global sourcing strategy. The SAGE Handbook of International Marketing An overview of the problems posed by plastic products and the role of extended producer responsibility in Europe Schedule risks in prefabrication housing production in Hong Kong: A social network analysis Blockchain in the built environment and construction industry: A systematic review, conceptual models and practical use cases Environmental impact assessment of mobile recycling of demolition waste in Shenzhen Who should take the responsibility? Stakeholders' power over social responsibility issues in construction projects Extended producer responsibility in cleaner production: Policy principle to promote environmental improvements of product systems Investigating waste reduction potential in the upstream processes of offshore prefabrication construction Searching for an optimal level of prefabrication in construction: An analytical framework Procurement innovation for public construction projects: A study of agent-construction system and public-private partnership in China. Engineering, Construction and Architectural Management Construction waste management policies and their effectiveness in Hong Kong: A longitudinal review Computational BIM for construction waste management: moving from rhetoric to reality Corporate social responsibility disclosures in international Construction Business: Trends and prospects Extended producer responsibility in a non-OECD context: The management of waste electrical and electronic equipment in India. Resources, Conservation and Recycling Strategic, financial, and design implications of extended producer responsibility in Europe: A producer case study Advancing extended producer responsibility in Canada Exploring performance of the integrated project delivery process on complex building projects Advancing to a Circular Economy: three essential ingredients for a comprehensive policy mix Extended producer responsibility for packaging waste in South Africa: Current approaches and lessons learned. Resources, Conservation and Recycling Extended producer responsibility in the United States: Full speed ahead? An SCO-enabled logistics and supply chain management system in construction Case study: A strategic research methodology Extended producer responsibility: A guidance manual for governments Assessing extended producer responsibility laws in Japan Recovery decisions of a producer in a legislative disposal fee environment Extended producer responsibility: regulation design and responsibility sharing policies for a supply chain Extended producer responsibility: a differential fee model for promoting sustainable packaging The top 225 international contractors-Firms are now more selective. Engineering News Record Offshoring strategy: Motives, functions, locations, and governance modes of small, medium-sized and large firms Third-party demanufacturing as a solution for extended producer responsibility Best practice of prefabrication implementation in the Hong Kong public and private sectors Constructability improvement using prefabrication, preassembly, and modularization A definition and valuation of the UK offsite construction sector International construction market survey Implementing extended producer responsibility: vehicle remanufacturing in China Is the private sector more efficient? Big data analytics of construction waste management sectoral efficiency. Resources, Conservation & Recycling Diversification in the international construction business Multi-period hedging and coordination in a prefabricated construction supply chain