id author title date pages extension mime words sentences flesch summary cache txt work_k7evadzfrff7tepoln7wxbshni M. Parente An evolutionary multi-objective optimization system for earthworks 2015 31 .pdf application/pdf 10449 685 53 earthwork construction progresses, the equipment must be optimally reallocated in order to work adopts a popular EMO method, the non-dominated sorting genetic algorithm-II (NSGAII) algorithm, to tackle the multi-criteria optimization problem associated with resource as material type, the work rate for each task in the production line can be easily computed, times from incurring on the allocated equipment, in cases where the work rate of the previous The optimal allocation of earthwork equipment is carried with the main objective of duration of the production line work, Tpl, corresponds to the volume of material associated As the allocation of equipment dictates the resulting construction time and cost, the Steps for determination of total cost and duration of equipment allocation solutions 4 Allocate spreading equipment Total productivity in compaction task for solely on the optimal distribution of compaction equipment (the last task of the production each construction phase as a completely new optimal allocation of equipment, which must ./cache/work_k7evadzfrff7tepoln7wxbshni.pdf ./txt/work_k7evadzfrff7tepoln7wxbshni.txt