id sid tid token lemma pos 16440 1 1 AMERICAN AMERICAN NNP 16440 1 2 SOCIETY SOCIETY NNP 16440 1 3 OF of IN 16440 1 4 CIVIL CIVIL NNP 16440 1 5 ENGINEERS engineer NNS 16440 1 6 INSTITUTED institute VBD 16440 1 7 1852 1852 CD 16440 1 8 TRANSACTIONS TRANSACTIONS NNP 16440 1 9 Paper Paper NNP 16440 1 10 No no NN 16440 1 11 . . . 16440 2 1 1170 1170 CD 16440 2 2 THE the DT 16440 2 3 WATER WATER NNP 16440 2 4 SUPPLY supply NN 16440 2 5 OF of IN 16440 2 6 THE the DT 16440 2 7 EL EL NNP 16440 2 8 PASO PASO NNP 16440 2 9 AND and CC 16440 2 10 SOUTHWESTERN SOUTHWESTERN NNP 16440 2 11 RAILWAY RAILWAY NNP 16440 2 12 FROM from IN 16440 2 13 CARRIZOZO CARRIZOZO NNP 16440 2 14 TO to IN 16440 2 15 SANTA SANTA NNP 16440 2 16 ROSA ROSA NNP 16440 2 17 , , , 16440 2 18 N. N. NNP 16440 3 1 MEX MEX NNP 16440 3 2 . . . 16440 4 1 [ [ -LRB- 16440 4 2 A a NN 16440 4 3 ] ] -RRB- 16440 4 4 BY by IN 16440 4 5 J.L. J.L. NNP 16440 5 1 CAMPBELL CAMPBELL NNP 16440 5 2 , , , 16440 5 3 M. M. NNP 16440 5 4 AM AM NNP 16440 5 5 . . . 16440 6 1 SOC SOC NNP 16440 6 2 . . . 16440 7 1 C.E. C.E. NNP 16440 8 1 WITH with IN 16440 8 2 DISCUSSION DISCUSSION NNP 16440 8 3 BY by IN 16440 8 4 MESSRS MESSRS NNP 16440 8 5 G.E.P. G.E.P. NNP 16440 9 1 SMITH SMITH NNP 16440 9 2 , , , 16440 9 3 KENNETH KENNETH NNP 16440 9 4 ALLAN ALLAN NNP 16440 9 5 , , , 16440 9 6 and and CC 16440 9 7 J.L. J.L. NNP 16440 10 1 CAMPBELL CAMPBELL NNP 16440 10 2 . . . 16440 11 1 _ _ NNP 16440 11 2 Location_.--The location_.--the ADD 16440 11 3 El El NNP 16440 11 4 Paso Paso NNP 16440 11 5 and and CC 16440 11 6 Southwestern Southwestern NNP 16440 11 7 Railway Railway NNP 16440 11 8 traverses traverse VBZ 16440 11 9 the the DT 16440 11 10 arid arid NN 16440 11 11 country country NN 16440 11 12 west west NN 16440 11 13 of of IN 16440 11 14 the the DT 16440 11 15 100th 100th JJ 16440 11 16 Meridian Meridian NNP 16440 11 17 in in IN 16440 11 18 New New NNP 16440 11 19 Mexico Mexico NNP 16440 11 20 , , , 16440 11 21 Texas Texas NNP 16440 11 22 , , , 16440 11 23 and and CC 16440 11 24 Arizona Arizona NNP 16440 11 25 , , , 16440 11 26 as as IN 16440 11 27 shown show VBN 16440 11 28 on on IN 16440 11 29 the the DT 16440 11 30 map map NN 16440 11 31 , , , 16440 11 32 Fig Fig NNP 16440 11 33 . . . 16440 12 1 1 1 LS 16440 12 2 . . . 16440 13 1 The the DT 16440 13 2 water water NN 16440 13 3 supply supply NN 16440 13 4 herein herein NNP 16440 13 5 described describe VBD 16440 13 6 serves serve VBZ 16440 13 7 that that IN 16440 13 8 division division NN 16440 13 9 of of IN 16440 13 10 this this DT 16440 13 11 road road NN 16440 13 12 lying lie VBG 16440 13 13 between between IN 16440 13 14 Carrizozo Carrizozo NNP 16440 13 15 and and CC 16440 13 16 Santa Santa NNP 16440 13 17 Rosa Rosa NNP 16440 13 18 , , , 16440 13 19 a a DT 16440 13 20 distance distance NN 16440 13 21 of of IN 16440 13 22 128 128 CD 16440 13 23 miles mile NNS 16440 13 24 . . . 16440 14 1 _ _ NNP 16440 14 2 Rainfall_.--The rainfall_.--the CD 16440 14 3 average average JJ 16440 14 4 annual annual JJ 16440 14 5 precipitation precipitation NN 16440 14 6 is be VBZ 16440 14 7 9.84 9.84 CD 16440 14 8 in in IN 16440 14 9 . . . 16440 15 1 The the DT 16440 15 2 year year NN 16440 15 3 1909 1909 CD 16440 15 4 was be VBD 16440 15 5 exceptionally exceptionally RB 16440 15 6 dry dry JJ 16440 15 7 , , , 16440 15 8 with with IN 16440 15 9 a a DT 16440 15 10 rainfall rainfall NN 16440 15 11 of of IN 16440 15 12 less less JJR 16440 15 13 than than IN 16440 15 14 5 5 CD 16440 15 15 in in IN 16440 15 16 . . . 16440 16 1 _ _ NNP 16440 16 2 Original Original NNP 16440 16 3 Water Water NNP 16440 16 4 Supply_.--East Supply_.--East NNP 16440 16 5 and and CC 16440 16 6 west west NN 16440 16 7 of of IN 16440 16 8 El El NNP 16440 16 9 Paso Paso NNP 16440 16 10 , , , 16440 16 11 for for IN 16440 16 12 distances distance NNS 16440 16 13 of of IN 16440 16 14 270 270 CD 16440 16 15 miles mile NNS 16440 16 16 in in IN 16440 16 17 each each DT 16440 16 18 direction direction NN 16440 16 19 , , , 16440 16 20 the the DT 16440 16 21 railway railway NN 16440 16 22 crosses cross VBZ 16440 16 23 no no DT 16440 16 24 streams stream NNS 16440 16 25 , , , 16440 16 26 and and CC 16440 16 27 the the DT 16440 16 28 supply supply NN 16440 16 29 was be VBD 16440 16 30 obtained obtain VBN 16440 16 31 from from IN 16440 16 32 wells well NNS 16440 16 33 ranging range VBG 16440 16 34 from from IN 16440 16 35 100 100 CD 16440 16 36 to to IN 16440 16 37 1,100 1,100 CD 16440 16 38 ft ft NN 16440 16 39 . . NNP 16440 16 40 in in IN 16440 16 41 depth depth NN 16440 16 42 . . . 16440 17 1 On on IN 16440 17 2 the the DT 16440 17 3 division division NN 16440 17 4 served serve VBN 16440 17 5 by by IN 16440 17 6 the the DT 16440 17 7 new new JJ 16440 17 8 supply supply NN 16440 17 9 , , , 16440 17 10 this this DT 16440 17 11 well well NN 16440 17 12 - - HYPH 16440 17 13 water water NN 16440 17 14 is be VBZ 16440 17 15 of of IN 16440 17 16 very very RB 16440 17 17 bad bad JJ 16440 17 18 quality quality NN 16440 17 19 , , , 16440 17 20 as as IN 16440 17 21 shown show VBN 16440 17 22 in in IN 16440 17 23 Table table NN 16440 17 24 1 1 CD 16440 17 25 . . . 16440 18 1 After after IN 16440 18 2 the the DT 16440 18 3 most most RBS 16440 18 4 thorough thorough JJ 16440 18 5 practicable practicable JJ 16440 18 6 treatment treatment NN 16440 18 7 , , , 16440 18 8 these these DT 16440 18 9 waters water NNS 16440 18 10 were be VBD 16440 18 11 still still RB 16440 18 12 so so RB 16440 18 13 bad bad JJ 16440 18 14 that that IN 16440 18 15 they -PRON- PRP 16440 18 16 caused cause VBD 16440 18 17 violent violent JJ 16440 18 18 foaming foaming NN 16440 18 19 , , , 16440 18 20 low low JJ 16440 18 21 steam steam NN 16440 18 22 pressure pressure NN 16440 18 23 , , , 16440 18 24 hard hard RB 16440 18 25 scaling scaling NN 16440 18 26 , , , 16440 18 27 rapid rapid JJ 16440 18 28 destruction destruction NN 16440 18 29 of of IN 16440 18 30 boiler boiler NN 16440 18 31 tubes tube NNS 16440 18 32 , , , 16440 18 33 high high JJ 16440 18 34 coal coal NN 16440 18 35 and and CC 16440 18 36 water water NN 16440 18 37 consumption consumption NN 16440 18 38 , , , 16440 18 39 extraordinary extraordinary JJ 16440 18 40 engine engine NN 16440 18 41 failures failure NNS 16440 18 42 and and CC 16440 18 43 repairs repair NNS 16440 18 44 , , , 16440 18 45 small small JJ 16440 18 46 engine engine NN 16440 18 47 mileage mileage NN 16440 18 48 , , , 16440 18 49 low low JJ 16440 18 50 train train NN 16440 18 51 tonnage tonnage NN 16440 18 52 , , , 16440 18 53 excessive excessive JJ 16440 18 54 overtime overtime NN 16440 18 55 , , , 16440 18 56 and and CC 16440 18 57 a a DT 16440 18 58 demoralized demoralize VBN 16440 18 59 train train NN 16440 18 60 service service NN 16440 18 61 . . . 16440 19 1 [ [ -LRB- 16440 19 2 Footnote Footnote NNP 16440 19 3 A A NNP 16440 19 4 : : : 16440 19 5 Presented present VBN 16440 19 6 at at IN 16440 19 7 the the DT 16440 19 8 meeting meeting NN 16440 19 9 of of IN 16440 19 10 May May NNP 16440 19 11 4th 4th NN 16440 19 12 , , , 16440 19 13 1910 1910 CD 16440 19 14 . . . 16440 19 15 ] ] -RRB- 16440 20 1 TABLE TABLE NNP 16440 20 2 1 1 CD 16440 20 3 . . . 16440 21 1 ---------------------------------------------------------------- ---------------------------------------------------------------- NFP 16440 21 2 | | JJ 16440 21 3 Incrusting Incrusting NNP 16440 21 4 solids solid NNS 16440 21 5 , , , 16440 21 6 in in IN 16440 21 7 | | NNP 16440 21 8 Non non JJ 16440 21 9 - - JJ 16440 21 10 incrusting incrusting JJ 16440 21 11 solids solid NNS 16440 21 12 , , , 16440 21 13 Station Station NNP 16440 21 14 . . . 16440 22 1 | | JJ 16440 22 2 grains grain NNS 16440 22 3 per per IN 16440 22 4 gallon gallon NN 16440 22 5 . . . 16440 23 1 | | VBN 16440 23 2 in in IN 16440 23 3 grains grain NNS 16440 23 4 per per IN 16440 23 5 gallon gallon NN 16440 23 6 . . . 16440 24 1 ---------------------------------------------------------------- ---------------------------------------------------------------- NFP 16440 24 2 Carrizozo Carrizozo NNP 16440 24 3 | | NNP 16440 24 4 31 31 CD 16440 24 5 | | CD 16440 24 6 7 7 CD 16440 24 7 Ancho Ancho NNP 16440 24 8 | | CD 16440 24 9 14 14 CD 16440 24 10 | | CD 16440 24 11 14 14 CD 16440 24 12 Gallinas Gallinas NNP 16440 24 13 | | CD 16440 24 14 91 91 CD 16440 24 15 | | CD 16440 24 16 8 8 CD 16440 24 17 Varney Varney NNP 16440 24 18 | | NNP 16440 24 19 180 180 CD 16440 24 20 | | CD 16440 24 21 14 14 CD 16440 24 22 Duran Duran NNP 16440 24 23 | | NNP 16440 24 24 127 127 CD 16440 24 25 | | CD 16440 24 26 55 55 CD 16440 24 27 Tony Tony NNP 16440 24 28 | | NNP 16440 24 29 115 115 CD 16440 24 30 | | CD 16440 24 31 11 11 CD 16440 24 32 Pastura Pastura NNP 16440 24 33 | | NNP 16440 24 34 141 141 CD 16440 24 35 | | CD 16440 24 36 6 6 CD 16440 24 37 Pintado Pintado NNP 16440 24 38 | | NNP 16440 24 39 81 81 CD 16440 24 40 | | CD 16440 24 41 9 9 CD 16440 24 42 Santa Santa NNP 16440 24 43 Rosa Rosa NNP 16440 24 44 | | NNP 16440 24 45 140 140 CD 16440 24 46 | | CD 16440 24 47 29 29 CD 16440 24 48 ---------------------------------------------------------------- ---------------------------------------------------------------- NFP 16440 24 49 _ _ NNP 16440 24 50 New New NNP 16440 24 51 Water Water NNP 16440 24 52 Supply_.--The Supply_.--The NNP 16440 24 53 writer writer NN 16440 24 54 was be VBD 16440 24 55 directed direct VBN 16440 24 56 to to TO 16440 24 57 find find VB 16440 24 58 , , , 16440 24 59 if if IN 16440 24 60 possible possible JJ 16440 24 61 , , , 16440 24 62 a a DT 16440 24 63 supply supply NN 16440 24 64 of of IN 16440 24 65 good good JJ 16440 24 66 water water NN 16440 24 67 , , , 16440 24 68 and and CC 16440 24 69 his -PRON- PRP$ 16440 24 70 efforts effort NNS 16440 24 71 proved prove VBD 16440 24 72 successful successful JJ 16440 24 73 . . . 16440 25 1 The the DT 16440 25 2 pure pure JJ 16440 25 3 water water NN 16440 25 4 now now RB 16440 25 5 in in IN 16440 25 6 use use NN 16440 25 7 has have VBZ 16440 25 8 eliminated eliminate VBN 16440 25 9 the the DT 16440 25 10 adverse adverse JJ 16440 25 11 conditions condition NNS 16440 25 12 before before IN 16440 25 13 mentioned mention VBN 16440 25 14 ; ; : 16440 25 15 has have VBZ 16440 25 16 improved improve VBN 16440 25 17 the the DT 16440 25 18 _ _ NNP 16440 25 19 esprit esprit FW 16440 25 20 de de FW 16440 25 21 corps corps FW 16440 25 22 _ _ NNP 16440 25 23 of of IN 16440 25 24 the the DT 16440 25 25 train train NN 16440 25 26 service service NN 16440 25 27 ; ; : 16440 25 28 and and CC 16440 25 29 , , , 16440 25 30 in in IN 16440 25 31 a a DT 16440 25 32 short short JJ 16440 25 33 time time NN 16440 25 34 , , , 16440 25 35 the the DT 16440 25 36 reduction reduction NN 16440 25 37 in in IN 16440 25 38 operating operating NN 16440 25 39 expenses expense NNS 16440 25 40 will will MD 16440 25 41 liquidate liquidate VB 16440 25 42 the the DT 16440 25 43 first first JJ 16440 25 44 cost cost NN 16440 25 45 of of IN 16440 25 46 the the DT 16440 25 47 new new JJ 16440 25 48 supply supply NN 16440 25 49 . . . 16440 26 1 This this DT 16440 26 2 supply supply NN 16440 26 3 is be VBZ 16440 26 4 taken take VBN 16440 26 5 from from IN 16440 26 6 the the DT 16440 26 7 South South NNP 16440 26 8 Fork Fork NNP 16440 26 9 of of IN 16440 26 10 Bonito Bonito NNP 16440 26 11 Creek Creek NNP 16440 26 12 , , , 16440 26 13 which which WDT 16440 26 14 flows flow VBZ 16440 26 15 down down IN 16440 26 16 the the DT 16440 26 17 eastern eastern JJ 16440 26 18 slope slope NN 16440 26 19 of of IN 16440 26 20 White White NNP 16440 26 21 Mountain Mountain NNP 16440 26 22 . . . 16440 27 1 The the DT 16440 27 2 latter latter JJ 16440 27 3 is be VBZ 16440 27 4 12,000 12,000 CD 16440 27 5 ft ft NN 16440 27 6 . . . 16440 27 7 high high JJ 16440 27 8 , , , 16440 27 9 and and CC 16440 27 10 is be VBZ 16440 27 11 16 16 CD 16440 27 12 miles mile NNS 16440 27 13 south south RB 16440 27 14 of of IN 16440 27 15 Carrizozo Carrizozo NNP 16440 27 16 ( ( -LRB- 16440 27 17 Fig fig NN 16440 27 18 . . . 16440 28 1 1 1 LS 16440 28 2 ) ) -RRB- 16440 28 3 . . . 16440 29 1 The the DT 16440 29 2 watershed watershed NN 16440 29 3 is be VBZ 16440 29 4 a a DT 16440 29 5 granite granite NN 16440 29 6 and and CC 16440 29 7 porphyry porphyry NN 16440 29 8 formation formation NN 16440 29 9 , , , 16440 29 10 heavily heavily RB 16440 29 11 timbered timbere VBN 16440 29 12 , , , 16440 29 13 and and CC 16440 29 14 the the DT 16440 29 15 stream stream NN 16440 29 16 is be VBZ 16440 29 17 fed feed VBN 16440 29 18 by by IN 16440 29 19 snow snow NN 16440 29 20 and and CC 16440 29 21 rain rain NN 16440 29 22 . . . 16440 30 1 This this DT 16440 30 2 combination combination NN 16440 30 3 yields yield VBZ 16440 30 4 an an DT 16440 30 5 excellent excellent JJ 16440 30 6 water water NN 16440 30 7 , , , 16440 30 8 carrying carry VBG 16440 30 9 on on IN 16440 30 10 an an DT 16440 30 11 average average JJ 16440 30 12 6.05 6.05 CD 16440 30 13 grains grain NNS 16440 30 14 of of IN 16440 30 15 incrusting incrust VBG 16440 30 16 and and CC 16440 30 17 O.95 o.95 CD 16440 30 18 grains grain NNS 16440 30 19 of of IN 16440 30 20 non non JJ 16440 30 21 - - JJ 16440 30 22 incrusting incrusting JJ 16440 30 23 solids solid NNS 16440 30 24 per per IN 16440 30 25 gallon gallon NN 16440 30 26 . . . 16440 31 1 The the DT 16440 31 2 North North NNP 16440 31 3 Fork Fork NNP 16440 31 4 of of IN 16440 31 5 the the DT 16440 31 6 creek creek NN 16440 31 7 carries carry VBZ 16440 31 8 16.60 16.60 CD 16440 31 9 and and CC 16440 31 10 2.40 2.40 CD 16440 31 11 grains grain NNS 16440 31 12 , , , 16440 31 13 respectively respectively RB 16440 31 14 . . . 16440 32 1 Below below IN 16440 32 2 the the DT 16440 32 3 junction junction NN 16440 32 4 of of IN 16440 32 5 these these DT 16440 32 6 forks fork NNS 16440 32 7 , , , 16440 32 8 the the DT 16440 32 9 water water NN 16440 32 10 contains contain VBZ 16440 32 11 10.48 10.48 CD 16440 32 12 grains grain NNS 16440 32 13 of of IN 16440 32 14 incrusting incrust VBG 16440 32 15 and and CC 16440 32 16 1.57 1.57 CD 16440 32 17 grains grain NNS 16440 32 18 of of IN 16440 32 19 non non JJ 16440 32 20 - - JJ 16440 32 21 incrusting incrusting JJ 16440 32 22 solids solid NNS 16440 32 23 per per IN 16440 32 24 gallon gallon NN 16440 32 25 ; ; : 16440 32 26 and and CC 16440 32 27 a a DT 16440 32 28 branch branch NN 16440 32 29 pipe pipe NN 16440 32 30 line line NN 16440 32 31 takes take VBZ 16440 32 32 water water NN 16440 32 33 from from IN 16440 32 34 the the DT 16440 32 35 creek creek NN 16440 32 36 during during IN 16440 32 37 intervals interval NNS 16440 32 38 in in IN 16440 32 39 dry dry JJ 16440 32 40 years year NNS 16440 32 41 when when WRB 16440 32 42 the the DT 16440 32 43 daily daily JJ 16440 32 44 flow flow NN 16440 32 45 of of IN 16440 32 46 the the DT 16440 32 47 South South NNP 16440 32 48 Fork Fork NNP 16440 32 49 is be VBZ 16440 32 50 less less JJR 16440 32 51 than than IN 16440 32 52 the the DT 16440 32 53 consumption consumption NN 16440 32 54 . . . 16440 33 1 _ _ NNP 16440 33 2 The the DT 16440 33 3 Water Water NNP 16440 33 4 Plant_.--The Plant_.--The NNP 16440 33 5 water water NN 16440 33 6 is be VBZ 16440 33 7 taken take VBN 16440 33 8 to to IN 16440 33 9 and and CC 16440 33 10 along along IN 16440 33 11 the the DT 16440 33 12 railway railway NN 16440 33 13 in in IN 16440 33 14 pipe pipe NN 16440 33 15 lines line NNS 16440 33 16 . . . 16440 34 1 The the DT 16440 34 2 system system NN 16440 34 3 includes include VBZ 16440 34 4 116 116 CD 16440 34 5 miles mile NNS 16440 34 6 of of IN 16440 34 7 wood wood NN 16440 34 8 pipe pipe NN 16440 34 9 , , , 16440 34 10 19 19 CD 16440 34 11 miles mile NNS 16440 34 12 of of IN 16440 34 13 iron iron NN 16440 34 14 pipe pipe NN 16440 34 15 , , , 16440 34 16 one one CD 16440 34 17 422,000,000-gal 422,000,000-gal CD 16440 34 18 . . . 16440 35 1 storage storage NN 16440 35 2 reservoir reservoir NNP 16440 35 3 , , , 16440 35 4 four four CD 16440 35 5 2,500,000-gal 2,500,000-gal CD 16440 35 6 . . . 16440 36 1 service service NN 16440 36 2 reservoirs reservoirs NNPS 16440 36 3 , , , 16440 36 4 two two CD 16440 36 5 pumping pump VBG 16440 36 6 plants plant NNS 16440 36 7 in in IN 16440 36 8 duplicate duplicate JJ 16440 36 9 , , , 16440 36 10 and and CC 16440 36 11 accessories accessory NNS 16440 36 12 of of IN 16440 36 13 valves valve NNS 16440 36 14 , , , 16440 36 15 stand stand NN 16440 36 16 - - HYPH 16440 36 17 pipes pipe NNS 16440 36 18 , , , 16440 36 19 etc etc FW 16440 36 20 . . . 16440 37 1 From from IN 16440 37 2 a a DT 16440 37 3 small small JJ 16440 37 4 concrete concrete JJ 16440 37 5 dam dam NN 16440 37 6 across across IN 16440 37 7 the the DT 16440 37 8 creek creek NN 16440 37 9 at at IN 16440 37 10 an an DT 16440 37 11 elevation elevation NN 16440 37 12 of of IN 16440 37 13 7,728 7,728 CD 16440 37 14 ft ft NNP 16440 37 15 . . NNP 16440 37 16 , , , 16440 37 17 the the DT 16440 37 18 pipe pipe NN 16440 37 19 line line NN 16440 37 20 drops drop VBZ 16440 37 21 down down IN 16440 37 22 the the DT 16440 37 23 narrow narrow JJ 16440 37 24 valley valley NNP 16440 37 25 eastward eastward NNP 16440 37 26 , , , 16440 37 27 5 5 CD 16440 37 28 - - SYM 16440 37 29 1/2 1/2 CD 16440 37 30 miles mile NNS 16440 37 31 , , , 16440 37 32 to to IN 16440 37 33 an an DT 16440 37 34 elevation elevation NN 16440 37 35 of of IN 16440 37 36 6,980 6,980 CD 16440 37 37 ft ft NN 16440 37 38 , , , 16440 37 39 where where WRB 16440 37 40 it -PRON- PRP 16440 37 41 turns turn VBZ 16440 37 42 abruptly abruptly RB 16440 37 43 north north JJ 16440 37 44 , , , 16440 37 45 rising rise VBG 16440 37 46 in in IN 16440 37 47 1 1 CD 16440 37 48 mile mile NN 16440 37 49 to to IN 16440 37 50 a a DT 16440 37 51 table table NN 16440 37 52 - - HYPH 16440 37 53 land land NN 16440 37 54 , , , 16440 37 55 7,215 7,215 CD 16440 37 56 ft ft NN 16440 37 57 . . NN 16440 37 58 above above IN 16440 37 59 sea sea NN 16440 37 60 level level NN 16440 37 61 , , , 16440 37 62 across across IN 16440 37 63 which which WDT 16440 37 64 it -PRON- PRP 16440 37 65 continues continue VBZ 16440 37 66 northward northward RB 16440 37 67 5 5 CD 16440 37 68 miles mile NNS 16440 37 69 to to IN 16440 37 70 the the DT 16440 37 71 storage storage NN 16440 37 72 reservoir reservoir NN 16440 37 73 , , , 16440 37 74 which which WDT 16440 37 75 is be VBZ 16440 37 76 on on IN 16440 37 77 the the DT 16440 37 78 north north NN 16440 37 79 edge edge NN 16440 37 80 of of IN 16440 37 81 this this DT 16440 37 82 elevated elevated JJ 16440 37 83 country country NN 16440 37 84 . . . 16440 38 1 Hereafter hereafter RB 16440 38 2 , , , 16440 38 3 this this DT 16440 38 4 reservoir reservoir NN 16440 38 5 will will MD 16440 38 6 be be VB 16440 38 7 called call VBN 16440 38 8 the the DT 16440 38 9 Nogal Nogal NNP 16440 38 10 Reservoir Reservoir NNP 16440 38 11 , , , 16440 38 12 from from IN 16440 38 13 the the DT 16440 38 14 old old JJ 16440 38 15 mining mining NN 16440 38 16 village village NN 16440 38 17 of of IN 16440 38 18 Nogal Nogal NNP 16440 38 19 lying lie VBG 16440 38 20 1 1 CD 16440 38 21 - - SYM 16440 38 22 1/2 1/2 CD 16440 38 23 miles mile NNS 16440 38 24 to to IN 16440 38 25 the the DT 16440 38 26 north north NN 16440 38 27 and and CC 16440 38 28 600 600 CD 16440 38 29 ft ft NN 16440 38 30 . . . 16440 38 31 below below IN 16440 38 32 it -PRON- PRP 16440 38 33 . . . 16440 39 1 From from IN 16440 39 2 this this DT 16440 39 3 reservoir reservoir NN 16440 39 4 , , , 16440 39 5 the the DT 16440 39 6 line line NN 16440 39 7 drops drop VBZ 16440 39 8 abruptly abruptly RB 16440 39 9 to to IN 16440 39 10 the the DT 16440 39 11 Carrizozo Carrizozo NNP 16440 39 12 plain plain JJ 16440 39 13 , , , 16440 39 14 and and CC 16440 39 15 crosses cross VBZ 16440 39 16 the the DT 16440 39 17 latter latter JJ 16440 39 18 northward northward NN 16440 39 19 to to IN 16440 39 20 Coyote Coyote NNP 16440 39 21 , , , 16440 39 22 at at IN 16440 39 23 Mile Mile NNP 16440 39 24 156 156 CD 16440 39 25 , , , 16440 39 26 on on IN 16440 39 27 the the DT 16440 39 28 railway railway NN 16440 39 29 , , , 16440 39 30 at at IN 16440 39 31 an an DT 16440 39 32 elevation elevation NN 16440 39 33 of of IN 16440 39 34 5,810 5,810 CD 16440 39 35 ft ft NN 16440 39 36 . . NNP 16440 39 37 , , , 16440 39 38 passing pass VBG 16440 39 39 , , , 16440 39 40 on on IN 16440 39 41 the the DT 16440 39 42 way way NN 16440 39 43 , , , 16440 39 44 6 6 CD 16440 39 45 miles mile NNS 16440 39 46 east east RB 16440 39 47 of of IN 16440 39 48 Carrizozo Carrizozo NNP 16440 39 49 , , , 16440 39 50 to to TO 16440 39 51 which which WDT 16440 39 52 a a DT 16440 39 53 branch branch NN 16440 39 54 pipe pipe NN 16440 39 55 runs run VBZ 16440 39 56 , , , 16440 39 57 Carrizozo Carrizozo NNP 16440 39 58 being be VBG 16440 39 59 5,430 5,430 CD 16440 39 60 ft ft NN 16440 39 61 . . . 16440 39 62 above above IN 16440 39 63 sea sea NN 16440 39 64 level level NN 16440 39 65 . . . 16440 40 1 There there EX 16440 40 2 is be VBZ 16440 40 3 a a DT 16440 40 4 2,500,000-gal 2,500,000-gal CD 16440 40 5 . . . 16440 41 1 reservoir reservoir NN 16440 41 2 at at IN 16440 41 3 Coyote Coyote NNP 16440 41 4 , , , 16440 41 5 and and CC 16440 41 6 a a DT 16440 41 7 similar similar JJ 16440 41 8 one one NN 16440 41 9 at at IN 16440 41 10 Carrizozo Carrizozo NNP 16440 41 11 . . . 16440 42 1 [ [ -LRB- 16440 42 2 Illustration illustration NN 16440 42 3 : : : 16440 42 4 FIG FIG NNP 16440 42 5 1 1 CD 16440 42 6 . . . 16440 43 1 MAP MAP NNP 16440 43 2 OF of IN 16440 43 3 LINES LINES NNP 16440 43 4 OF of IN 16440 43 5 EL EL NNP 16440 43 6 PASO PASO NNP 16440 43 7 & & CC 16440 43 8 SOUTHWESTERN SOUTHWESTERN NNP 16440 43 9 SYSTEM SYSTEM NNP 16440 43 10 ] ] -RRB- 16440 43 11 This this DT 16440 43 12 describes describe VBZ 16440 43 13 the the DT 16440 43 14 gravity gravity NN 16440 43 15 section section NN 16440 43 16 of of IN 16440 43 17 the the DT 16440 43 18 line line NN 16440 43 19 which which WDT 16440 43 20 brings bring VBZ 16440 43 21 the the DT 16440 43 22 water water NN 16440 43 23 from from IN 16440 43 24 the the DT 16440 43 25 mountain mountain NN 16440 43 26 stream stream NN 16440 43 27 to to IN 16440 43 28 the the DT 16440 43 29 railway railway NN 16440 43 30 . . . 16440 44 1 From from IN 16440 44 2 Nogal Nogal NNP 16440 44 3 Reservoir Reservoir NNP 16440 44 4 to to IN 16440 44 5 the the DT 16440 44 6 latter latter JJ 16440 44 7 , , , 16440 44 8 the the DT 16440 44 9 capacity capacity NN 16440 44 10 of of IN 16440 44 11 the the DT 16440 44 12 pipe pipe NN 16440 44 13 is be VBZ 16440 44 14 equal equal JJ 16440 44 15 to to IN 16440 44 16 the the DT 16440 44 17 future future JJ 16440 44 18 daily daily JJ 16440 44 19 requirements requirement NNS 16440 44 20 ; ; : 16440 44 21 from from IN 16440 44 22 the the DT 16440 44 23 source source NN 16440 44 24 of of IN 16440 44 25 supply supply NN 16440 44 26 to to IN 16440 44 27 the the DT 16440 44 28 reservoir reservoir NN 16440 44 29 , , , 16440 44 30 the the DT 16440 44 31 pipe pipe NN 16440 44 32 has have VBZ 16440 44 33 twice twice RB 16440 44 34 as as RB 16440 44 35 great great JJ 16440 44 36 a a DT 16440 44 37 capacity capacity NN 16440 44 38 , , , 16440 44 39 thereby thereby RB 16440 44 40 storing store VBG 16440 44 41 surplus surplus NN 16440 44 42 water water NN 16440 44 43 . . . 16440 45 1 This this DT 16440 45 2 section section NN 16440 45 3 is be VBZ 16440 45 4 32 32 CD 16440 45 5 miles mile NNS 16440 45 6 long long JJ 16440 45 7 , , , 16440 45 8 with with IN 16440 45 9 a a DT 16440 45 10 6-mile 6-mile CD 16440 45 11 branch branch NN 16440 45 12 line line NN 16440 45 13 . . . 16440 46 1 The the DT 16440 46 2 second second JJ 16440 46 3 , , , 16440 46 4 or or CC 16440 46 5 pumping pump VBG 16440 46 6 section section NN 16440 46 7 , , , 16440 46 8 extends extend VBZ 16440 46 9 eastward eastward RB 16440 46 10 along along IN 16440 46 11 the the DT 16440 46 12 railway railway NN 16440 46 13 , , , 16440 46 14 rising rise VBG 16440 46 15 from from IN 16440 46 16 an an DT 16440 46 17 elevation elevation NN 16440 46 18 of of IN 16440 46 19 5,810 5,810 CD 16440 46 20 ft ft NN 16440 46 21 . . . 16440 46 22 at at IN 16440 46 23 Coyote Coyote NNP 16440 46 24 to to IN 16440 46 25 6,750 6,750 CD 16440 46 26 ft ft NN 16440 46 27 . . NN 16440 46 28 on on IN 16440 46 29 the the DT 16440 46 30 Corona Corona NNP 16440 46 31 summit summit NN 16440 46 32 , , , 16440 46 33 which which WDT 16440 46 34 is be VBZ 16440 46 35 the the DT 16440 46 36 water water NN 16440 46 37 - - HYPH 16440 46 38 shed shed VBN 16440 46 39 line line NN 16440 46 40 between between IN 16440 46 41 the the DT 16440 46 42 Rio Rio NNP 16440 46 43 Grande Grande NNP 16440 46 44 on on IN 16440 46 45 the the DT 16440 46 46 west west NN 16440 46 47 and and CC 16440 46 48 the the DT 16440 46 49 Rio Rio NNP 16440 46 50 Pecos Pecos NNP 16440 46 51 on on IN 16440 46 52 the the DT 16440 46 53 east east NN 16440 46 54 . . . 16440 47 1 At at IN 16440 47 2 Coyote Coyote NNP 16440 47 3 a a DT 16440 47 4 pumping pumping NN 16440 47 5 station station NN 16440 47 6 lifts lift VBZ 16440 47 7 the the DT 16440 47 8 water water NN 16440 47 9 to to IN 16440 47 10 Luna Luna NNP 16440 47 11 Reservoir Reservoir NNP 16440 47 12 and and CC 16440 47 13 the the DT 16440 47 14 pumps pump NNS 16440 47 15 at at IN 16440 47 16 Mile Mile NNP 16440 47 17 171 171 CD 16440 47 18 , , , 16440 47 19 and and CC 16440 47 20 the the DT 16440 47 21 latter latter JJ 16440 47 22 lift lift NN 16440 47 23 it -PRON- PRP 16440 47 24 to to IN 16440 47 25 the the DT 16440 47 26 reservoir reservoir NN 16440 47 27 on on IN 16440 47 28 Corona Corona NNP 16440 47 29 summit summit NN 16440 47 30 at at IN 16440 47 31 Mile Mile NNP 16440 47 32 192 192 CD 16440 47 33 - - SYM 16440 47 34 1/2 1/2 CD 16440 47 35 . . . 16440 48 1 This this DT 16440 48 2 section section NN 16440 48 3 is be VBZ 16440 48 4 36 36 CD 16440 48 5 - - SYM 16440 48 6 1/2 1/2 CD 16440 48 7 miles mile NNS 16440 48 8 long long JJ 16440 48 9 . . . 16440 49 1 The the DT 16440 49 2 third third JJ 16440 49 3 , , , 16440 49 4 or or CC 16440 49 5 gravity gravity NN 16440 49 6 section section NN 16440 49 7 , , , 16440 49 8 extends extend VBZ 16440 49 9 from from IN 16440 49 10 the the DT 16440 49 11 reservoir reservoir NN 16440 49 12 on on IN 16440 49 13 the the DT 16440 49 14 Corona Corona NNP 16440 49 15 summit summit NN 16440 49 16 to to IN 16440 49 17 the the DT 16440 49 18 Rio Rio NNP 16440 49 19 Pecos Pecos NNP 16440 49 20 at at IN 16440 49 21 Mile Mile NNP 16440 49 22 272 272 CD 16440 49 23 , , , 16440 49 24 dropping drop VBG 16440 49 25 from from IN 16440 49 26 an an DT 16440 49 27 elevation elevation NN 16440 49 28 of of IN 16440 49 29 6,750 6,750 CD 16440 49 30 to to IN 16440 49 31 4,570 4,570 CD 16440 49 32 ft ft NN 16440 49 33 . . NNP 16440 49 34 in in IN 16440 49 35 80 80 CD 16440 49 36 miles mile NNS 16440 49 37 . . . 16440 50 1 The the DT 16440 50 2 pipe pipe NN 16440 50 3 line line NN 16440 50 4 extends extend VBZ 16440 50 5 to to IN 16440 50 6 Pastura Pastura NNP 16440 50 7 , , , 16440 50 8 58 58 CD 16440 50 9 - - SYM 16440 50 10 1/2 1/2 CD 16440 50 11 miles mile NNS 16440 50 12 from from IN 16440 50 13 Corona Corona NNP 16440 50 14 , , , 16440 50 15 as as IN 16440 50 16 shown show VBN 16440 50 17 on on IN 16440 50 18 Plate Plate NNP 16440 50 19 V. V. NNP 16440 50 20 Where where WRB 16440 50 21 the the DT 16440 50 22 pipe pipe NN 16440 50 23 line line NN 16440 50 24 passes pass VBZ 16440 50 25 a a DT 16440 50 26 water water NN 16440 50 27 tank tank NN 16440 50 28 on on IN 16440 50 29 the the DT 16440 50 30 railway railway NN 16440 50 31 , , , 16440 50 32 a a DT 16440 50 33 4-in 4-in NN 16440 50 34 . . . 16440 51 1 branch branch NN 16440 51 2 pipe pipe NN 16440 51 3 is be VBZ 16440 51 4 carried carry VBN 16440 51 5 to to IN 16440 51 6 the the DT 16440 51 7 bottom bottom NN 16440 51 8 of of IN 16440 51 9 the the DT 16440 51 10 tank tank NN 16440 51 11 and and CC 16440 51 12 up up IN 16440 51 13 to to IN 16440 51 14 the the DT 16440 51 15 top top NN 16440 51 16 , , , 16440 51 17 where where WRB 16440 51 18 it -PRON- PRP 16440 51 19 is be VBZ 16440 51 20 capped cap VBN 16440 51 21 by by IN 16440 51 22 an an DT 16440 51 23 automatic automatic JJ 16440 51 24 valve valve NN 16440 51 25 . . . 16440 52 1 A a DT 16440 52 2 gate gate NN 16440 52 3 - - HYPH 16440 52 4 valve valve NN 16440 52 5 is be VBZ 16440 52 6 placed place VBN 16440 52 7 in in IN 16440 52 8 the the DT 16440 52 9 branch branch NN 16440 52 10 pipe pipe NN 16440 52 11 at at IN 16440 52 12 its -PRON- PRP$ 16440 52 13 junction junction NN 16440 52 14 with with IN 16440 52 15 the the DT 16440 52 16 pipe pipe NN 16440 52 17 line line NN 16440 52 18 . . . 16440 53 1 There there EX 16440 53 2 are be VBP 16440 53 3 regulating regulate VBG 16440 53 4 , , , 16440 53 5 relief relief NN 16440 53 6 , , , 16440 53 7 check check VB 16440 53 8 , , , 16440 53 9 blow blow NN 16440 53 10 - - HYPH 16440 53 11 off off NN 16440 53 12 , , , 16440 53 13 and and CC 16440 53 14 air air NN 16440 53 15 - - HYPH 16440 53 16 valves valve NNS 16440 53 17 , , , 16440 53 18 air air NN 16440 53 19 - - HYPH 16440 53 20 chambers chamber NNS 16440 53 21 , , , 16440 53 22 and and CC 16440 53 23 open open JJ 16440 53 24 stand stand NN 16440 53 25 - - HYPH 16440 53 26 pipes pipe NNS 16440 53 27 on on IN 16440 53 28 the the DT 16440 53 29 line line NN 16440 53 30 , , , 16440 53 31 too too RB 16440 53 32 numerous numerous JJ 16440 53 33 to to TO 16440 53 34 mention mention VB 16440 53 35 in in IN 16440 53 36 detail detail NN 16440 53 37 . . . 16440 54 1 They -PRON- PRP 16440 54 2 are be VBP 16440 54 3 designed design VBN 16440 54 4 to to TO 16440 54 5 keep keep VB 16440 54 6 the the DT 16440 54 7 wood wood NN 16440 54 8 pipe pipe NN 16440 54 9 full full JJ 16440 54 10 , , , 16440 54 11 regulate regulate JJ 16440 54 12 flow flow NN 16440 54 13 , , , 16440 54 14 prevent prevent VBP 16440 54 15 accumulation accumulation NN 16440 54 16 of of IN 16440 54 17 pressure pressure NN 16440 54 18 and and CC 16440 54 19 water water NN 16440 54 20 - - HYPH 16440 54 21 hammer hammer NN 16440 54 22 , , , 16440 54 23 and and CC 16440 54 24 remove remove VB 16440 54 25 sediment sediment NN 16440 54 26 . . . 16440 55 1 _ _ NNP 16440 55 2 Water Water NNP 16440 55 3 Pipe_.--A Pipe_.--A NNP 16440 55 4 study study NN 16440 55 5 of of IN 16440 55 6 the the DT 16440 55 7 profile profile NN 16440 55 8 developed develop VBD 16440 55 9 a a DT 16440 55 10 system system NN 16440 55 11 of of IN 16440 55 12 hydraulic hydraulic JJ 16440 55 13 grades grade NNS 16440 55 14 , , , 16440 55 15 pipe pipe NN 16440 55 16 diameters diameter NNS 16440 55 17 , , , 16440 55 18 and and CC 16440 55 19 open open JJ 16440 55 20 stand stand NN 16440 55 21 - - HYPH 16440 55 22 pipes pipe NNS 16440 55 23 limiting limit VBG 16440 55 24 the the DT 16440 55 25 pressure pressure NN 16440 55 26 to to IN 16440 55 27 130 130 CD 16440 55 28 lb lb RB 16440 55 29 . . . 16440 56 1 per per IN 16440 56 2 sq sq NNP 16440 56 3 . . . 16440 57 1 in in IN 16440 57 2 . . NNP 16440 57 3 , , , 16440 57 4 except except IN 16440 57 5 on on IN 16440 57 6 19 19 CD 16440 57 7 miles mile NNS 16440 57 8 of of IN 16440 57 9 the the DT 16440 57 10 pump pump NN 16440 57 11 main main JJ 16440 57 12 between between IN 16440 57 13 Coyote Coyote NNP 16440 57 14 and and CC 16440 57 15 Corona Corona NNP 16440 57 16 where where WRB 16440 57 17 the the DT 16440 57 18 estimated estimate VBN 16440 57 19 maximum maximum JJ 16440 57 20 pressure pressure NN 16440 57 21 is be VBZ 16440 57 22 310 310 CD 16440 57 23 lb lb NN 16440 57 24 . . . 16440 58 1 Investigation investigation NN 16440 58 2 justified justify VBD 16440 58 3 the the DT 16440 58 4 assumption assumption NN 16440 58 5 that that IN 16440 58 6 wood wood NN 16440 58 7 pipe pipe NN 16440 58 8 under under IN 16440 58 9 a a DT 16440 58 10 pressure pressure NN 16440 58 11 of of IN 16440 58 12 130 130 CD 16440 58 13 lb lb NN 16440 58 14 . . . 16440 59 1 would would MD 16440 59 2 give give VB 16440 59 3 satisfactory satisfactory JJ 16440 59 4 service service NN 16440 59 5 for for IN 16440 59 6 25 25 CD 16440 59 7 years year NNS 16440 59 8 , , , 16440 59 9 on on IN 16440 59 10 which which WDT 16440 59 11 basis basis NN 16440 59 12 it -PRON- PRP 16440 59 13 would would MD 16440 59 14 be be VB 16440 59 15 less less RBR 16440 59 16 expensive expensive JJ 16440 59 17 than than IN 16440 59 18 cast cast VBN 16440 59 19 iron iron NN 16440 59 20 , , , 16440 59 21 and and CC 16440 59 22 therefore therefore RB 16440 59 23 it -PRON- PRP 16440 59 24 was be VBD 16440 59 25 used use VBN 16440 59 26 . . . 16440 60 1 Cast Cast VBN 16440 60 2 iron iron NN 16440 60 3 was be VBD 16440 60 4 considered consider VBN 16440 60 5 preferable preferable JJ 16440 60 6 to to IN 16440 60 7 steel steel NN 16440 60 8 for for IN 16440 60 9 pressures pressure NNS 16440 60 10 not not RB 16440 60 11 exceeding exceed VBG 16440 60 12 310 310 CD 16440 60 13 lb lb IN 16440 60 14 . . . 16440 61 1 on on IN 16440 61 2 account account NN 16440 61 3 of of IN 16440 61 4 its -PRON- PRP$ 16440 61 5 greater great JJR 16440 61 6 durability durability NN 16440 61 7 . . . 16440 62 1 _ _ NNP 16440 62 2 Wood Wood NNP 16440 62 3 Pipe_.--Machine Pipe_.--Machine NNP 16440 62 4 - - HYPH 16440 62 5 made make VBN 16440 62 6 , , , 16440 62 7 spirally spirally RB 16440 62 8 - - HYPH 16440 62 9 wound wound NN 16440 62 10 , , , 16440 62 11 wood wood NN 16440 62 12 - - HYPH 16440 62 13 stave stave NN 16440 62 14 pipe pipe NN 16440 62 15 , , , 16440 62 16 made make VBN 16440 62 17 in in IN 16440 62 18 sections section NNS 16440 62 19 from from IN 16440 62 20 8 8 CD 16440 62 21 to to TO 16440 62 22 12 12 CD 16440 62 23 ft ft NN 16440 62 24 . . NN 16440 62 25 long long RB 16440 62 26 , , , 16440 62 27 with with IN 16440 62 28 the the DT 16440 62 29 exterior exterior JJ 16440 62 30 surface surface NN 16440 62 31 covered cover VBN 16440 62 32 with with IN 16440 62 33 a a DT 16440 62 34 heavy heavy JJ 16440 62 35 coat coat NN 16440 62 36 of of IN 16440 62 37 asphalt asphalt NN 16440 62 38 , , , 16440 62 39 was be VBD 16440 62 40 selected select VBN 16440 62 41 in in IN 16440 62 42 preference preference NN 16440 62 43 to to IN 16440 62 44 unprotected unprotected JJ 16440 62 45 , , , 16440 62 46 continuous continuous JJ 16440 62 47 , , , 16440 62 48 stave stave JJ 16440 62 49 pipe pipe NN 16440 62 50 . . . 16440 63 1 The the DT 16440 63 2 diameters diameter NNS 16440 63 3 were be VBD 16440 63 4 not not RB 16440 63 5 so so RB 16440 63 6 great great JJ 16440 63 7 as as IN 16440 63 8 to to TO 16440 63 9 require require VB 16440 63 10 the the DT 16440 63 11 latter latter JJ 16440 63 12 . . . 16440 64 1 The the DT 16440 64 2 first first JJ 16440 64 3 40 40 CD 16440 64 4 miles mile NNS 16440 64 5 of of IN 16440 64 6 wood wood NN 16440 64 7 pipe pipe NN 16440 64 8 was be VBD 16440 64 9 furnished furnish VBN 16440 64 10 by by IN 16440 64 11 the the DT 16440 64 12 Wykoff Wykoff NNP 16440 64 13 Wood Wood NNP 16440 64 14 Pipe Pipe NNP 16440 64 15 Company Company NNP 16440 64 16 , , , 16440 64 17 of of IN 16440 64 18 Elmira Elmira NNP 16440 64 19 , , , 16440 64 20 N.Y. New York NNP 16440 64 21 , , , 16440 64 22 and and CC 16440 64 23 the the DT 16440 64 24 Michigan Michigan NNP 16440 64 25 Pipe Pipe NNP 16440 64 26 Company Company NNP 16440 64 27 , , , 16440 64 28 of of IN 16440 64 29 Bay Bay NNP 16440 64 30 City City NNP 16440 64 31 , , , 16440 64 32 Mich. Michigan NNP 16440 64 33 , , , 16440 64 34 delivered deliver VBD 16440 64 35 the the DT 16440 64 36 remaining remain VBG 16440 64 37 76 76 CD 16440 64 38 miles mile NNS 16440 64 39 . . . 16440 65 1 The the DT 16440 65 2 pipe pipe NN 16440 65 3 is be VBZ 16440 65 4 wound wind VBN 16440 65 5 with with IN 16440 65 6 flat flat JJ 16440 65 7 steel steel NN 16440 65 8 bands band NNS 16440 65 9 of of IN 16440 65 10 from from IN 16440 65 11 14 14 CD 16440 65 12 to to TO 16440 65 13 18 18 CD 16440 65 14 gauge gauge NN 16440 65 15 and and CC 16440 65 16 from from IN 16440 65 17 1 1 CD 16440 65 18 to to IN 16440 65 19 2 2 CD 16440 65 20 in in IN 16440 65 21 . . . 16440 66 1 wide wide JJ 16440 66 2 . . . 16440 67 1 The the DT 16440 67 2 machine machine NN 16440 67 3 winds wind VBZ 16440 67 4 at at IN 16440 67 5 any any DT 16440 67 6 desired desire VBN 16440 67 7 pitch pitch NN 16440 67 8 and and CC 16440 67 9 tension tension NN 16440 67 10 . . . 16440 68 1 At at IN 16440 68 2 each each DT 16440 68 3 end end NN 16440 68 4 the the DT 16440 68 5 spiral spiral JJ 16440 68 6 wind wind NN 16440 68 7 is be VBZ 16440 68 8 doubled double VBN 16440 68 9 two two CD 16440 68 10 turns turn NNS 16440 68 11 , , , 16440 68 12 the the DT 16440 68 13 second second JJ 16440 68 14 lying lying NN 16440 68 15 over over IN 16440 68 16 the the DT 16440 68 17 first first JJ 16440 68 18 and and CC 16440 68 19 developing develop VBG 16440 68 20 a a DT 16440 68 21 frictional frictional JJ 16440 68 22 resistance resistance NN 16440 68 23 similar similar JJ 16440 68 24 to to IN 16440 68 25 that that DT 16440 68 26 of of IN 16440 68 27 a a DT 16440 68 28 double double JJ 16440 68 29 hitch hitch NN 16440 68 30 of of IN 16440 68 31 a a DT 16440 68 32 rope rope NN 16440 68 33 around around IN 16440 68 34 a a DT 16440 68 35 post post NN 16440 68 36 . . . 16440 69 1 The the DT 16440 69 2 ends end NNS 16440 69 3 of of IN 16440 69 4 the the DT 16440 69 5 band band NN 16440 69 6 are be VBP 16440 69 7 held hold VBN 16440 69 8 by by IN 16440 69 9 screw screw NN 16440 69 10 nails nail NNS 16440 69 11 or or CC 16440 69 12 a a DT 16440 69 13 forged forge VBN 16440 69 14 clip clip NN 16440 69 15 , , , 16440 69 16 the the DT 16440 69 17 latter latter JJ 16440 69 18 being be VBG 16440 69 19 the the DT 16440 69 20 better well JJR 16440 69 21 . . . 16440 70 1 It -PRON- PRP 16440 70 2 has have VBZ 16440 70 3 two two CD 16440 70 4 or or CC 16440 70 5 three three CD 16440 70 6 spikes spike NNS 16440 70 7 on on IN 16440 70 8 the the DT 16440 70 9 under under JJ 16440 70 10 side side NN 16440 70 11 which which WDT 16440 70 12 seat seat NN 16440 70 13 into into IN 16440 70 14 the the DT 16440 70 15 stave stave NN 16440 70 16 , , , 16440 70 17 and and CC 16440 70 18 two two CD 16440 70 19 side side NN 16440 70 20 lugs lug NNS 16440 70 21 on on IN 16440 70 22 top top NN 16440 70 23 which which WDT 16440 70 24 turn turn VBP 16440 70 25 down down RP 16440 70 26 over over IN 16440 70 27 the the DT 16440 70 28 band band NN 16440 70 29 . . . 16440 71 1 The the DT 16440 71 2 latter latter JJ 16440 71 3 passes pass VBZ 16440 71 4 twice twice RB 16440 71 5 over over IN 16440 71 6 the the DT 16440 71 7 seat seat NN 16440 71 8 on on IN 16440 71 9 the the DT 16440 71 10 clip clip NN 16440 71 11 , , , 16440 71 12 the the DT 16440 71 13 first first JJ 16440 71 14 turn turn NN 16440 71 15 holding hold VBG 16440 71 16 the the DT 16440 71 17 clip clip NN 16440 71 18 to to IN 16440 71 19 the the DT 16440 71 20 stave stave NN 16440 71 21 , , , 16440 71 22 while while IN 16440 71 23 the the DT 16440 71 24 second second JJ 16440 71 25 turn turn NN 16440 71 26 is be VBZ 16440 71 27 held hold VBN 16440 71 28 by by IN 16440 71 29 the the DT 16440 71 30 lugs lug NNS 16440 71 31 which which WDT 16440 71 32 are be VBP 16440 71 33 hammered hammer VBN 16440 71 34 down down RP 16440 71 35 over over IN 16440 71 36 it -PRON- PRP 16440 71 37 . . . 16440 72 1 The the DT 16440 72 2 end end NN 16440 72 3 of of IN 16440 72 4 the the DT 16440 72 5 band band NN 16440 72 6 is be VBZ 16440 72 7 then then RB 16440 72 8 turned turn VBN 16440 72 9 back back RB 16440 72 10 over over IN 16440 72 11 the the DT 16440 72 12 clip clip NN 16440 72 13 and and CC 16440 72 14 held hold VBN 16440 72 15 down down RP 16440 72 16 by by IN 16440 72 17 a a DT 16440 72 18 staple staple NN 16440 72 19 . . . 16440 73 1 The the DT 16440 73 2 staves stave NNS 16440 73 3 are be VBP 16440 73 4 double double RB 16440 73 5 - - HYPH 16440 73 6 tongued tongued JJ 16440 73 7 and and CC 16440 73 8 grooved groove VBN 16440 73 9 and and CC 16440 73 10 from from IN 16440 73 11 1 1 CD 16440 73 12 - - SYM 16440 73 13 3/8 3/8 CD 16440 73 14 to to IN 16440 73 15 2 2 CD 16440 73 16 in in IN 16440 73 17 . . . 16440 74 1 thick thick JJ 16440 74 2 . . . 16440 75 1 The the DT 16440 75 2 smaller small JJR 16440 75 3 thickness thickness NN 16440 75 4 is be VBZ 16440 75 5 sufficient sufficient JJ 16440 75 6 . . . 16440 76 1 The the DT 16440 76 2 exterior exterior JJ 16440 76 3 face face NN 16440 76 4 of of IN 16440 76 5 the the DT 16440 76 6 staves stave NNS 16440 76 7 should should MD 16440 76 8 be be VB 16440 76 9 turned turn VBN 16440 76 10 concentric concentric JJ 16440 76 11 with with IN 16440 76 12 the the DT 16440 76 13 axis axis NN 16440 76 14 of of IN 16440 76 15 the the DT 16440 76 16 pipe pipe NN 16440 76 17 and and CC 16440 76 18 form form VB 16440 76 19 a a DT 16440 76 20 circle circle NN 16440 76 21 , , , 16440 76 22 so so IN 16440 76 23 that that IN 16440 76 24 the the DT 16440 76 25 band band NN 16440 76 26 will will MD 16440 76 27 have have VB 16440 76 28 perfect perfect JJ 16440 76 29 contact contact NN 16440 76 30 with with IN 16440 76 31 the the DT 16440 76 32 wood wood NN 16440 76 33 . . . 16440 77 1 The the DT 16440 77 2 joints joint NNS 16440 77 3 are be VBP 16440 77 4 formed form VBN 16440 77 5 by by IN 16440 77 6 turning turn VBG 16440 77 7 a a DT 16440 77 8 chamber chamber NN 16440 77 9 in in IN 16440 77 10 one one CD 16440 77 11 end end NN 16440 77 12 of of IN 16440 77 13 the the DT 16440 77 14 pipe pipe NN 16440 77 15 and and CC 16440 77 16 a a DT 16440 77 17 tenon tenon NN 16440 77 18 on on IN 16440 77 19 the the DT 16440 77 20 other other JJ 16440 77 21 , , , 16440 77 22 or or CC 16440 77 23 both both DT 16440 77 24 ends end NNS 16440 77 25 are be VBP 16440 77 26 turned turn VBN 16440 77 27 to to IN 16440 77 28 a a DT 16440 77 29 true true JJ 16440 77 30 exterior exterior NNP 16440 77 31 circle circle NN 16440 77 32 and and CC 16440 77 33 driven drive VBN 16440 77 34 into into IN 16440 77 35 a a DT 16440 77 36 wood wood NN 16440 77 37 or or CC 16440 77 38 steel steel NN 16440 77 39 sleeve sleeve NN 16440 77 40 . . . 16440 78 1 The the DT 16440 78 2 chamber chamber NN 16440 78 3 and and CC 16440 78 4 tenon tenon NNP 16440 78 5 were be VBD 16440 78 6 used use VBN 16440 78 7 in in IN 16440 78 8 this this DT 16440 78 9 work work NN 16440 78 10 . . . 16440 79 1 Finally finally RB 16440 79 2 , , , 16440 79 3 each each DT 16440 79 4 piece piece NN 16440 79 5 of of IN 16440 79 6 pipe pipe NN 16440 79 7 is be VBZ 16440 79 8 covered cover VBN 16440 79 9 with with IN 16440 79 10 as as RB 16440 79 11 much much JJ 16440 79 12 hot hot JJ 16440 79 13 asphalt asphalt NN 16440 79 14 as as IN 16440 79 15 it -PRON- PRP 16440 79 16 will will MD 16440 79 17 carry carry VB 16440 79 18 . . . 16440 80 1 _ _ NNP 16440 80 2 Steel Steel NNP 16440 80 3 Bands_.--The Bands_.--The NNP 16440 80 4 specifications specification NNS 16440 80 5 required require VBD 16440 80 6 bands band NNS 16440 80 7 of of IN 16440 80 8 mild mild JJ 16440 80 9 steel steel NN 16440 80 10 , , , 16440 80 11 of of IN 16440 80 12 60,000 60,000 CD 16440 80 13 lb lb RB 16440 80 14 . . . 16440 81 1 strength strength NN 16440 81 2 , , , 16440 81 3 with with IN 16440 81 4 an an DT 16440 81 5 elastic elastic JJ 16440 81 6 limit limit NN 16440 81 7 half half NN 16440 81 8 as as RB 16440 81 9 great great JJ 16440 81 10 . . . 16440 82 1 The the DT 16440 82 2 winding winding NN 16440 82 3 was be VBD 16440 82 4 spaced space VBN 16440 82 5 to to TO 16440 82 6 limit limit VB 16440 82 7 the the DT 16440 82 8 tension tension NN 16440 82 9 to to IN 16440 82 10 15,000 15,000 CD 16440 82 11 lb lb RB 16440 82 12 . . . 16440 83 1 per per IN 16440 83 2 sq sq NNP 16440 83 3 . . . 16440 84 1 in in IN 16440 84 2 . . . 16440 85 1 If if IN 16440 85 2 severe severe JJ 16440 85 3 water water NN 16440 85 4 - - HYPH 16440 85 5 hammer hammer NN 16440 85 6 is be VBZ 16440 85 7 present present JJ 16440 85 8 , , , 16440 85 9 the the DT 16440 85 10 ordinary ordinary JJ 16440 85 11 working work VBG 16440 85 12 stress stress NN 16440 85 13 should should MD 16440 85 14 be be VB 16440 85 15 materially materially RB 16440 85 16 less less JJR 16440 85 17 than than IN 16440 85 18 the the DT 16440 85 19 latter latter JJ 16440 85 20 , , , 16440 85 21 otherwise otherwise RB 16440 85 22 the the DT 16440 85 23 spiral spiral JJ 16440 85 24 bands band NNS 16440 85 25 will will MD 16440 85 26 stretch stretch VB 16440 85 27 enough enough RB 16440 85 28 to to TO 16440 85 29 permit permit VB 16440 85 30 the the DT 16440 85 31 water water NN 16440 85 32 to to TO 16440 85 33 spurt spurt VB 16440 85 34 out out RP 16440 85 35 between between IN 16440 85 36 the the DT 16440 85 37 staves stave NNS 16440 85 38 . . . 16440 86 1 This this DT 16440 86 2 was be VBD 16440 86 3 determined determined JJ 16440 86 4 to to TO 16440 86 5 be be VB 16440 86 6 true true JJ 16440 86 7 on on IN 16440 86 8 4,500 4,500 CD 16440 86 9 ft ft NN 16440 86 10 . . NN 16440 86 11 of of IN 16440 86 12 12-in 12-in CD 16440 86 13 . . . 16440 87 1 pipe pipe NN 16440 87 2 connecting connect VBG 16440 87 3 the the DT 16440 87 4 Carrizozo Carrizozo NNP 16440 87 5 Reservoir Reservoir NNP 16440 87 6 with with IN 16440 87 7 a a DT 16440 87 8 water water NN 16440 87 9 column column NN 16440 87 10 at at IN 16440 87 11 the the DT 16440 87 12 roundhouse roundhouse NN 16440 87 13 there there RB 16440 87 14 . . . 16440 88 1 In in IN 16440 88 2 pumping pump VBG 16440 88 3 tests test NNS 16440 88 4 at at IN 16440 88 5 the the DT 16440 88 6 mills mill NNS 16440 88 7 , , , 16440 88 8 attempts attempt NNS 16440 88 9 were be VBD 16440 88 10 made make VBN 16440 88 11 , , , 16440 88 12 at at IN 16440 88 13 various various JJ 16440 88 14 times time NNS 16440 88 15 , , , 16440 88 16 to to TO 16440 88 17 burst burst VB 16440 88 18 the the DT 16440 88 19 pipe pipe NN 16440 88 20 , , , 16440 88 21 but but CC 16440 88 22 they -PRON- PRP 16440 88 23 never never RB 16440 88 24 succeeded succeed VBD 16440 88 25 . . . 16440 89 1 Before before IN 16440 89 2 the the DT 16440 89 3 elastic elastic JJ 16440 89 4 limit limit NN 16440 89 5 was be VBD 16440 89 6 exceeded exceed VBN 16440 89 7 , , , 16440 89 8 the the DT 16440 89 9 water water NN 16440 89 10 was be VBD 16440 89 11 running run VBG 16440 89 12 out out RB 16440 89 13 between between IN 16440 89 14 the the DT 16440 89 15 staves stave NNS 16440 89 16 as as RB 16440 89 17 fast fast RB 16440 89 18 as as IN 16440 89 19 the the DT 16440 89 20 pump pump NN 16440 89 21 forced force VBD 16440 89 22 it -PRON- PRP 16440 89 23 in in RP 16440 89 24 . . . 16440 90 1 On on IN 16440 90 2 the the DT 16440 90 3 following follow VBG 16440 90 4 day day NN 16440 90 5 , , , 16440 90 6 pipe pipe NN 16440 90 7 thus thus RB 16440 90 8 tested test VBN 16440 90 9 would would MD 16440 90 10 carry carry VB 16440 90 11 the the DT 16440 90 12 pressure pressure NN 16440 90 13 for for IN 16440 90 14 which which WDT 16440 90 15 it -PRON- PRP 16440 90 16 was be VBD 16440 90 17 designed design VBN 16440 90 18 without without IN 16440 90 19 leaking leak VBG 16440 90 20 . . . 16440 91 1 Except except IN 16440 91 2 for for IN 16440 91 3 defects defect NNS 16440 91 4 in in IN 16440 91 5 the the DT 16440 91 6 band band NN 16440 91 7 , , , 16440 91 8 pipe pipe NN 16440 91 9 of of IN 16440 91 10 this this DT 16440 91 11 kind kind NN 16440 91 12 will will MD 16440 91 13 not not RB 16440 91 14 burst burst VB 16440 91 15 in in IN 16440 91 16 the the DT 16440 91 17 service service NN 16440 91 18 for for IN 16440 91 19 which which WDT 16440 91 20 it -PRON- PRP 16440 91 21 is be VBZ 16440 91 22 properly properly RB 16440 91 23 designed design VBN 16440 91 24 . . . 16440 92 1 This this DT 16440 92 2 is be VBZ 16440 92 3 true true JJ 16440 92 4 , , , 16440 92 5 without without IN 16440 92 6 exception exception NN 16440 92 7 , , , 16440 92 8 of of IN 16440 92 9 the the DT 16440 92 10 100,000 100,000 CD 16440 92 11 pieces piece NNS 16440 92 12 of of IN 16440 92 13 pipe pipe NN 16440 92 14 in in IN 16440 92 15 this this DT 16440 92 16 service service NN 16440 92 17 . . . 16440 93 1 There there EX 16440 93 2 has have VBZ 16440 93 3 been be VBN 16440 93 4 some some DT 16440 93 5 trouble trouble NN 16440 93 6 with with IN 16440 93 7 a a DT 16440 93 8 number number NN 16440 93 9 of of IN 16440 93 10 the the DT 16440 93 11 riveted riveted JJ 16440 93 12 splices splice NNS 16440 93 13 on on IN 16440 93 14 the the DT 16440 93 15 banding banding NN 16440 93 16 . . . 16440 94 1 Such such PDT 16440 94 2 a a DT 16440 94 3 splice splice NN 16440 94 4 occurs occur VBZ 16440 94 5 for for IN 16440 94 6 every every DT 16440 94 7 spool spool NN 16440 94 8 of of IN 16440 94 9 banding banding NN 16440 94 10 used use VBN 16440 94 11 . . . 16440 95 1 In in IN 16440 95 2 every every DT 16440 95 3 case case NN 16440 95 4 where where WRB 16440 95 5 one one CD 16440 95 6 of of IN 16440 95 7 these these DT 16440 95 8 splices splice NNS 16440 95 9 has have VBZ 16440 95 10 pulled pull VBN 16440 95 11 apart apart RB 16440 95 12 , , , 16440 95 13 the the DT 16440 95 14 break break NN 16440 95 15 was be VBD 16440 95 16 the the DT 16440 95 17 result result NN 16440 95 18 of of IN 16440 95 19 defective defective JJ 16440 95 20 riveting riveting NN 16440 95 21 , , , 16440 95 22 permitting permit VBG 16440 95 23 the the DT 16440 95 24 rivets rivet NNS 16440 95 25 to to TO 16440 95 26 pull pull VB 16440 95 27 out out RP 16440 95 28 . . . 16440 96 1 In in IN 16440 96 2 no no DT 16440 96 3 case case NN 16440 96 4 has have VBZ 16440 96 5 a a DT 16440 96 6 rivet rivet NNS 16440 96 7 been be VBN 16440 96 8 found find VBN 16440 96 9 sheared shear VBN 16440 96 10 off off RP 16440 96 11 , , , 16440 96 12 and and CC 16440 96 13 even even RB 16440 96 14 one one CD 16440 96 15 good good JJ 16440 96 16 rivet rivet NNS 16440 96 17 appears appear VBZ 16440 96 18 to to TO 16440 96 19 be be VB 16440 96 20 sufficient sufficient JJ 16440 96 21 to to TO 16440 96 22 prevent prevent VB 16440 96 23 rupture rupture NN 16440 96 24 . . . 16440 97 1 The the DT 16440 97 2 explanation explanation NN 16440 97 3 is be VBZ 16440 97 4 found find VBN 16440 97 5 in in IN 16440 97 6 the the DT 16440 97 7 high high JJ 16440 97 8 frictional frictional JJ 16440 97 9 resistance resistance NN 16440 97 10 between between IN 16440 97 11 the the DT 16440 97 12 band band NN 16440 97 13 and and CC 16440 97 14 the the DT 16440 97 15 pipe pipe NN 16440 97 16 , , , 16440 97 17 which which WDT 16440 97 18 distributes distribute VBZ 16440 97 19 the the DT 16440 97 20 weakness weakness NN 16440 97 21 of of IN 16440 97 22 a a DT 16440 97 23 bad bad JJ 16440 97 24 splice splice NN 16440 97 25 over over IN 16440 97 26 several several JJ 16440 97 27 adjacent adjacent JJ 16440 97 28 turns turn NNS 16440 97 29 of of IN 16440 97 30 the the DT 16440 97 31 band band NN 16440 97 32 around around IN 16440 97 33 the the DT 16440 97 34 pipe pipe NN 16440 97 35 . . . 16440 98 1 The the DT 16440 98 2 band band NN 16440 98 3 loosens loosen VBZ 16440 98 4 a a DT 16440 98 5 few few JJ 16440 98 6 turns turn NNS 16440 98 7 only only RB 16440 98 8 on on IN 16440 98 9 either either DT 16440 98 10 side side NN 16440 98 11 of of IN 16440 98 12 a a DT 16440 98 13 parted parted JJ 16440 98 14 splice splice NN 16440 98 15 , , , 16440 98 16 generally generally RB 16440 98 17 not not RB 16440 98 18 more more JJR 16440 98 19 than than IN 16440 98 20 three three CD 16440 98 21 . . . 16440 99 1 In in IN 16440 99 2 no no DT 16440 99 3 case case NN 16440 99 4 has have VBZ 16440 99 5 any any DT 16440 99 6 pipe pipe NN 16440 99 7 been be VBN 16440 99 8 removed remove VBN 16440 99 9 from from IN 16440 99 10 the the DT 16440 99 11 trench trench NN 16440 99 12 , , , 16440 99 13 repairs repair NNS 16440 99 14 being be VBG 16440 99 15 made make VBN 16440 99 16 without without IN 16440 99 17 interruption interruption NN 16440 99 18 to to IN 16440 99 19 the the DT 16440 99 20 flow flow NN 16440 99 21 of of IN 16440 99 22 water water NN 16440 99 23 . . . 16440 100 1 It -PRON- PRP 16440 100 2 is be VBZ 16440 100 3 desirable desirable JJ 16440 100 4 to to TO 16440 100 5 substitute substitute VB 16440 100 6 welding welding NN 16440 100 7 for for IN 16440 100 8 the the DT 16440 100 9 riveting riveting NN 16440 100 10 of of IN 16440 100 11 these these DT 16440 100 12 splices splice NNS 16440 100 13 . . . 16440 101 1 The the DT 16440 101 2 trouble trouble NN 16440 101 3 is be VBZ 16440 101 4 not not RB 16440 101 5 present present JJ 16440 101 6 with with IN 16440 101 7 the the DT 16440 101 8 round round JJ 16440 101 9 band band NN 16440 101 10 , , , 16440 101 11 the the DT 16440 101 12 wrapped wrap VBN 16440 101 13 splice splice NN 16440 101 14 of of IN 16440 101 15 the the DT 16440 101 16 latter latter JJ 16440 101 17 giving give VBG 16440 101 18 practically practically RB 16440 101 19 100 100 CD 16440 101 20 % % NN 16440 101 21 efficiency efficiency NN 16440 101 22 . . . 16440 102 1 The the DT 16440 102 2 flat flat JJ 16440 102 3 band band NN 16440 102 4 was be VBD 16440 102 5 chosen choose VBN 16440 102 6 for for IN 16440 102 7 this this DT 16440 102 8 work work NN 16440 102 9 because because IN 16440 102 10 it -PRON- PRP 16440 102 11 is be VBZ 16440 102 12 the the DT 16440 102 13 more more RBR 16440 102 14 effectively effectively RB 16440 102 15 buried bury VBN 16440 102 16 in in RP 16440 102 17 and and CC 16440 102 18 protected protect VBN 16440 102 19 by by IN 16440 102 20 the the DT 16440 102 21 asphalt asphalt NN 16440 102 22 , , , 16440 102 23 and and CC 16440 102 24 will will MD 16440 102 25 not not RB 16440 102 26 crush crush VB 16440 102 27 the the DT 16440 102 28 soft soft JJ 16440 102 29 wood wood NN 16440 102 30 staves stave VBZ 16440 102 31 under under IN 16440 102 32 high high JJ 16440 102 33 pressure pressure NN 16440 102 34 . . . 16440 103 1 The the DT 16440 103 2 longevity longevity NN 16440 103 3 of of IN 16440 103 4 either either CC 16440 103 5 the the DT 16440 103 6 flat flat JJ 16440 103 7 or or CC 16440 103 8 the the DT 16440 103 9 round round JJ 16440 103 10 steel steel NN 16440 103 11 band band NN 16440 103 12 is be VBZ 16440 103 13 dependent dependent JJ 16440 103 14 primarily primarily RB 16440 103 15 on on IN 16440 103 16 effective effective JJ 16440 103 17 protection protection NN 16440 103 18 against against IN 16440 103 19 contact contact NN 16440 103 20 with with IN 16440 103 21 corrosive corrosive JJ 16440 103 22 elements element NNS 16440 103 23 . . . 16440 104 1 Wrought work VBN 16440 104 2 iron iron NN 16440 104 3 should should MD 16440 104 4 be be VB 16440 104 5 used use VBN 16440 104 6 for for IN 16440 104 7 this this DT 16440 104 8 kind kind NN 16440 104 9 of of IN 16440 104 10 service service NN 16440 104 11 , , , 16440 104 12 and and CC 16440 104 13 , , , 16440 104 14 for for IN 16440 104 15 the the DT 16440 104 16 same same JJ 16440 104 17 reason reason NN 16440 104 18 , , , 16440 104 19 for for IN 16440 104 20 many many JJ 16440 104 21 other other JJ 16440 104 22 purposes purpose NNS 16440 104 23 . . . 16440 105 1 Engineers engineer NNS 16440 105 2 and and CC 16440 105 3 consumers consumer NNS 16440 105 4 should should MD 16440 105 5 join join VB 16440 105 6 in in IN 16440 105 7 some some DT 16440 105 8 comprehensive comprehensive JJ 16440 105 9 and and CC 16440 105 10 effective effective JJ 16440 105 11 plan plan NN 16440 105 12 to to TO 16440 105 13 bring bring VB 16440 105 14 back back RB 16440 105 15 the the DT 16440 105 16 old old JJ 16440 105 17 - - HYPH 16440 105 18 time time NN 16440 105 19 production production NN 16440 105 20 of of IN 16440 105 21 high high JJ 16440 105 22 - - HYPH 16440 105 23 grade grade NN 16440 105 24 wrought wrought NN 16440 105 25 iron iron NN 16440 105 26 . . . 16440 106 1 _ _ NNP 16440 106 2 Wood Wood NNP 16440 106 3 Staves_.--The staves_.--the CD 16440 106 4 staves stave NNS 16440 106 5 of of IN 16440 106 6 this this DT 16440 106 7 pipe pipe NN 16440 106 8 are be VBP 16440 106 9 of of IN 16440 106 10 Michigan Michigan NNP 16440 106 11 and and CC 16440 106 12 Canadian canadian JJ 16440 106 13 white white JJ 16440 106 14 pine pine NN 16440 106 15 . . . 16440 107 1 This this DT 16440 107 2 pine pine NN 16440 107 3 can can MD 16440 107 4 not not RB 16440 107 5 now now RB 16440 107 6 be be VB 16440 107 7 had have VBN 16440 107 8 of of IN 16440 107 9 clear clear JJ 16440 107 10 stuff stuff NN 16440 107 11 or or CC 16440 107 12 in in IN 16440 107 13 long long JJ 16440 107 14 lengths length NNS 16440 107 15 in in IN 16440 107 16 large large JJ 16440 107 17 quantities quantity NNS 16440 107 18 ; ; : 16440 107 19 otherwise otherwise RB 16440 107 20 , , , 16440 107 21 it -PRON- PRP 16440 107 22 is be VBZ 16440 107 23 unexcelled unexcelle VBN 16440 107 24 . . . 16440 108 1 Douglas Douglas NNP 16440 108 2 fir fir NN 16440 108 3 and and CC 16440 108 4 yellow yellow JJ 16440 108 5 pine pine NN 16440 108 6 , , , 16440 108 7 coarser coarser NN 16440 108 8 and and CC 16440 108 9 harder hard JJR 16440 108 10 woods wood NNS 16440 108 11 , , , 16440 108 12 have have VBP 16440 108 13 the the DT 16440 108 14 advantages advantage NNS 16440 108 15 of of IN 16440 108 16 clear clear JJ 16440 108 17 lumber lumber NN 16440 108 18 and and CC 16440 108 19 long long JJ 16440 108 20 length length NN 16440 108 21 . . . 16440 109 1 Cypress Cypress NNP 16440 109 2 is be VBZ 16440 109 3 not not RB 16440 109 4 as as RB 16440 109 5 plentiful plentiful JJ 16440 109 6 , , , 16440 109 7 and and CC 16440 109 8 redwood redwood NN 16440 109 9 is be VBZ 16440 109 10 costly costly JJ 16440 109 11 . . . 16440 110 1 The the DT 16440 110 2 mill mill NN 16440 110 3 tests test NNS 16440 110 4 did do VBD 16440 110 5 not not RB 16440 110 6 determine determine VB 16440 110 7 definitely definitely RB 16440 110 8 the the DT 16440 110 9 minimum minimum JJ 16440 110 10 degree degree NN 16440 110 11 of of IN 16440 110 12 seasoning seasoning NN 16440 110 13 necessary necessary JJ 16440 110 14 , , , 16440 110 15 and and CC 16440 110 16 press press NN 16440 110 17 of of IN 16440 110 18 time time NN 16440 110 19 compelled compel VBD 16440 110 20 the the DT 16440 110 21 acceptance acceptance NN 16440 110 22 of of IN 16440 110 23 some some DT 16440 110 24 rather rather RB 16440 110 25 green green JJ 16440 110 26 lumber lumber NN 16440 110 27 . . . 16440 111 1 Service service NN 16440 111 2 tests test NNS 16440 111 3 do do VBP 16440 111 4 not not RB 16440 111 5 show show VB 16440 111 6 that that IN 16440 111 7 there there EX 16440 111 8 is be VBZ 16440 111 9 any any DT 16440 111 10 abnormal abnormal JJ 16440 111 11 leakage leakage NN 16440 111 12 from from IN 16440 111 13 pipe pipe NN 16440 111 14 made make VBN 16440 111 15 of of IN 16440 111 16 such such JJ 16440 111 17 lumber lumber NN 16440 111 18 , , , 16440 111 19 and and CC 16440 111 20 it -PRON- PRP 16440 111 21 could could MD 16440 111 22 not not RB 16440 111 23 now now RB 16440 111 24 be be VB 16440 111 25 distinguished distinguish VBN 16440 111 26 in in IN 16440 111 27 the the DT 16440 111 28 trench trench NN 16440 111 29 by by IN 16440 111 30 such such JJ 16440 111 31 tests test NNS 16440 111 32 . . . 16440 112 1 Undoubtedly undoubtedly RB 16440 112 2 , , , 16440 112 3 however however RB 16440 112 4 , , , 16440 112 5 thorough thorough JJ 16440 112 6 air air NN 16440 112 7 seasoning seasoning NN 16440 112 8 should should MD 16440 112 9 be be VB 16440 112 10 required require VBN 16440 112 11 . . . 16440 113 1 _ _ NNP 16440 113 2 Bored Bored NNP 16440 113 3 Pipe_.--Owing Pipe_.--Owing NNP 16440 113 4 to to IN 16440 113 5 its -PRON- PRP$ 16440 113 6 small small JJ 16440 113 7 size size NN 16440 113 8 , , , 16440 113 9 a a DT 16440 113 10 part part NN 16440 113 11 of of IN 16440 113 12 the the DT 16440 113 13 3 3 CD 16440 113 14 - - SYM 16440 113 15 1/2-in 1/2-in CD 16440 113 16 . . . 16440 114 1 pipe pipe NN 16440 114 2 was be VBD 16440 114 3 bored bore VBN 16440 114 4 from from IN 16440 114 5 the the DT 16440 114 6 log log NN 16440 114 7 . . . 16440 115 1 This this DT 16440 115 2 was be VBD 16440 115 3 a a DT 16440 115 4 mistake mistake NN 16440 115 5 , , , 16440 115 6 for for IN 16440 115 7 bored bored JJ 16440 115 8 pipe pipe NN 16440 115 9 has have VBZ 16440 115 10 a a DT 16440 115 11 rough rough JJ 16440 115 12 interior interior NN 16440 115 13 and and CC 16440 115 14 a a DT 16440 115 15 reduced reduce VBN 16440 115 16 capacity capacity NN 16440 115 17 . . . 16440 116 1 The the DT 16440 116 2 inspection inspection NN 16440 116 3 and and CC 16440 116 4 culling culling NN 16440 116 5 are be VBP 16440 116 6 difficult difficult JJ 16440 116 7 and and CC 16440 116 8 unsatisfactory unsatisfactory JJ 16440 116 9 , , , 16440 116 10 and and CC 16440 116 11 imperfections imperfection NNS 16440 116 12 readily readily RB 16440 116 13 apparent apparent JJ 16440 116 14 in in IN 16440 116 15 a a DT 16440 116 16 stave stave NN 16440 116 17 frequently frequently RB 16440 116 18 escape escape VBP 16440 116 19 detection detection NN 16440 116 20 in in IN 16440 116 21 bored bored JJ 16440 116 22 pipe pipe NN 16440 116 23 . . . 16440 117 1 _ _ NNP 16440 117 2 Pipe Pipe NNP 16440 117 3 Joints_.--The Joints_.--The NNP 16440 117 4 chamber chamber NN 16440 117 5 and and CC 16440 117 6 tenon tenon NN 16440 117 7 of of IN 16440 117 8 this this DT 16440 117 9 pipe pipe NN 16440 117 10 is be VBZ 16440 117 11 an an DT 16440 117 12 all all DT 16440 117 13 - - HYPH 16440 117 14 wood wood NN 16440 117 15 joint joint NN 16440 117 16 , , , 16440 117 17 4 4 CD 16440 117 18 in in IN 16440 117 19 . . . 16440 118 1 deep deep JJ 16440 118 2 . . . 16440 119 1 An an DT 16440 119 2 iron iron NN 16440 119 3 sleeve sleeve NN 16440 119 4 makes make VBZ 16440 119 5 a a DT 16440 119 6 better well JJR 16440 119 7 and and CC 16440 119 8 stronger strong JJR 16440 119 9 joint joint JJ 16440 119 10 . . . 16440 120 1 It -PRON- PRP 16440 120 2 compensates compensate VBZ 16440 120 3 for for IN 16440 120 4 any any DT 16440 120 5 lack lack NN 16440 120 6 of of IN 16440 120 7 initial initial JJ 16440 120 8 tension tension NN 16440 120 9 in in IN 16440 120 10 the the DT 16440 120 11 banding banding NN 16440 120 12 over over IN 16440 120 13 the the DT 16440 120 14 chamber chamber NN 16440 120 15 of of IN 16440 120 16 the the DT 16440 120 17 wood wood NN 16440 120 18 joint joint NN 16440 120 19 , , , 16440 120 20 and and CC 16440 120 21 secures secure NNS 16440 120 22 full full JJ 16440 120 23 advantage advantage NN 16440 120 24 of of IN 16440 120 25 the the DT 16440 120 26 swelling swelling NN 16440 120 27 of of IN 16440 120 28 the the DT 16440 120 29 wood wood NN 16440 120 30 . . . 16440 121 1 Cast Cast VBN 16440 121 2 iron iron NN 16440 121 3 is be VBZ 16440 121 4 better well JJR 16440 121 5 than than IN 16440 121 6 steel steel NN 16440 121 7 ; ; : 16440 121 8 it -PRON- PRP 16440 121 9 is be VBZ 16440 121 10 more more RBR 16440 121 11 rigid rigid JJ 16440 121 12 , , , 16440 121 13 and and CC 16440 121 14 its -PRON- PRP$ 16440 121 15 granulated granulate VBN 16440 121 16 surface surface NN 16440 121 17 breaks break VBZ 16440 121 18 up up RP 16440 121 19 the the DT 16440 121 20 smoothness smoothness NN 16440 121 21 of of IN 16440 121 22 the the DT 16440 121 23 wood wood NN 16440 121 24 surface surface NN 16440 121 25 swelling swell VBG 16440 121 26 against against IN 16440 121 27 it -PRON- PRP 16440 121 28 . . . 16440 122 1 One one CD 16440 122 2 objection objection NN 16440 122 3 to to IN 16440 122 4 the the DT 16440 122 5 cast cast NN 16440 122 6 - - HYPH 16440 122 7 iron iron NN 16440 122 8 sleeve sleeve NN 16440 122 9 is be VBZ 16440 122 10 that that DT 16440 122 11 of of IN 16440 122 12 cost cost NN 16440 122 13 , , , 16440 122 14 but but CC 16440 122 15 it -PRON- PRP 16440 122 16 adds add VBZ 16440 122 17 4 4 CD 16440 122 18 in in IN 16440 122 19 . . . 16440 123 1 to to IN 16440 123 2 the the DT 16440 123 3 effective effective JJ 16440 123 4 length length NN 16440 123 5 of of IN 16440 123 6 every every DT 16440 123 7 section section NN 16440 123 8 of of IN 16440 123 9 pipe pipe NN 16440 123 10 , , , 16440 123 11 as as IN 16440 123 12 compared compare VBN 16440 123 13 with with IN 16440 123 14 the the DT 16440 123 15 wood wood NN 16440 123 16 joints joint NNS 16440 123 17 . . . 16440 124 1 On on IN 16440 124 2 the the DT 16440 124 3 Pacific Pacific NNP 16440 124 4 Coast Coast NNP 16440 124 5 , , , 16440 124 6 a a DT 16440 124 7 banded band VBN 16440 124 8 wood wood NN 16440 124 9 - - HYPH 16440 124 10 stave stave NN 16440 124 11 sleeve sleeve NN 16440 124 12 is be VBZ 16440 124 13 used use VBN 16440 124 14 with with IN 16440 124 15 success success NN 16440 124 16 . . . 16440 125 1 _ _ NNP 16440 125 2 Coating_.--To Coating_.--To NNP 16440 125 3 preserve preserve VB 16440 125 4 the the DT 16440 125 5 banding banding NN 16440 125 6 from from IN 16440 125 7 corrosion corrosion NN 16440 125 8 and and CC 16440 125 9 the the DT 16440 125 10 wood wood NN 16440 125 11 from from IN 16440 125 12 exterior exterior NNP 16440 125 13 decay decay NNP 16440 125 14 , , , 16440 125 15 the the DT 16440 125 16 pipe pipe NN 16440 125 17 is be VBZ 16440 125 18 thoroughly thoroughly RB 16440 125 19 enveloped envelop VBN 16440 125 20 in in IN 16440 125 21 refined refined JJ 16440 125 22 asphalt asphalt NN 16440 125 23 having have VBG 16440 125 24 a a DT 16440 125 25 flow flow NN 16440 125 26 - - HYPH 16440 125 27 point point NN 16440 125 28 adjusted adjust VBN 16440 125 29 to to IN 16440 125 30 the the DT 16440 125 31 prevailing prevail VBG 16440 125 32 temperature temperature NN 16440 125 33 during during IN 16440 125 34 shipment shipment NN 16440 125 35 and and CC 16440 125 36 laying lay VBG 16440 125 37 . . . 16440 126 1 One one CD 16440 126 2 grade grade NN 16440 126 3 can can MD 16440 126 4 be be VB 16440 126 5 used use VBN 16440 126 6 through through IN 16440 126 7 a a DT 16440 126 8 considerable considerable JJ 16440 126 9 range range NN 16440 126 10 of of IN 16440 126 11 temperature temperature NN 16440 126 12 . . . 16440 127 1 This this DT 16440 127 2 coating coating NN 16440 127 3 endured endure VBD 16440 127 4 a a DT 16440 127 5 2,000-mile 2,000-mile CD 16440 127 6 shipment shipment NN 16440 127 7 successfully successfully RB 16440 127 8 . . . 16440 128 1 Each each DT 16440 128 2 piece piece NN 16440 128 3 was be VBD 16440 128 4 carefully carefully RB 16440 128 5 inspected inspect VBN 16440 128 6 along along IN 16440 128 7 the the DT 16440 128 8 trench trench NN 16440 128 9 , , , 16440 128 10 and and CC 16440 128 11 any any DT 16440 128 12 break break NN 16440 128 13 in in IN 16440 128 14 the the DT 16440 128 15 coating coating NN 16440 128 16 was be VBD 16440 128 17 thoroughly thoroughly RB 16440 128 18 painted paint VBN 16440 128 19 with with IN 16440 128 20 hot hot JJ 16440 128 21 asphalt asphalt NN 16440 128 22 . . . 16440 129 1 Enough enough JJ 16440 129 2 of of IN 16440 129 3 the the DT 16440 129 4 latter latter JJ 16440 129 5 came come VBD 16440 129 6 in in IN 16440 129 7 barrels barrel NNS 16440 129 8 , , , 16440 129 9 with with IN 16440 129 10 the the DT 16440 129 11 pipe pipe NN 16440 129 12 , , , 16440 129 13 from from IN 16440 129 14 the the DT 16440 129 15 factory factory NN 16440 129 16 . . . 16440 130 1 The the DT 16440 130 2 first first JJ 16440 130 3 37 37 CD 16440 130 4 miles mile NNS 16440 130 5 of of IN 16440 130 6 this this DT 16440 130 7 pipe pipe NN 16440 130 8 has have VBZ 16440 130 9 been be VBN 16440 130 10 in in IN 16440 130 11 service service NN 16440 130 12 for for IN 16440 130 13 two two CD 16440 130 14 years year NNS 16440 130 15 . . . 16440 131 1 Recent recent JJ 16440 131 2 inspections inspection NNS 16440 131 3 show show VBP 16440 131 4 the the DT 16440 131 5 coating coating NN 16440 131 6 to to TO 16440 131 7 be be VB 16440 131 8 in in IN 16440 131 9 excellent excellent JJ 16440 131 10 condition condition NN 16440 131 11 and and CC 16440 131 12 the the DT 16440 131 13 steel steel NN 16440 131 14 underneath underneath RB 16440 131 15 to to TO 16440 131 16 be be VB 16440 131 17 bright bright JJ 16440 131 18 and and CC 16440 131 19 clean clean JJ 16440 131 20 . . . 16440 132 1 In in IN 16440 132 2 some some DT 16440 132 3 cases case NNS 16440 132 4 , , , 16440 132 5 where where WRB 16440 132 6 the the DT 16440 132 7 initial initial JJ 16440 132 8 pressure pressure NN 16440 132 9 and and CC 16440 132 10 leaking leak VBG 16440 132 11 between between IN 16440 132 12 the the DT 16440 132 13 staves stave NNS 16440 132 14 of of IN 16440 132 15 the the DT 16440 132 16 dry dry JJ 16440 132 17 pipe pipe NN 16440 132 18 were be VBD 16440 132 19 great great JJ 16440 132 20 , , , 16440 132 21 the the DT 16440 132 22 escaping escape VBG 16440 132 23 air air NN 16440 132 24 and and CC 16440 132 25 water water NN 16440 132 26 lifted lift VBD 16440 132 27 the the DT 16440 132 28 coating coating NN 16440 132 29 into into IN 16440 132 30 bubbles bubble NNS 16440 132 31 . . . 16440 133 1 At at IN 16440 133 2 some some DT 16440 133 3 points point NNS 16440 133 4 where where WRB 16440 133 5 this this DT 16440 133 6 lifting lifting NN 16440 133 7 was be VBD 16440 133 8 great great JJ 16440 133 9 enough enough RB 16440 133 10 to to TO 16440 133 11 rupture rupture VB 16440 133 12 the the DT 16440 133 13 asphalt asphalt NN 16440 133 14 , , , 16440 133 15 and and CC 16440 133 16 the the DT 16440 133 17 soil soil NN 16440 133 18 is be VBZ 16440 133 19 heavily heavily RB 16440 133 20 charged charge VBN 16440 133 21 with with IN 16440 133 22 alkali alkali JJ 16440 133 23 , , , 16440 133 24 some some DT 16440 133 25 corrosion corrosion NN 16440 133 26 has have VBZ 16440 133 27 begun begin VBN 16440 133 28 . . . 16440 134 1 The the DT 16440 134 2 integrity integrity NN 16440 134 3 and and CC 16440 134 4 impermeability impermeability NN 16440 134 5 of of IN 16440 134 6 this this DT 16440 134 7 asphalt asphalt NN 16440 134 8 coat coat NN 16440 134 9 are be VBP 16440 134 10 quite quite RB 16440 134 11 as as RB 16440 134 12 vital vital JJ 16440 134 13 as as IN 16440 134 14 constant constant JJ 16440 134 15 saturation saturation NN 16440 134 16 . . . 16440 135 1 This this DT 16440 135 2 coating coating NN 16440 135 3 protects protect VBZ 16440 135 4 the the DT 16440 135 5 entire entire JJ 16440 135 6 pipe pipe NN 16440 135 7 from from IN 16440 135 8 exterior exterior JJ 16440 135 9 contact contact NN 16440 135 10 with with IN 16440 135 11 destructive destructive JJ 16440 135 12 agencies agency NNS 16440 135 13 . . . 16440 136 1 With with IN 16440 136 2 such such JJ 16440 136 3 effective effective JJ 16440 136 4 exterior exterior NN 16440 136 5 protection protection NN 16440 136 6 , , , 16440 136 7 a a DT 16440 136 8 constantly constantly RB 16440 136 9 full full JJ 16440 136 10 pipe pipe NN 16440 136 11 is be VBZ 16440 136 12 not not RB 16440 136 13 so so RB 16440 136 14 imperative imperative JJ 16440 136 15 . . . 16440 137 1 In in IN 16440 137 2 the the DT 16440 137 3 exterior exterior JJ 16440 137 4 protection protection NN 16440 137 5 of of IN 16440 137 6 the the DT 16440 137 7 wood wood NN 16440 137 8 , , , 16440 137 9 this this DT 16440 137 10 coated coat VBN 16440 137 11 pipe pipe NN 16440 137 12 has have VBZ 16440 137 13 quite quite PDT 16440 137 14 an an DT 16440 137 15 advantage advantage NN 16440 137 16 over over IN 16440 137 17 continuous continuous JJ 16440 137 18 stave stave NN 16440 137 19 pipe pipe NN 16440 137 20 . . . 16440 138 1 Each each DT 16440 138 2 piece piece NN 16440 138 3 of of IN 16440 138 4 pipe pipe NN 16440 138 5 goes go VBZ 16440 138 6 directly directly RB 16440 138 7 from from IN 16440 138 8 the the DT 16440 138 9 winder winder NN 16440 138 10 to to IN 16440 138 11 the the DT 16440 138 12 asphalt asphalt NN 16440 138 13 rolls roll NNS 16440 138 14 , , , 16440 138 15 then then RB 16440 138 16 to to IN 16440 138 17 an an DT 16440 138 18 adjacent adjacent JJ 16440 138 19 saw saw JJ 16440 138 20 - - HYPH 16440 138 21 dust dust NN 16440 138 22 table table NN 16440 138 23 , , , 16440 138 24 then then RB 16440 138 25 back back RB 16440 138 26 to to IN 16440 138 27 the the DT 16440 138 28 rolls roll NNS 16440 138 29 , , , 16440 138 30 then then RB 16440 138 31 to to IN 16440 138 32 the the DT 16440 138 33 table table NN 16440 138 34 again again RB 16440 138 35 , , , 16440 138 36 and and CC 16440 138 37 then then RB 16440 138 38 to to IN 16440 138 39 the the DT 16440 138 40 dry dry JJ 16440 138 41 finishing finishing NN 16440 138 42 rolls roll NNS 16440 138 43 at at IN 16440 138 44 the the DT 16440 138 45 opposite opposite JJ 16440 138 46 end end NN 16440 138 47 of of IN 16440 138 48 the the DT 16440 138 49 table table NN 16440 138 50 . . . 16440 139 1 The the DT 16440 139 2 coating coating NN 16440 139 3 thus thus RB 16440 139 4 consists consist VBZ 16440 139 5 of of IN 16440 139 6 two two CD 16440 139 7 layers layer NNS 16440 139 8 of of IN 16440 139 9 asphalt asphalt NN 16440 139 10 and and CC 16440 139 11 two two CD 16440 139 12 of of IN 16440 139 13 saw saw NN 16440 139 14 - - HYPH 16440 139 15 dust dust NN 16440 139 16 . . . 16440 140 1 When when WRB 16440 140 2 the the DT 16440 140 3 pipe pipe NN 16440 140 4 leaves leave VBZ 16440 140 5 the the DT 16440 140 6 finishing finish VBG 16440 140 7 rolls roll NNS 16440 140 8 , , , 16440 140 9 the the DT 16440 140 10 coat coat NN 16440 140 11 is be VBZ 16440 140 12 hard hard JJ 16440 140 13 and and CC 16440 140 14 smooth smooth JJ 16440 140 15 and and CC 16440 140 16 about about RB 16440 140 17 1 1 CD 16440 140 18 3/16 3/16 CD 16440 140 19 in in IN 16440 140 20 . . . 16440 141 1 thick thick JJ 16440 141 2 . . . 16440 142 1 This this DT 16440 142 2 describes describe VBZ 16440 142 3 the the DT 16440 142 4 coating coating NN 16440 142 5 as as IN 16440 142 6 done do VBN 16440 142 7 at at IN 16440 142 8 Bay Bay NNP 16440 142 9 City City NNP 16440 142 10 , , , 16440 142 11 Mich. Michigan NNP 16440 142 12 At at IN 16440 142 13 Elmira Elmira NNP 16440 142 14 , , , 16440 142 15 N.Y. New York NNP 16440 142 16 , , , 16440 142 17 one one CD 16440 142 18 application application NN 16440 142 19 of of IN 16440 142 20 asphalt asphalt NN 16440 142 21 and and CC 16440 142 22 saw saw NN 16440 142 23 - - HYPH 16440 142 24 dust dust NN 16440 142 25 only only RB 16440 142 26 , , , 16440 142 27 without without IN 16440 142 28 a a DT 16440 142 29 finishing finish VBG 16440 142 30 dry dry JJ 16440 142 31 roll roll NN 16440 142 32 , , , 16440 142 33 completed complete VBD 16440 142 34 the the DT 16440 142 35 work work NN 16440 142 36 ; ; : 16440 142 37 but but CC 16440 142 38 the the DT 16440 142 39 band band NN 16440 142 40 was be VBD 16440 142 41 run run VBN 16440 142 42 through through IN 16440 142 43 a a DT 16440 142 44 bath bath NN 16440 142 45 of of IN 16440 142 46 hot hot JJ 16440 142 47 asphalt asphalt NN 16440 142 48 as as IN 16440 142 49 it -PRON- PRP 16440 142 50 was be VBD 16440 142 51 wound wind VBN 16440 142 52 , , , 16440 142 53 thus thus RB 16440 142 54 coating coat VBG 16440 142 55 its -PRON- PRP$ 16440 142 56 underside underside NN 16440 142 57 also also RB 16440 142 58 . . . 16440 143 1 This this DT 16440 143 2 initial initial JJ 16440 143 3 treatment treatment NN 16440 143 4 of of IN 16440 143 5 the the DT 16440 143 6 band band NN 16440 143 7 on on IN 16440 143 8 the the DT 16440 143 9 Wykoff Wykoff NNP 16440 143 10 pipe pipe NN 16440 143 11 is be VBZ 16440 143 12 necessary necessary JJ 16440 143 13 because because IN 16440 143 14 the the DT 16440 143 15 exterior exterior NN 16440 143 16 of of IN 16440 143 17 the the DT 16440 143 18 stave stave NN 16440 143 19 is be VBZ 16440 143 20 neither neither CC 16440 143 21 planed plane VBN 16440 143 22 nor nor CC 16440 143 23 turned turn VBD 16440 143 24 to to IN 16440 143 25 a a DT 16440 143 26 circle circle NN 16440 143 27 . . . 16440 144 1 The the DT 16440 144 2 exterior exterior NN 16440 144 3 of of IN 16440 144 4 the the DT 16440 144 5 pipe pipe NN 16440 144 6 forms form VBZ 16440 144 7 a a DT 16440 144 8 polygon polygon NN 16440 144 9 , , , 16440 144 10 and and CC 16440 144 11 the the DT 16440 144 12 band band NN 16440 144 13 is be VBZ 16440 144 14 in in IN 16440 144 15 perfect perfect JJ 16440 144 16 contact contact NN 16440 144 17 only only RB 16440 144 18 at at IN 16440 144 19 the the DT 16440 144 20 angles angle NNS 16440 144 21 . . . 16440 145 1 The the DT 16440 145 2 theory theory NN 16440 145 3 in in IN 16440 145 4 regard regard NN 16440 145 5 to to IN 16440 145 6 the the DT 16440 145 7 Michigan Michigan NNP 16440 145 8 pipe pipe NN 16440 145 9 is be VBZ 16440 145 10 that that IN 16440 145 11 the the DT 16440 145 12 perfect perfect JJ 16440 145 13 contact contact NN 16440 145 14 of of IN 16440 145 15 the the DT 16440 145 16 band band NN 16440 145 17 and and CC 16440 145 18 the the DT 16440 145 19 wood wood NN 16440 145 20 on on IN 16440 145 21 the the DT 16440 145 22 true true JJ 16440 145 23 exterior exterior NNP 16440 145 24 circle circle NNP 16440 145 25 excludes exclude VBZ 16440 145 26 air air NN 16440 145 27 from from IN 16440 145 28 the the DT 16440 145 29 under under JJ 16440 145 30 surface surface NN 16440 145 31 of of IN 16440 145 32 the the DT 16440 145 33 metal metal NN 16440 145 34 , , , 16440 145 35 and and CC 16440 145 36 prevents prevent VBZ 16440 145 37 corrosion corrosion NN 16440 145 38 . . . 16440 146 1 Experience experience NN 16440 146 2 appears appear VBZ 16440 146 3 to to TO 16440 146 4 justify justify VB 16440 146 5 this this DT 16440 146 6 theory theory NN 16440 146 7 . . . 16440 147 1 _ _ NNP 16440 147 2 Cast Cast NNP 16440 147 3 - - HYPH 16440 147 4 iron iron NN 16440 147 5 Pipe_.--Beginning pipe_.--beginning XX 16440 147 6 at at IN 16440 147 7 the the DT 16440 147 8 first first JJ 16440 147 9 pumping pumping NN 16440 147 10 plant plant NN 16440 147 11 at at IN 16440 147 12 Coyote Coyote NNP 16440 147 13 , , , 16440 147 14 at at IN 16440 147 15 Mile Mile NNP 16440 147 16 156 156 CD 16440 147 17 , , , 16440 147 18 and and CC 16440 147 19 running run VBG 16440 147 20 up up IN 16440 147 21 to to IN 16440 147 22 Mile Mile NNP 16440 147 23 166 166 CD 16440 147 24 , , , 16440 147 25 and and CC 16440 147 26 again again RB 16440 147 27 commencing commence VBG 16440 147 28 at at IN 16440 147 29 the the DT 16440 147 30 Luna Luna NNP 16440 147 31 pumps pump NNS 16440 147 32 , , , 16440 147 33 at at IN 16440 147 34 Mile Mile NNP 16440 147 35 171 171 CD 16440 147 36 , , , 16440 147 37 and and CC 16440 147 38 extending extend VBG 16440 147 39 up up RP 16440 147 40 to to IN 16440 147 41 Mile Mile NNP 16440 147 42 179 179 CD 16440 147 43 , , , 16440 147 44 the the DT 16440 147 45 minimum minimum JJ 16440 147 46 pressure pressure NN 16440 147 47 on on IN 16440 147 48 those those DT 16440 147 49 portions portion NNS 16440 147 50 of of IN 16440 147 51 the the DT 16440 147 52 pump pump NN 16440 147 53 main main JJ 16440 147 54 is be VBZ 16440 147 55 more more JJR 16440 147 56 than than IN 16440 147 57 the the DT 16440 147 58 130 130 CD 16440 147 59 lb lb NN 16440 147 60 . . . 16440 148 1 per per IN 16440 148 2 sq sq NNP 16440 148 3 . . . 16440 149 1 in in IN 16440 149 2 . . . 16440 150 1 allowed allow VBN 16440 150 2 for for IN 16440 150 3 wood wood NN 16440 150 4 pipe pipe NN 16440 150 5 , , , 16440 150 6 and and CC 16440 150 7 the the DT 16440 150 8 final final JJ 16440 150 9 estimated estimate VBN 16440 150 10 maximum maximum JJ 16440 150 11 pressures pressure NNS 16440 150 12 run run VBP 16440 150 13 up up RB 16440 150 14 to to IN 16440 150 15 310 310 CD 16440 150 16 lb lb RB 16440 150 17 . . . 16440 151 1 The the DT 16440 151 2 selection selection NN 16440 151 3 of of IN 16440 151 4 iron iron NN 16440 151 5 pipe pipe NN 16440 151 6 for for IN 16440 151 7 these these DT 16440 151 8 pressures pressure NNS 16440 151 9 was be VBD 16440 151 10 , , , 16440 151 11 first first RB 16440 151 12 , , , 16440 151 13 as as IN 16440 151 14 between between IN 16440 151 15 steel steel NN 16440 151 16 and and CC 16440 151 17 cast cast NN 16440 151 18 - - HYPH 16440 151 19 iron iron NN 16440 151 20 ; ; : 16440 151 21 and and CC 16440 151 22 , , , 16440 151 23 second second JJ 16440 151 24 , , , 16440 151 25 as as IN 16440 151 26 between between IN 16440 151 27 the the DT 16440 151 28 lead lead JJ 16440 151 29 joint joint NN 16440 151 30 of of IN 16440 151 31 the the DT 16440 151 32 standard standard JJ 16440 151 33 bell bell NNP 16440 151 34 and and CC 16440 151 35 spigot spigot NNP 16440 151 36 pipe pipe NNP 16440 151 37 and and CC 16440 151 38 the the DT 16440 151 39 machined machined JJ 16440 151 40 iron iron NN 16440 151 41 joint joint NN 16440 151 42 of of IN 16440 151 43 the the DT 16440 151 44 universal universal JJ 16440 151 45 joint joint JJ 16440 151 46 pipe pipe NN 16440 151 47 . . . 16440 152 1 Again again RB 16440 152 2 , , , 16440 152 3 the the DT 16440 152 4 choice choice NN 16440 152 5 was be VBD 16440 152 6 as as IN 16440 152 7 between between IN 16440 152 8 lead lead NN 16440 152 9 and and CC 16440 152 10 leadite leadite NN 16440 152 11 for for IN 16440 152 12 the the DT 16440 152 13 bell bell NNP 16440 152 14 and and CC 16440 152 15 spigot spigot NNP 16440 152 16 pipe pipe NN 16440 152 17 . . . 16440 153 1 Cast Cast VBN 16440 153 2 iron iron NN 16440 153 3 was be VBD 16440 153 4 selected select VBN 16440 153 5 because because IN 16440 153 6 of of IN 16440 153 7 the the DT 16440 153 8 certainty certainty NN 16440 153 9 of of IN 16440 153 10 its -PRON- PRP$ 16440 153 11 long long JJ 16440 153 12 life life NN 16440 153 13 , , , 16440 153 14 and and CC 16440 153 15 the the DT 16440 153 16 bell bell NN 16440 153 17 and and CC 16440 153 18 spigot spigot NNP 16440 153 19 pipe pipe NN 16440 153 20 was be VBD 16440 153 21 selected select VBN 16440 153 22 on on IN 16440 153 23 the the DT 16440 153 24 basis basis NN 16440 153 25 of of IN 16440 153 26 comparative comparative JJ 16440 153 27 costs cost NNS 16440 153 28 for for IN 16440 153 29 pipe pipe NN 16440 153 30 laid lay VBN 16440 153 31 . . . 16440 154 1 The the DT 16440 154 2 standard standard JJ 16440 154 3 lead lead NN 16440 154 4 joint joint NN 16440 154 5 was be VBD 16440 154 6 chosen choose VBN 16440 154 7 on on IN 16440 154 8 the the DT 16440 154 9 result result NN 16440 154 10 of of IN 16440 154 11 tests test NNS 16440 154 12 . . . 16440 155 1 This this DT 16440 155 2 cast cast NN 16440 155 3 - - HYPH 16440 155 4 iron iron NN 16440 155 5 pumping pumping NN 16440 155 6 main main JJ 16440 155 7 has have VBZ 16440 155 8 a a DT 16440 155 9 diameter diameter NN 16440 155 10 of of IN 16440 155 11 12 12 CD 16440 155 12 in in IN 16440 155 13 . . . 16440 156 1 throughout throughout IN 16440 156 2 . . . 16440 157 1 _ _ NNP 16440 157 2 Pipe Pipe NNP 16440 157 3 Weights._--Makers weights._--makers CD 16440 157 4 of of IN 16440 157 5 standard standard JJ 16440 157 6 bell bell NNP 16440 157 7 and and CC 16440 157 8 spigot spigot NNP 16440 157 9 pipe pipe NNP 16440 157 10 urged urge VBD 16440 157 11 the the DT 16440 157 12 usual usual JJ 16440 157 13 heavy heavy JJ 16440 157 14 weights weight NNS 16440 157 15 selected select VBN 16440 157 16 for for IN 16440 157 17 municipal municipal JJ 16440 157 18 service service NN 16440 157 19 and and CC 16440 157 20 heavy heavy JJ 16440 157 21 water water NN 16440 157 22 - - HYPH 16440 157 23 hammer hammer NN 16440 157 24 . . . 16440 158 1 Three three CD 16440 158 2 pressures pressure NNS 16440 158 3 , , , 16440 158 4 _ _ NNP 16440 158 5 viz viz NNP 16440 158 6 _ _ NNP 16440 158 7 . . NNP 16440 158 8 , , , 16440 158 9 217 217 CD 16440 158 10 , , , 16440 158 11 260 260 CD 16440 158 12 , , , 16440 158 13 and and CC 16440 158 14 304 304 CD 16440 158 15 lb lb NN 16440 158 16 . . . 16440 158 17 , , , 16440 158 18 were be VBD 16440 158 19 used use VBN 16440 158 20 for for IN 16440 158 21 the the DT 16440 158 22 division division NN 16440 158 23 of of IN 16440 158 24 pipe pipe NN 16440 158 25 weights weight NNS 16440 158 26 , , , 16440 158 27 on on IN 16440 158 28 which which WDT 16440 158 29 the the DT 16440 158 30 standard standard JJ 16440 158 31 pipe pipe NN 16440 158 32 - - HYPH 16440 158 33 makers maker NNS 16440 158 34 specified specify VBD 16440 158 35 shell shell NN 16440 158 36 thicknesses thickness NNS 16440 158 37 of of IN 16440 158 38 0.82 0.82 CD 16440 158 39 , , , 16440 158 40 0.89 0.89 CD 16440 158 41 , , , 16440 158 42 and and CC 16440 158 43 0.97 0.97 CD 16440 158 44 in in RB 16440 158 45 . . . 16440 159 1 Eliminating eliminate VBG 16440 159 2 water water NN 16440 159 3 - - HYPH 16440 159 4 hammer hammer NN 16440 159 5 and and CC 16440 159 6 adopting adopt VBG 16440 159 7 a a DT 16440 159 8 working work VBG 16440 159 9 stress stress NN 16440 159 10 of of IN 16440 159 11 2,400 2,400 CD 16440 159 12 lb lb RB 16440 159 13 . . . 16440 159 14 , , , 16440 159 15 the the DT 16440 159 16 thicknesses thickness NNS 16440 159 17 are be VBP 16440 159 18 reduced reduce VBN 16440 159 19 to to IN 16440 159 20 0.54 0.54 CD 16440 159 21 , , , 16440 159 22 0.65 0.65 CD 16440 159 23 , , , 16440 159 24 and and CC 16440 159 25 0.76 0.76 CD 16440 159 26 in in IN 16440 159 27 . . . 16440 160 1 To to TO 16440 160 2 make make VB 16440 160 3 the the DT 16440 160 4 latter latter JJ 16440 160 5 conform conform NN 16440 160 6 to to IN 16440 160 7 the the DT 16440 160 8 specifications specification NNS 16440 160 9 of of IN 16440 160 10 the the DT 16440 160 11 New New NNP 16440 160 12 England England NNP 16440 160 13 Water Water NNP 16440 160 14 - - HYPH 16440 160 15 Works Works NNP 16440 160 16 Association Association NNP 16440 160 17 , , , 16440 160 18 the the DT 16440 160 19 pipe pipe NN 16440 160 20 was be VBD 16440 160 21 cast cast VBN 16440 160 22 to to IN 16440 160 23 0.57 0.57 CD 16440 160 24 , , , 16440 160 25 0.65 0.65 CD 16440 160 26 , , , 16440 160 27 and and CC 16440 160 28 0.77 0.77 CD 16440 160 29 in in RB 16440 160 30 . . . 16440 161 1 The the DT 16440 161 2 reduction reduction NN 16440 161 3 in in IN 16440 161 4 cost cost NN 16440 161 5 amounts amount NNS 16440 161 6 to to IN 16440 161 7 $ $ $ 16440 161 8 52,811 52,811 CD 16440 161 9 . . . 16440 162 1 By by IN 16440 162 2 the the DT 16440 162 3 provision provision NN 16440 162 4 of of IN 16440 162 5 air air NN 16440 162 6 - - HYPH 16440 162 7 cushions cushion NNS 16440 162 8 , , , 16440 162 9 hereafter hereafter RB 16440 162 10 described describe VBN 16440 162 11 , , , 16440 162 12 the the DT 16440 162 13 writer writer NN 16440 162 14 's 's POS 16440 162 15 anticipation anticipation NN 16440 162 16 of of IN 16440 162 17 no no DT 16440 162 18 water water NN 16440 162 19 - - HYPH 16440 162 20 hammer hammer NN 16440 162 21 on on IN 16440 162 22 the the DT 16440 162 23 pumping pump VBG 16440 162 24 main main NN 16440 162 25 has have VBZ 16440 162 26 been be VBN 16440 162 27 fully fully RB 16440 162 28 realized realize VBN 16440 162 29 . . . 16440 163 1 The the DT 16440 163 2 pipe pipe NN 16440 163 3 was be VBD 16440 163 4 manufactured manufacture VBN 16440 163 5 and and CC 16440 163 6 inspected inspect VBN 16440 163 7 under under IN 16440 163 8 the the DT 16440 163 9 above above RB 16440 163 10 - - HYPH 16440 163 11 mentioned mention VBN 16440 163 12 specifications specification NNS 16440 163 13 . . . 16440 164 1 _ _ NNP 16440 164 2 Pipe Pipe NNP 16440 164 3 Joints_.--There Joints_.--There NNP 16440 164 4 was be VBD 16440 164 5 a a DT 16440 164 6 question question NN 16440 164 7 about about IN 16440 164 8 the the DT 16440 164 9 reliability reliability NN 16440 164 10 of of IN 16440 164 11 the the DT 16440 164 12 lead lead NN 16440 164 13 joint joint NN 16440 164 14 at at IN 16440 164 15 300 300 CD 16440 164 16 lb lb NN 16440 164 17 . . . 16440 165 1 The the DT 16440 165 2 writer writer NN 16440 165 3 had have VBD 16440 165 4 a a DT 16440 165 5 section section NN 16440 165 6 of of IN 16440 165 7 12-in 12-in CD 16440 165 8 . . . 16440 166 1 pipe pipe NN 16440 166 2 , , , 16440 166 3 with with IN 16440 166 4 standard standard JJ 16440 166 5 joints joint NNS 16440 166 6 containing contain VBG 16440 166 7 22 22 CD 16440 166 8 lb lb RB 16440 166 9 . . . 16440 167 1 of of IN 16440 167 2 lead lead NNP 16440 167 3 , , , 16440 167 4 laid lay VBN 16440 167 5 and and CC 16440 167 6 tested test VBD 16440 167 7 to to IN 16440 167 8 500 500 CD 16440 167 9 lb lb IN 16440 167 10 . . . 16440 168 1 without without IN 16440 168 2 sign sign NN 16440 168 3 of of IN 16440 168 4 failure failure NN 16440 168 5 or or CC 16440 168 6 leakage leakage NN 16440 168 7 . . . 16440 169 1 The the DT 16440 169 2 joints joint NNS 16440 169 3 were be VBD 16440 169 4 caulked caulk VBN 16440 169 5 down down IN 16440 169 6 3/16 3/16 CD 16440 169 7 in in RB 16440 169 8 . . . 16440 170 1 below below IN 16440 170 2 the the DT 16440 170 3 face face NN 16440 170 4 of of IN 16440 170 5 the the DT 16440 170 6 bell bell NN 16440 170 7 . . . 16440 171 1 Of of IN 16440 171 2 8,700 8,700 CD 16440 171 3 joints joint NNS 16440 171 4 thus thus RB 16440 171 5 made make VBN 16440 171 6 in in IN 16440 171 7 the the DT 16440 171 8 field field NN 16440 171 9 , , , 16440 171 10 not not RB 16440 171 11 one one CD 16440 171 12 has have VBZ 16440 171 13 blown blow VBN 16440 171 14 out out RP 16440 171 15 or or CC 16440 171 16 failed fail VBD 16440 171 17 . . . 16440 172 1 A a DT 16440 172 2 few few JJ 16440 172 3 weeped weep VBN 16440 172 4 slightly slightly RB 16440 172 5 on on IN 16440 172 6 top top NN 16440 172 7 , , , 16440 172 8 and and CC 16440 172 9 they -PRON- PRP 16440 172 10 were be VBD 16440 172 11 made make VBN 16440 172 12 permanently permanently RB 16440 172 13 tight tight JJ 16440 172 14 by by IN 16440 172 15 additional additional JJ 16440 172 16 caulking caulking NN 16440 172 17 . . . 16440 173 1 The the DT 16440 173 2 present present JJ 16440 173 3 maximum maximum JJ 16440 173 4 pressure pressure NN 16440 173 5 is be VBZ 16440 173 6 278 278 CD 16440 173 7 lb lb RB 16440 173 8 . . . 16440 174 1 These these DT 16440 174 2 joints joint NNS 16440 174 3 are be VBP 16440 174 4 the the DT 16440 174 5 standard standard JJ 16440 174 6 joints joint NNS 16440 174 7 specified specify VBN 16440 174 8 by by IN 16440 174 9 the the DT 16440 174 10 New New NNP 16440 174 11 England England NNP 16440 174 12 Water Water NNP 16440 174 13 - - HYPH 16440 174 14 Works Works NNP 16440 174 15 Association Association NNP 16440 174 16 . . . 16440 175 1 It -PRON- PRP 16440 175 2 should should MD 16440 175 3 be be VB 16440 175 4 borne bear VBN 16440 175 5 in in IN 16440 175 6 mind mind NN 16440 175 7 that that IN 16440 175 8 there there EX 16440 175 9 is be VBZ 16440 175 10 no no DT 16440 175 11 water water NN 16440 175 12 - - HYPH 16440 175 13 hammer hammer NN 16440 175 14 on on IN 16440 175 15 this this DT 16440 175 16 line line NN 16440 175 17 . . . 16440 176 1 In in IN 16440 176 2 8,700 8,700 CD 16440 176 3 joints joint NNS 16440 176 4 , , , 16440 176 5 198,000 198,000 CD 16440 176 6 lb lb IN 16440 176 7 . . . 16440 177 1 of of IN 16440 177 2 lead lead NN 16440 177 3 and and CC 16440 177 4 3,200 3,200 CD 16440 177 5 lb lb RB 16440 177 6 . . . 16440 178 1 of of IN 16440 178 2 oakum oakum NNP 16440 178 3 were be VBD 16440 178 4 used use VBN 16440 178 5 , , , 16440 178 6 or or CC 16440 178 7 22.76 22.76 CD 16440 178 8 and and CC 16440 178 9 0.37 0.37 CD 16440 178 10 lb lb IN 16440 178 11 . . . 16440 179 1 per per IN 16440 179 2 joint joint NN 16440 179 3 . . . 16440 180 1 Leadite Leadite NNP 16440 180 2 was be VBD 16440 180 3 tested test VBN 16440 180 4 in in IN 16440 180 5 competition competition NN 16440 180 6 with with IN 16440 180 7 lead lead NN 16440 180 8 , , , 16440 180 9 but but CC 16440 180 10 it -PRON- PRP 16440 180 11 leaked leak VBD 16440 180 12 at at IN 16440 180 13 100 100 CD 16440 180 14 lb lb RB 16440 180 15 . . . 16440 181 1 and and CC 16440 181 2 failed fail VBD 16440 181 3 under under IN 16440 181 4 a a DT 16440 181 5 sustained sustained JJ 16440 181 6 pressure pressure NN 16440 181 7 of of IN 16440 181 8 300 300 CD 16440 181 9 lb lb NN 16440 181 10 . . . 16440 182 1 It -PRON- PRP 16440 182 2 is be VBZ 16440 182 3 a a DT 16440 182 4 friable friable JJ 16440 182 5 material material NN 16440 182 6 , , , 16440 182 7 and and CC 16440 182 8 can can MD 16440 182 9 not not RB 16440 182 10 be be VB 16440 182 11 caulked caulk VBN 16440 182 12 successfully successfully RB 16440 182 13 . . . 16440 183 1 Its -PRON- PRP$ 16440 183 2 principal principal JJ 16440 183 3 ingredient ingredient NN 16440 183 4 appears appear VBZ 16440 183 5 to to TO 16440 183 6 be be VB 16440 183 7 sulphur sulphur NNP 16440 183 8 . . . 16440 184 1 The the DT 16440 184 2 failure failure NN 16440 184 3 was be VBD 16440 184 4 by by IN 16440 184 5 slow slow JJ 16440 184 6 creeping creep VBG 16440 184 7 out out IN 16440 184 8 of of IN 16440 184 9 the the DT 16440 184 10 joints joint NNS 16440 184 11 . . . 16440 185 1 It -PRON- PRP 16440 185 2 is be VBZ 16440 185 3 melted melt VBN 16440 185 4 and and CC 16440 185 5 poured pour VBN 16440 185 6 , , , 16440 185 7 but but CC 16440 185 8 not not RB 16440 185 9 caulked caulk VBN 16440 185 10 . . . 16440 186 1 It -PRON- PRP 16440 186 2 has have VBZ 16440 186 3 attractive attractive JJ 16440 186 4 features feature NNS 16440 186 5 for for IN 16440 186 6 low low JJ 16440 186 7 pressures pressure NNS 16440 186 8 and and CC 16440 186 9 for for IN 16440 186 10 lines line NNS 16440 186 11 not not RB 16440 186 12 subject subject JJ 16440 186 13 to to IN 16440 186 14 movement movement NN 16440 186 15 or or CC 16440 186 16 heavy heavy JJ 16440 186 17 jarring jarring NN 16440 186 18 . . . 16440 187 1 _ _ NNP 16440 187 2 Air Air NNP 16440 187 3 - - HYPH 16440 187 4 Cushions_.--To Cushions_.--To NNP 16440 187 5 prevent prevent NN 16440 187 6 water water NN 16440 187 7 - - HYPH 16440 187 8 hammer hammer NN 16440 187 9 on on IN 16440 187 10 the the DT 16440 187 11 pumping pump VBG 16440 187 12 main main NN 16440 187 13 , , , 16440 187 14 all all DT 16440 187 15 pumps pump NNS 16440 187 16 are be VBP 16440 187 17 provided provide VBN 16440 187 18 with with IN 16440 187 19 large large JJ 16440 187 20 air air NN 16440 187 21 - - HYPH 16440 187 22 chambers chamber NNS 16440 187 23 . . . 16440 188 1 In in IN 16440 188 2 addition addition NN 16440 188 3 , , , 16440 188 4 and and CC 16440 188 5 as as IN 16440 188 6 the the DT 16440 188 7 special special JJ 16440 188 8 feature feature NN 16440 188 9 for for IN 16440 188 10 absorbing absorb VBG 16440 188 11 the the DT 16440 188 12 shock shock NN 16440 188 13 of of IN 16440 188 14 pumping pump VBG 16440 188 15 under under IN 16440 188 16 high high JJ 16440 188 17 pressure pressure NN 16440 188 18 through through IN 16440 188 19 a a DT 16440 188 20 pipe pipe NN 16440 188 21 21 21 CD 16440 188 22 miles mile NNS 16440 188 23 long long JJ 16440 188 24 , , , 16440 188 25 a a DT 16440 188 26 large large JJ 16440 188 27 air air NN 16440 188 28 - - HYPH 16440 188 29 chamber chamber NN 16440 188 30 in in IN 16440 188 31 the the DT 16440 188 32 form form NN 16440 188 33 of of IN 16440 188 34 a a DT 16440 188 35 closed close VBN 16440 188 36 steel steel NN 16440 188 37 cylinder cylinder NN 16440 188 38 , , , 16440 188 39 5 5 CD 16440 188 40 ft ft NN 16440 188 41 . . NNP 16440 188 42 in in IN 16440 188 43 diameter diameter NN 16440 188 44 and and CC 16440 188 45 15 15 CD 16440 188 46 ft ft NN 16440 188 47 . . NNP 16440 188 48 long long RB 16440 188 49 , , , 16440 188 50 is be VBZ 16440 188 51 mounted mount VBN 16440 188 52 on on IN 16440 188 53 the the DT 16440 188 54 pumping pump VBG 16440 188 55 main main JJ 16440 188 56 outside outside NN 16440 188 57 of of IN 16440 188 58 the the DT 16440 188 59 pump pump NN 16440 188 60 - - HYPH 16440 188 61 house house NN 16440 188 62 . . . 16440 189 1 This this DT 16440 189 2 cylinder cylinder NN 16440 189 3 is be VBZ 16440 189 4 set set VBN 16440 189 5 on on IN 16440 189 6 its -PRON- PRP$ 16440 189 7 side side NN 16440 189 8 , , , 16440 189 9 in in IN 16440 189 10 concrete concrete JJ 16440 189 11 collars collar NNS 16440 189 12 , , , 16440 189 13 directly directly RB 16440 189 14 over over IN 16440 189 15 the the DT 16440 189 16 pipe pipe NN 16440 189 17 beneath beneath RB 16440 189 18 , , , 16440 189 19 to to TO 16440 189 20 which which WDT 16440 189 21 it -PRON- PRP 16440 189 22 is be VBZ 16440 189 23 connected connect VBN 16440 189 24 by by IN 16440 189 25 a a DT 16440 189 26 12-in 12-in CD 16440 189 27 . . . 16440 190 1 tee tee NN 16440 190 2 , , , 16440 190 3 in in IN 16440 190 4 which which WDT 16440 190 5 a a DT 16440 190 6 12-in 12-in CD 16440 190 7 . . . 16440 191 1 gate gate NNP 16440 191 2 - - HYPH 16440 191 3 valve valve NNP 16440 191 4 is be VBZ 16440 191 5 set set VBN 16440 191 6 . . . 16440 192 1 The the DT 16440 192 2 cylinder cylinder NN 16440 192 3 is be VBZ 16440 192 4 provided provide VBN 16440 192 5 with with IN 16440 192 6 a a DT 16440 192 7 glass glass NN 16440 192 8 gauge gauge NN 16440 192 9 , , , 16440 192 10 cocks cock NNS 16440 192 11 , , , 16440 192 12 etc etc FW 16440 192 13 . . . 16440 193 1 It -PRON- PRP 16440 193 2 was be VBD 16440 193 3 designed design VBN 16440 193 4 for for IN 16440 193 5 a a DT 16440 193 6 working work VBG 16440 193 7 pressure pressure NN 16440 193 8 of of IN 16440 193 9 300 300 CD 16440 193 10 lb lb NN 16440 193 11 . . . 16440 193 12 , , , 16440 193 13 and and CC 16440 193 14 , , , 16440 193 15 at at IN 16440 193 16 each each DT 16440 193 17 pumping pump VBG 16440 193 18 plant plant NN 16440 193 19 , , , 16440 193 20 it -PRON- PRP 16440 193 21 has have VBZ 16440 193 22 proved prove VBN 16440 193 23 to to TO 16440 193 24 be be VB 16440 193 25 entirely entirely RB 16440 193 26 air air NN 16440 193 27 - - HYPH 16440 193 28 and and CC 16440 193 29 water water NN 16440 193 30 - - HYPH 16440 193 31 tight tight JJ 16440 193 32 . . . 16440 194 1 As as IN 16440 194 2 indicated indicate VBN 16440 194 3 by by IN 16440 194 4 sensitive sensitive JJ 16440 194 5 gauges gauge NNS 16440 194 6 on on IN 16440 194 7 the the DT 16440 194 8 pump pump NN 16440 194 9 main main JJ 16440 194 10 , , , 16440 194 11 just just RB 16440 194 12 beyond beyond IN 16440 194 13 these these DT 16440 194 14 large large JJ 16440 194 15 air air NN 16440 194 16 - - HYPH 16440 194 17 chambers chamber NNS 16440 194 18 , , , 16440 194 19 the the DT 16440 194 20 latter latter JJ 16440 194 21 absorb absorb VBP 16440 194 22 all all PDT 16440 194 23 the the DT 16440 194 24 water water NN 16440 194 25 - - HYPH 16440 194 26 hammer hammer NN 16440 194 27 which which WDT 16440 194 28 gets get VBZ 16440 194 29 beyond beyond IN 16440 194 30 the the DT 16440 194 31 air air NN 16440 194 32 - - HYPH 16440 194 33 chamber chamber NN 16440 194 34 on on IN 16440 194 35 the the DT 16440 194 36 pumps pump NNS 16440 194 37 . . . 16440 195 1 _ _ NNP 16440 195 2 Air Air NNP 16440 195 3 - - HYPH 16440 195 4 Pumps_.--Each Pumps_.--Each NNP 16440 195 5 pumping pumping NN 16440 195 6 plant plant NN 16440 195 7 is be VBZ 16440 195 8 provided provide VBN 16440 195 9 with with IN 16440 195 10 four four CD 16440 195 11 automatic automatic JJ 16440 195 12 air air NN 16440 195 13 - - HYPH 16440 195 14 charging charge VBG 16440 195 15 devices device NNS 16440 195 16 , , , 16440 195 17 connecting connect VBG 16440 195 18 to to IN 16440 195 19 all all DT 16440 195 20 air air NN 16440 195 21 - - HYPH 16440 195 22 chambers chamber NNS 16440 195 23 of of IN 16440 195 24 the the DT 16440 195 25 pumps pump NNS 16440 195 26 and and CC 16440 195 27 to to IN 16440 195 28 the the DT 16440 195 29 air air NN 16440 195 30 - - HYPH 16440 195 31 chamber chamber NN 16440 195 32 on on IN 16440 195 33 the the DT 16440 195 34 pumping pump VBG 16440 195 35 main main NN 16440 195 36 . . . 16440 196 1 They -PRON- PRP 16440 196 2 are be VBP 16440 196 3 of of IN 16440 196 4 the the DT 16440 196 5 Nordberg Nordberg NNP 16440 196 6 type type NN 16440 196 7 , , , 16440 196 8 and and CC 16440 196 9 have have VBP 16440 196 10 proved prove VBN 16440 196 11 very very RB 16440 196 12 efficient efficient JJ 16440 196 13 . . . 16440 197 1 They -PRON- PRP 16440 197 2 are be VBP 16440 197 3 operated operate VBN 16440 197 4 only only RB 16440 197 5 a a DT 16440 197 6 part part NN 16440 197 7 of of IN 16440 197 8 the the DT 16440 197 9 time time NN 16440 197 10 ; ; : 16440 197 11 otherwise otherwise RB 16440 197 12 , , , 16440 197 13 they -PRON- PRP 16440 197 14 accumulate accumulate VBP 16440 197 15 too too RB 16440 197 16 much much JJ 16440 197 17 air air NN 16440 197 18 in in IN 16440 197 19 the the DT 16440 197 20 chambers chamber NNS 16440 197 21 . . . 16440 198 1 _ _ NNP 16440 198 2 Air Air NNP 16440 198 3 - - HYPH 16440 198 4 Valves_.--On Valves_.--On NNP 16440 198 5 the the DT 16440 198 6 entire entire JJ 16440 198 7 line line NN 16440 198 8 there there EX 16440 198 9 are be VBP 16440 198 10 144 144 CD 16440 198 11 automatic automatic JJ 16440 198 12 air air NN 16440 198 13 - - HYPH 16440 198 14 valves valve NNS 16440 198 15 made make VBN 16440 198 16 by by IN 16440 198 17 the the DT 16440 198 18 United United NNP 16440 198 19 States States NNP 16440 198 20 Metal Metal NNP 16440 198 21 Manufacturing Manufacturing NNP 16440 198 22 Company Company NNP 16440 198 23 , , , 16440 198 24 of of IN 16440 198 25 Berwick Berwick NNP 16440 198 26 , , , 16440 198 27 Pa. Pennsylvania NNP 16440 199 1 They -PRON- PRP 16440 199 2 are be VBP 16440 199 3 working work VBG 16440 199 4 satisfactorily satisfactorily RB 16440 199 5 . . . 16440 200 1 _ _ NNP 16440 200 2 Gate Gate NNP 16440 200 3 - - HYPH 16440 200 4 Valves_.--In Valves_.--In NNP 16440 200 5 addition addition NN 16440 200 6 to to IN 16440 200 7 the the DT 16440 200 8 customary customary JJ 16440 200 9 gate gate NN 16440 200 10 - - : 16440 200 11 and and CC 16440 200 12 check check NN 16440 200 13 - - HYPH 16440 200 14 valves valve NNS 16440 200 15 at at IN 16440 200 16 the the DT 16440 200 17 reservoirs reservoir NNS 16440 200 18 and and CC 16440 200 19 pumping pumping NN 16440 200 20 stations station NNS 16440 200 21 , , , 16440 200 22 gate gate NN 16440 200 23 - - HYPH 16440 200 24 valves valve NNS 16440 200 25 are be VBP 16440 200 26 located locate VBN 16440 200 27 at at IN 16440 200 28 necessary necessary JJ 16440 200 29 points point NNS 16440 200 30 and and CC 16440 200 31 elevations elevation NNS 16440 200 32 in in IN 16440 200 33 the the DT 16440 200 34 line line NN 16440 200 35 to to TO 16440 200 36 control control VB 16440 200 37 the the DT 16440 200 38 flow flow NN 16440 200 39 of of IN 16440 200 40 water water NN 16440 200 41 and and CC 16440 200 42 keep keep VB 16440 200 43 the the DT 16440 200 44 pipe pipe NN 16440 200 45 full full JJ 16440 200 46 , , , 16440 200 47 even even RB 16440 200 48 to to IN 16440 200 49 the the DT 16440 200 50 extent extent NN 16440 200 51 of of IN 16440 200 52 closing close VBG 16440 200 53 all all DT 16440 200 54 such such JJ 16440 200 55 valves valve NNS 16440 200 56 tight tight RB 16440 200 57 and and CC 16440 200 58 holding hold VBG 16440 200 59 the the DT 16440 200 60 line line NN 16440 200 61 full full JJ 16440 200 62 without without IN 16440 200 63 flow flow NN 16440 200 64 . . . 16440 201 1 This this DT 16440 201 2 is be VBZ 16440 201 3 for for IN 16440 201 4 the the DT 16440 201 5 purpose purpose NN 16440 201 6 of of IN 16440 201 7 delivering deliver VBG 16440 201 8 through through IN 16440 201 9 a a DT 16440 201 10 full full JJ 16440 201 11 pipe pipe NN 16440 201 12 any any DT 16440 201 13 desired desire VBN 16440 201 14 quantity quantity NN 16440 201 15 of of IN 16440 201 16 water water NN 16440 201 17 less less JJR 16440 201 18 than than IN 16440 201 19 that that DT 16440 201 20 required require VBD 16440 201 21 to to TO 16440 201 22 keep keep VB 16440 201 23 the the DT 16440 201 24 open open JJ 16440 201 25 pipe pipe NN 16440 201 26 full full JJ 16440 201 27 . . . 16440 202 1 This this DT 16440 202 2 , , , 16440 202 3 of of IN 16440 202 4 course course NN 16440 202 5 , , , 16440 202 6 is be VBZ 16440 202 7 on on IN 16440 202 8 account account NN 16440 202 9 of of IN 16440 202 10 the the DT 16440 202 11 wood wood NN 16440 202 12 pipe pipe NN 16440 202 13 . . . 16440 203 1 As as IN 16440 203 2 the the DT 16440 203 3 differences difference NNS 16440 203 4 of of IN 16440 203 5 elevations elevation NNS 16440 203 6 are be VBP 16440 203 7 very very RB 16440 203 8 great great JJ 16440 203 9 on on IN 16440 203 10 the the DT 16440 203 11 gravity gravity NN 16440 203 12 sections section NNS 16440 203 13 of of IN 16440 203 14 the the DT 16440 203 15 line line NN 16440 203 16 , , , 16440 203 17 and and CC 16440 203 18 as as IN 16440 203 19 any any DT 16440 203 20 one one CD 16440 203 21 valve valve NN 16440 203 22 might may MD 16440 203 23 inadvertently inadvertently RB 16440 203 24 become become VB 16440 203 25 closed closed JJ 16440 203 26 tight tight RB 16440 203 27 when when WRB 16440 203 28 other other JJ 16440 203 29 valves valve NNS 16440 203 30 above above RB 16440 203 31 would would MD 16440 203 32 be be VB 16440 203 33 open open JJ 16440 203 34 , , , 16440 203 35 the the DT 16440 203 36 bursting bursting NN 16440 203 37 of of IN 16440 203 38 the the DT 16440 203 39 pipe pipe NN 16440 203 40 under under IN 16440 203 41 such such JJ 16440 203 42 conditions condition NNS 16440 203 43 is be VBZ 16440 203 44 prevented prevent VBN 16440 203 45 either either CC 16440 203 46 by by IN 16440 203 47 a a DT 16440 203 48 pressure pressure NN 16440 203 49 relief relief NN 16440 203 50 valve valve NN 16440 203 51 attached attach VBN 16440 203 52 to to IN 16440 203 53 and and CC 16440 203 54 immediately immediately RB 16440 203 55 above above IN 16440 203 56 the the DT 16440 203 57 gate gate NN 16440 203 58 - - HYPH 16440 203 59 valve valve NN 16440 203 60 , , , 16440 203 61 or or CC 16440 203 62 by by IN 16440 203 63 an an DT 16440 203 64 open open JJ 16440 203 65 stand stand NN 16440 203 66 - - HYPH 16440 203 67 pipe pipe NN 16440 203 68 erected erect VBN 16440 203 69 on on IN 16440 203 70 some some DT 16440 203 71 suitable suitable JJ 16440 203 72 elevation elevation NN 16440 203 73 between between IN 16440 203 74 the the DT 16440 203 75 valves valve NNS 16440 203 76 . . . 16440 204 1 This this DT 16440 204 2 is be VBZ 16440 204 3 more more RBR 16440 204 4 clearly clearly RB 16440 204 5 shown show VBN 16440 204 6 on on IN 16440 204 7 the the DT 16440 204 8 profile profile NN 16440 204 9 , , , 16440 204 10 Plate plate NN 16440 204 11 V V NNP 16440 204 12 , , , 16440 204 13 of of IN 16440 204 14 the the DT 16440 204 15 ground ground NN 16440 204 16 line line NN 16440 204 17 and and CC 16440 204 18 the the DT 16440 204 19 hydraulic hydraulic JJ 16440 204 20 grades grade NNS 16440 204 21 of of IN 16440 204 22 the the DT 16440 204 23 pipe pipe NN 16440 204 24 line line NN 16440 204 25 . . . 16440 205 1 An an DT 16440 205 2 inspection inspection NN 16440 205 3 of of IN 16440 205 4 this this DT 16440 205 5 profile profile NN 16440 205 6 will will MD 16440 205 7 show show VB 16440 205 8 that that IN 16440 205 9 these these DT 16440 205 10 controlling control VBG 16440 205 11 valves valve NNS 16440 205 12 are be VBP 16440 205 13 located locate VBN 16440 205 14 so so IN 16440 205 15 that that IN 16440 205 16 , , , 16440 205 17 when when WRB 16440 205 18 closed close VBN 16440 205 19 , , , 16440 205 20 the the DT 16440 205 21 pressure pressure NN 16440 205 22 against against IN 16440 205 23 them -PRON- PRP 16440 205 24 does do VBZ 16440 205 25 not not RB 16440 205 26 rise rise VB 16440 205 27 above above IN 16440 205 28 the the DT 16440 205 29 maximum maximum JJ 16440 205 30 pressure pressure NN 16440 205 31 on on IN 16440 205 32 the the DT 16440 205 33 section section NN 16440 205 34 above above RB 16440 205 35 , , , 16440 205 36 due due IN 16440 205 37 to to IN 16440 205 38 the the DT 16440 205 39 hydraulic hydraulic JJ 16440 205 40 grade grade NN 16440 205 41 of of IN 16440 205 42 the the DT 16440 205 43 line line NN 16440 205 44 when when WRB 16440 205 45 carrying carry VBG 16440 205 46 its -PRON- PRP$ 16440 205 47 full full JJ 16440 205 48 capacity capacity NN 16440 205 49 . . . 16440 206 1 _ _ NNP 16440 206 2 Safety Safety NNP 16440 206 3 Valves_.--To Valves_.--To NNP 16440 206 4 prevent prevent NN 16440 206 5 rupture rupture NN 16440 206 6 of of IN 16440 206 7 the the DT 16440 206 8 pipe pipe NN 16440 206 9 or or CC 16440 206 10 injury injury NN 16440 206 11 to to IN 16440 206 12 the the DT 16440 206 13 pumps pump NNS 16440 206 14 , , , 16440 206 15 in in IN 16440 206 16 case case NN 16440 206 17 the the DT 16440 206 18 pumping pump VBG 16440 206 19 mains main NNS 16440 206 20 should should MD 16440 206 21 become become VB 16440 206 22 obstructed obstruct VBN 16440 206 23 , , , 16440 206 24 a a DT 16440 206 25 6-in 6-in NN 16440 206 26 . . . 16440 207 1 pop pop NNP 16440 207 2 safety safety NNP 16440 207 3 valve valve NN 16440 207 4 is be VBZ 16440 207 5 mounted mount VBN 16440 207 6 on on IN 16440 207 7 the the DT 16440 207 8 main main JJ 16440 207 9 just just RB 16440 207 10 beyond beyond IN 16440 207 11 the the DT 16440 207 12 large large JJ 16440 207 13 air air NN 16440 207 14 - - HYPH 16440 207 15 chamber chamber NN 16440 207 16 already already RB 16440 207 17 described describe VBD 16440 207 18 . . . 16440 208 1 These these DT 16440 208 2 valves valve NNS 16440 208 3 are be VBP 16440 208 4 set set VBN 16440 208 5 to to TO 16440 208 6 release release VB 16440 208 7 at at IN 16440 208 8 the the DT 16440 208 9 maximum maximum JJ 16440 208 10 working work VBG 16440 208 11 pressure pressure NN 16440 208 12 of of IN 16440 208 13 the the DT 16440 208 14 pumps pump NNS 16440 208 15 when when WRB 16440 208 16 the the DT 16440 208 17 regular regular JJ 16440 208 18 quantity quantity NN 16440 208 19 of of IN 16440 208 20 water water NN 16440 208 21 is be VBZ 16440 208 22 being be VBG 16440 208 23 pumped pump VBN 16440 208 24 , , , 16440 208 25 and and CC 16440 208 26 they -PRON- PRP 16440 208 27 are be VBP 16440 208 28 piped pipe VBN 16440 208 29 to to IN 16440 208 30 the the DT 16440 208 31 adjacent adjacent JJ 16440 208 32 reservoir reservoir NN 16440 208 33 , , , 16440 208 34 so so IN 16440 208 35 that that IN 16440 208 36 there there EX 16440 208 37 is be VBZ 16440 208 38 no no DT 16440 208 39 loss loss NN 16440 208 40 from from IN 16440 208 41 them -PRON- PRP 16440 208 42 . . . 16440 209 1 _ _ NNP 16440 209 2 Check Check NNP 16440 209 3 - - HYPH 16440 209 4 Valves_.--Check valves_.--check NN 16440 209 5 - - HYPH 16440 209 6 valves valve NNS 16440 209 7 are be VBP 16440 209 8 placed place VBN 16440 209 9 in in IN 16440 209 10 the the DT 16440 209 11 pumping pump VBG 16440 209 12 main main JJ 16440 209 13 to to TO 16440 209 14 prevent prevent VB 16440 209 15 the the DT 16440 209 16 backward backward JJ 16440 209 17 flow flow NN 16440 209 18 of of IN 16440 209 19 water water NN 16440 209 20 . . . 16440 210 1 There there EX 16440 210 2 is be VBZ 16440 210 3 one one CD 16440 210 4 near near IN 16440 210 5 the the DT 16440 210 6 pumps pump NNS 16440 210 7 , , , 16440 210 8 and and CC 16440 210 9 one one CD 16440 210 10 at at IN 16440 210 11 the the DT 16440 210 12 upper upper JJ 16440 210 13 end end NN 16440 210 14 and and CC 16440 210 15 outside outside NN 16440 210 16 of of IN 16440 210 17 the the DT 16440 210 18 reservoir reservoir NN 16440 210 19 into into IN 16440 210 20 which which WDT 16440 210 21 the the DT 16440 210 22 main main JJ 16440 210 23 discharges discharge NNS 16440 210 24 . . . 16440 211 1 _ _ NNP 16440 211 2 Blow Blow NNP 16440 211 3 - - HYPH 16440 211 4 Off off RP 16440 211 5 Valves_.--These valves_.--these JJ 16440 211 6 valves valve NNS 16440 211 7 are be VBP 16440 211 8 located locate VBN 16440 211 9 in in IN 16440 211 10 all all DT 16440 211 11 material material NN 16440 211 12 valleys valley NNS 16440 211 13 or or CC 16440 211 14 depressions depression NNS 16440 211 15 . . . 16440 212 1 _ _ NNP 16440 212 2 Stand Stand NNP 16440 212 3 - - HYPH 16440 212 4 Pipes_.--Between Pipes_.--Between NNP 16440 212 5 the the DT 16440 212 6 gate gate NN 16440 212 7 - - HYPH 16440 212 8 valves valve NNS 16440 212 9 , , , 16440 212 10 at at IN 16440 212 11 certain certain JJ 16440 212 12 points point NNS 16440 212 13 where where WRB 16440 212 14 the the DT 16440 212 15 maximum maximum JJ 16440 212 16 hydraulic hydraulic JJ 16440 212 17 grade grade NN 16440 212 18 is be VBZ 16440 212 19 not not RB 16440 212 20 more more JJR 16440 212 21 than than IN 16440 212 22 60 60 CD 16440 212 23 ft ft NN 16440 212 24 . . . 16440 212 25 above above IN 16440 212 26 the the DT 16440 212 27 surface surface NN 16440 212 28 of of IN 16440 212 29 the the DT 16440 212 30 ground ground NN 16440 212 31 , , , 16440 212 32 open open JJ 16440 212 33 stand stand NN 16440 212 34 - - HYPH 16440 212 35 pipes pipe NNS 16440 212 36 are be VBP 16440 212 37 erected erect VBN 16440 212 38 . . . 16440 213 1 If if IN 16440 213 2 the the DT 16440 213 3 grade grade NN 16440 213 4 line line NN 16440 213 5 is be VBZ 16440 213 6 too too RB 16440 213 7 high high JJ 16440 213 8 , , , 16440 213 9 relief relief NN 16440 213 10 - - HYPH 16440 213 11 valves valve NNS 16440 213 12 are be VBP 16440 213 13 used use VBN 16440 213 14 , , , 16440 213 15 as as IN 16440 213 16 stated state VBN 16440 213 17 . . . 16440 214 1 Also also RB 16440 214 2 at at IN 16440 214 3 two two CD 16440 214 4 points point NNS 16440 214 5 , , , 16440 214 6 where where WRB 16440 214 7 a a DT 16440 214 8 steep steep JJ 16440 214 9 grade grade NN 16440 214 10 ends end NNS 16440 214 11 near near IN 16440 214 12 the the DT 16440 214 13 ground ground NN 16440 214 14 surface surface NN 16440 214 15 and and CC 16440 214 16 is be VBZ 16440 214 17 followed follow VBN 16440 214 18 by by IN 16440 214 19 a a DT 16440 214 20 flatter flat JJR 16440 214 21 grade grade NN 16440 214 22 , , , 16440 214 23 stand stand NN 16440 214 24 - - HYPH 16440 214 25 pipes pipe NNS 16440 214 26 are be VBP 16440 214 27 erected erect VBN 16440 214 28 . . . 16440 215 1 These these DT 16440 215 2 stand stand NN 16440 215 3 - - HYPH 16440 215 4 pipes pipe NNS 16440 215 5 are be VBP 16440 215 6 of of IN 16440 215 7 6-in 6-in CD 16440 215 8 . . . 16440 216 1 iron iron NN 16440 216 2 pipe pipe NN 16440 216 3 standing stand VBG 16440 216 4 in in IN 16440 216 5 a a DT 16440 216 6 special special JJ 16440 216 7 casting casting NN 16440 216 8 in in IN 16440 216 9 the the DT 16440 216 10 pipe pipe NN 16440 216 11 line line NN 16440 216 12 and and CC 16440 216 13 enclosed enclose VBD 16440 216 14 in in IN 16440 216 15 a a DT 16440 216 16 concrete concrete JJ 16440 216 17 base base NN 16440 216 18 . . . 16440 217 1 They -PRON- PRP 16440 217 2 are be VBP 16440 217 3 , , , 16440 217 4 of of IN 16440 217 5 course course NN 16440 217 6 , , , 16440 217 7 open open JJ 16440 217 8 at at IN 16440 217 9 the the DT 16440 217 10 top top NN 16440 217 11 , , , 16440 217 12 and and CC 16440 217 13 vary vary VBP 16440 217 14 in in IN 16440 217 15 height height NN 16440 217 16 from from IN 16440 217 17 15 15 CD 16440 217 18 to to TO 16440 217 19 60 60 CD 16440 217 20 ft ft NN 16440 217 21 . . NN 16440 217 22 , , , 16440 217 23 depending depend VBG 16440 217 24 on on IN 16440 217 25 the the DT 16440 217 26 elevation elevation NN 16440 217 27 of of IN 16440 217 28 the the DT 16440 217 29 hydraulic hydraulic JJ 16440 217 30 grade grade NN 16440 217 31 . . . 16440 218 1 They -PRON- PRP 16440 218 2 have have VBP 16440 218 3 given give VBN 16440 218 4 some some DT 16440 218 5 checks check NNS 16440 218 6 on on IN 16440 218 7 the the DT 16440 218 8 position position NN 16440 218 9 of of IN 16440 218 10 this this DT 16440 218 11 grade grade NN 16440 218 12 during during IN 16440 218 13 the the DT 16440 218 14 velocity velocity NN 16440 218 15 measurements measurement NNS 16440 218 16 hereinafter hereinafter NN 16440 218 17 described describe VBN 16440 218 18 . . . 16440 219 1 Their -PRON- PRP$ 16440 219 2 locations location NNS 16440 219 3 are be VBP 16440 219 4 shown show VBN 16440 219 5 on on IN 16440 219 6 the the DT 16440 219 7 profile profile NN 16440 219 8 , , , 16440 219 9 Plate Plate NNP 16440 219 10 V. V. NNP 16440 219 11 _ _ NNP 16440 219 12 Nogal Nogal NNP 16440 219 13 Reservoir_.--Nogal Reservoir_.--Nogal NNP 16440 219 14 Reservoir Reservoir NNP 16440 219 15 is be VBZ 16440 219 16 the the DT 16440 219 17 storage storage NN 16440 219 18 unit unit NN 16440 219 19 of of IN 16440 219 20 the the DT 16440 219 21 system system NN 16440 219 22 , , , 16440 219 23 and and CC 16440 219 24 is be VBZ 16440 219 25 on on IN 16440 219 26 the the DT 16440 219 27 north north NN 16440 219 28 edge edge NN 16440 219 29 of of IN 16440 219 30 a a DT 16440 219 31 table table NN 16440 219 32 - - HYPH 16440 219 33 land land NN 16440 219 34 , , , 16440 219 35 1,700 1,700 CD 16440 219 36 ft ft NN 16440 219 37 . . . 16440 219 38 above above IN 16440 219 39 the the DT 16440 219 40 railway railway NN 16440 219 41 , , , 16440 219 42 on on IN 16440 219 43 the the DT 16440 219 44 Carrizozo Carrizozo NNP 16440 219 45 plain plain NN 16440 219 46 , , , 16440 219 47 15 15 CD 16440 219 48 miles mile NNS 16440 219 49 away away RB 16440 219 50 . . . 16440 220 1 It -PRON- PRP 16440 220 2 is be VBZ 16440 220 3 11 11 CD 16440 220 4 - - SYM 16440 220 5 1/2 1/2 CD 16440 220 6 miles mile NNS 16440 220 7 from from IN 16440 220 8 the the DT 16440 220 9 head head NN 16440 220 10 of of IN 16440 220 11 the the DT 16440 220 12 pipe pipe NN 16440 220 13 on on IN 16440 220 14 Bonito Bonito NNP 16440 220 15 Creek Creek NNP 16440 220 16 . . . 16440 221 1 This this DT 16440 221 2 reservoir reservoir NN 16440 221 3 is be VBZ 16440 221 4 a a DT 16440 221 5 natural natural JJ 16440 221 6 basin basin NN 16440 221 7 or or CC 16440 221 8 bowl bowl NN 16440 221 9 , , , 16440 221 10 1/2 1/2 CD 16440 221 11 mile mile NN 16440 221 12 in in IN 16440 221 13 diameter diameter NN 16440 221 14 across across IN 16440 221 15 the the DT 16440 221 16 top top NN 16440 221 17 , , , 16440 221 18 1/4 1/4 CD 16440 221 19 mile mile NN 16440 221 20 on on IN 16440 221 21 the the DT 16440 221 22 bottom bottom NN 16440 221 23 , , , 16440 221 24 and and CC 16440 221 25 36 36 CD 16440 221 26 ft ft NN 16440 221 27 . . RB 16440 221 28 deep deep JJ 16440 221 29 . . . 16440 222 1 A a DT 16440 222 2 level level NN 16440 222 3 line line NN 16440 222 4 , , , 16440 222 5 1,500 1,500 CD 16440 222 6 ft ft NN 16440 222 7 . . NNP 16440 222 8 long long RB 16440 222 9 , , , 16440 222 10 drawn draw VBN 16440 222 11 from from IN 16440 222 12 its -PRON- PRP$ 16440 222 13 bottom bottom NN 16440 222 14 , , , 16440 222 15 comes come VBZ 16440 222 16 out out RP 16440 222 17 to to TO 16440 222 18 grade grade VB 16440 222 19 on on IN 16440 222 20 the the DT 16440 222 21 north north JJ 16440 222 22 declivity declivity NN 16440 222 23 of of IN 16440 222 24 the the DT 16440 222 25 table table NN 16440 222 26 - - HYPH 16440 222 27 land land NN 16440 222 28 . . . 16440 223 1 On on IN 16440 223 2 this this DT 16440 223 3 level level NN 16440 223 4 line line NN 16440 223 5 an an DT 16440 223 6 open open JJ 16440 223 7 cut cut NN 16440 223 8 was be VBD 16440 223 9 made make VBN 16440 223 10 and and CC 16440 223 11 the the DT 16440 223 12 outlet outlet NN 16440 223 13 pipe pipe NN 16440 223 14 laid lay VBD 16440 223 15 . . . 16440 224 1 The the DT 16440 224 2 cut cut NN 16440 224 3 was be VBD 16440 224 4 then then RB 16440 224 5 closed close VBN 16440 224 6 by by IN 16440 224 7 a a DT 16440 224 8 dam dam NN 16440 224 9 . . . 16440 225 1 The the DT 16440 225 2 supply supply NN 16440 225 3 pipe pipe NN 16440 225 4 from from IN 16440 225 5 Bonito Bonito NNP 16440 225 6 Creek Creek NNP 16440 225 7 delivers deliver VBZ 16440 225 8 water water NN 16440 225 9 into into IN 16440 225 10 the the DT 16440 225 11 basin basin NN 16440 225 12 over over IN 16440 225 13 the the DT 16440 225 14 top top NN 16440 225 15 of of IN 16440 225 16 its -PRON- PRP$ 16440 225 17 southern southern JJ 16440 225 18 rim rim NN 16440 225 19 , , , 16440 225 20 the the DT 16440 225 21 water water NN 16440 225 22 , , , 16440 225 23 as as IN 16440 225 24 it -PRON- PRP 16440 225 25 leaves leave VBZ 16440 225 26 the the DT 16440 225 27 pipe pipe NN 16440 225 28 , , , 16440 225 29 flowing flow VBG 16440 225 30 over over IN 16440 225 31 a a DT 16440 225 32 standard standard JJ 16440 225 33 weir weir NN 16440 225 34 , , , 16440 225 35 without without IN 16440 225 36 end end NN 16440 225 37 contractions contraction NNS 16440 225 38 , , , 16440 225 39 into into IN 16440 225 40 a a DT 16440 225 41 stone stone NN 16440 225 42 gutter gutter NN 16440 225 43 . . . 16440 226 1 A a DT 16440 226 2 by by IN 16440 226 3 - - HYPH 16440 226 4 pass pass NN 16440 226 5 pipe pipe NN 16440 226 6 , , , 16440 226 7 with with IN 16440 226 8 suitable suitable JJ 16440 226 9 valves valve NNS 16440 226 10 , , , 16440 226 11 passes pass VBZ 16440 226 12 around around IN 16440 226 13 the the DT 16440 226 14 western western JJ 16440 226 15 side side NN 16440 226 16 of of IN 16440 226 17 the the DT 16440 226 18 basin basin NN 16440 226 19 and and CC 16440 226 20 connects connect NNS 16440 226 21 to to IN 16440 226 22 the the DT 16440 226 23 outlet outlet NN 16440 226 24 pipe pipe NN 16440 226 25 . . . 16440 227 1 This this DT 16440 227 2 comparatively comparatively RB 16440 227 3 small small JJ 16440 227 4 amount amount NN 16440 227 5 of of IN 16440 227 6 work work NN 16440 227 7 equipped equip VBD 16440 227 8 a a DT 16440 227 9 very very RB 16440 227 10 good good JJ 16440 227 11 natural natural JJ 16440 227 12 reservoir reservoir NN 16440 227 13 with with IN 16440 227 14 a a DT 16440 227 15 capacity capacity NN 16440 227 16 of of IN 16440 227 17 422,000,000 422,000,000 CD 16440 227 18 gal gal NNP 16440 227 19 . . NNP 16440 227 20 , , , 16440 227 21 which which WDT 16440 227 22 can can MD 16440 227 23 be be VB 16440 227 24 increased increase VBN 16440 227 25 to to IN 16440 227 26 1,000,000,000 1,000,000,000 CD 16440 227 27 gal gal NNP 16440 227 28 . . . 16440 228 1 by by IN 16440 228 2 embankments embankment NNS 16440 228 3 across across IN 16440 228 4 low low JJ 16440 228 5 places place NNS 16440 228 6 in in IN 16440 228 7 the the DT 16440 228 8 rim rim NN 16440 228 9 . . . 16440 229 1 _ _ NNP 16440 229 2 Service Service NNP 16440 229 3 Reservoirs_.--At Reservoirs_.--At NNP 16440 229 4 Coyote Coyote NNP 16440 229 5 , , , 16440 229 6 an an DT 16440 229 7 artificial artificial JJ 16440 229 8 service service NN 16440 229 9 reservoir reservoir NN 16440 229 10 , , , 16440 229 11 100 100 CD 16440 229 12 by by IN 16440 229 13 200 200 CD 16440 229 14 ft ft NN 16440 229 15 . . NNP 16440 229 16 on on IN 16440 229 17 the the DT 16440 229 18 bottom bottom NN 16440 229 19 , , , 16440 229 20 with with IN 16440 229 21 slopes slope NNS 16440 229 22 of of IN 16440 229 23 1 1 CD 16440 229 24 - - SYM 16440 229 25 1/2 1/2 CD 16440 229 26 on on IN 16440 229 27 1 1 CD 16440 229 28 and and CC 16440 229 29 a a DT 16440 229 30 total total JJ 16440 229 31 depth depth NN 16440 229 32 of of IN 16440 229 33 15 15 CD 16440 229 34 ft ft NN 16440 229 35 . . NNP 16440 229 36 , , , 16440 229 37 serves serve VBZ 16440 229 38 as as IN 16440 229 39 an an DT 16440 229 40 equalizer equalizer NN 16440 229 41 of of IN 16440 229 42 the the DT 16440 229 43 flow flow NN 16440 229 44 to to IN 16440 229 45 and and CC 16440 229 46 away away RB 16440 229 47 from from IN 16440 229 48 the the DT 16440 229 49 pumps pump NNS 16440 229 50 at at IN 16440 229 51 that that DT 16440 229 52 point point NN 16440 229 53 . . . 16440 230 1 The the DT 16440 230 2 pump pump NN 16440 230 3 - - HYPH 16440 230 4 house house NN 16440 230 5 is be VBZ 16440 230 6 built build VBN 16440 230 7 alongside alongside IN 16440 230 8 this this DT 16440 230 9 reservoir reservoir NN 16440 230 10 . . . 16440 231 1 The the DT 16440 231 2 delivery delivery NN 16440 231 3 pipe pipe NN 16440 231 4 from from IN 16440 231 5 the the DT 16440 231 6 Nogal Nogal NNP 16440 231 7 Reservoir Reservoir NNP 16440 231 8 runs run VBZ 16440 231 9 directly directly RB 16440 231 10 to to IN 16440 231 11 the the DT 16440 231 12 pumps pump NNS 16440 231 13 , , , 16440 231 14 but but CC 16440 231 15 has have VBZ 16440 231 16 a a DT 16440 231 17 tee tee NN 16440 231 18 - - HYPH 16440 231 19 branch branch NN 16440 231 20 , , , 16440 231 21 50 50 CD 16440 231 22 ft ft NN 16440 231 23 . . NNP 16440 231 24 long long RB 16440 231 25 , , , 16440 231 26 into into IN 16440 231 27 the the DT 16440 231 28 Coyote Coyote NNP 16440 231 29 Reservoir Reservoir NNP 16440 231 30 . . . 16440 232 1 This this DT 16440 232 2 branch branch NN 16440 232 3 passes pass VBZ 16440 232 4 through through IN 16440 232 5 a a DT 16440 232 6 valve valve NN 16440 232 7 chamber chamber NN 16440 232 8 between between IN 16440 232 9 the the DT 16440 232 10 pump pump NN 16440 232 11 - - HYPH 16440 232 12 house house NN 16440 232 13 and and CC 16440 232 14 the the DT 16440 232 15 reservoir reservoir NN 16440 232 16 . . . 16440 233 1 In in IN 16440 233 2 this this DT 16440 233 3 chamber chamber NN 16440 233 4 there there EX 16440 233 5 are be VBP 16440 233 6 controlling control VBG 16440 233 7 valves valve NNS 16440 233 8 and and CC 16440 233 9 an an DT 16440 233 10 automatic automatic JJ 16440 233 11 overflow overflow NN 16440 233 12 . . . 16440 234 1 This this DT 16440 234 2 overflow overflow NN 16440 234 3 is be VBZ 16440 234 4 provided provide VBN 16440 234 5 against against IN 16440 234 6 the the DT 16440 234 7 contingency contingency NN 16440 234 8 of of IN 16440 234 9 a a DT 16440 234 10 full full JJ 16440 234 11 reservoir reservoir NN 16440 234 12 and and CC 16440 234 13 idle idle JJ 16440 234 14 pumps pump NNS 16440 234 15 . . . 16440 235 1 If if IN 16440 235 2 the the DT 16440 235 3 pipe pipe NN 16440 235 4 line line NN 16440 235 5 is be VBZ 16440 235 6 delivering deliver VBG 16440 235 7 water water NN 16440 235 8 faster fast RBR 16440 235 9 than than IN 16440 235 10 the the DT 16440 235 11 pumps pump NNS 16440 235 12 discharge discharge VBP 16440 235 13 it -PRON- PRP 16440 235 14 , , , 16440 235 15 the the DT 16440 235 16 surplus surplus NN 16440 235 17 goes go VBZ 16440 235 18 into into IN 16440 235 19 the the DT 16440 235 20 reservoir reservoir NN 16440 235 21 . . . 16440 236 1 This this DT 16440 236 2 arrangement arrangement NN 16440 236 3 is be VBZ 16440 236 4 self self NN 16440 236 5 - - HYPH 16440 236 6 acting act VBG 16440 236 7 and and CC 16440 236 8 controlling controlling NN 16440 236 9 . . . 16440 237 1 There there EX 16440 237 2 is be VBZ 16440 237 3 a a DT 16440 237 4 similar similar JJ 16440 237 5 arrangement arrangement NN 16440 237 6 at at IN 16440 237 7 the the DT 16440 237 8 Luna Luna NNP 16440 237 9 pumping pumping NN 16440 237 10 plant plant NN 16440 237 11 , , , 16440 237 12 also also RB 16440 237 13 at at IN 16440 237 14 the the DT 16440 237 15 Carrizozo Carrizozo NNP 16440 237 16 service service NN 16440 237 17 reservoir reservoir NN 16440 237 18 , , , 16440 237 19 and and CC 16440 237 20 at at IN 16440 237 21 the the DT 16440 237 22 regulating regulating NN 16440 237 23 reservoir reservoir NN 16440 237 24 on on IN 16440 237 25 the the DT 16440 237 26 Corona Corona NNP 16440 237 27 summit summit NN 16440 237 28 . . . 16440 238 1 Each each DT 16440 238 2 of of IN 16440 238 3 the the DT 16440 238 4 four four CD 16440 238 5 service service NN 16440 238 6 reservoirs reservoir NNS 16440 238 7 is be VBZ 16440 238 8 of of IN 16440 238 9 the the DT 16440 238 10 same same JJ 16440 238 11 size size NN 16440 238 12 , , , 16440 238 13 and and CC 16440 238 14 lined line VBD 16440 238 15 with with IN 16440 238 16 4 4 CD 16440 238 17 in in IN 16440 238 18 . . . 16440 239 1 of of IN 16440 239 2 1:2:4 1:2:4 CD 16440 239 3 concrete concrete NN 16440 239 4 . . . 16440 240 1 At at IN 16440 240 2 Luna Luna NNP 16440 240 3 and and CC 16440 240 4 Corona Corona NNP 16440 240 5 the the DT 16440 240 6 concrete concrete NN 16440 240 7 is be VBZ 16440 240 8 reinforced reinforce VBN 16440 240 9 with with IN 16440 240 10 3/8-in 3/8-in NNP 16440 240 11 . . . 16440 241 1 round round JJ 16440 241 2 rods rod NNS 16440 241 3 spaced space VBD 16440 241 4 12 12 CD 16440 241 5 in in IN 16440 241 6 . . . 16440 242 1 from from IN 16440 242 2 center center NN 16440 242 3 to to IN 16440 242 4 center center NN 16440 242 5 , , , 16440 242 6 both both DT 16440 242 7 ways way NNS 16440 242 8 . . . 16440 243 1 This this DT 16440 243 2 reinforcement reinforcement NN 16440 243 3 should should MD 16440 243 4 have have VB 16440 243 5 been be VBN 16440 243 6 used use VBN 16440 243 7 in in IN 16440 243 8 all all PDT 16440 243 9 the the DT 16440 243 10 work work NN 16440 243 11 . . . 16440 244 1 _ _ NNP 16440 244 2 Pumping Pumping NNP 16440 244 3 Plants_.--The plants_.--the POS 16440 244 4 pumps pump NNS 16440 244 5 at at IN 16440 244 6 Coyote Coyote NNP 16440 244 7 and and CC 16440 244 8 Luna Luna NNP 16440 244 9 are be VBP 16440 244 10 Nordberg Nordberg NNP 16440 244 11 duplex duplex NN 16440 244 12 , , , 16440 244 13 cross cross JJ 16440 244 14 - - JJ 16440 244 15 compound compound JJ 16440 244 16 , , , 16440 244 17 condensing condensing NN 16440 244 18 , , , 16440 244 19 crank crank NNP 16440 244 20 - - HYPH 16440 244 21 and and CC 16440 244 22 - - HYPH 16440 244 23 fly fly VB 16440 244 24 - - HYPH 16440 244 25 wheel wheel NN 16440 244 26 machines machine NNS 16440 244 27 , , , 16440 244 28 with with IN 16440 244 29 6-in 6-in CD 16440 244 30 . . . 16440 245 1 plungers plunger NNS 16440 245 2 , , , 16440 245 3 traveling travel VBG 16440 245 4 600 600 CD 16440 245 5 ft ft NN 16440 245 6 . . NNP 16440 245 7 per per IN 16440 245 8 min min NNP 16440 245 9 . . . 16440 246 1 at at IN 16440 246 2 full full JJ 16440 246 3 normal normal JJ 16440 246 4 speed speed NN 16440 246 5 , , , 16440 246 6 and and CC 16440 246 7 designed design VBN 16440 246 8 to to TO 16440 246 9 work work VB 16440 246 10 against against IN 16440 246 11 300 300 CD 16440 246 12 lb lb NN 16440 246 13 . . . 16440 247 1 per per IN 16440 247 2 sq sq NNP 16440 247 3 . . . 16440 248 1 in in IN 16440 248 2 . . . 16440 249 1 They -PRON- PRP 16440 249 2 have have VBP 16440 249 3 a a DT 16440 249 4 guaranteed guarantee VBN 16440 249 5 efficiency efficiency NN 16440 249 6 of of IN 16440 249 7 135,000,000 135,000,000 CD 16440 249 8 ft ft NNS 16440 249 9 - - HYPH 16440 249 10 lb lb JJ 16440 249 11 . . . 16440 250 1 per per IN 16440 250 2 1000 1000 CD 16440 250 3 lb lb XX 16440 250 4 . . . 16440 251 1 of of IN 16440 251 2 steam steam NN 16440 251 3 at at IN 16440 251 4 150 150 CD 16440 251 5 lb lb RB 16440 251 6 . . . 16440 252 1 and and CC 16440 252 2 superheated superheate VBD 16440 252 3 75 75 CD 16440 252 4 degrees degree NNS 16440 252 5 . . . 16440 253 1 The the DT 16440 253 2 boilers boiler NNS 16440 253 3 are be VBP 16440 253 4 125-h.p 125-h.p CD 16440 253 5 . . NNS 16440 253 6 , , , 16440 253 7 Sterling sterling NN 16440 253 8 , , , 16440 253 9 water water NN 16440 253 10 - - HYPH 16440 253 11 tube tube NN 16440 253 12 , , , 16440 253 13 with with IN 16440 253 14 Foster foster JJ 16440 253 15 superheaters superheater NNS 16440 253 16 , , , 16440 253 17 and and CC 16440 253 18 33-in 33-in NNP 16440 253 19 . . . 16440 254 1 stacks stacks NNP 16440 254 2 , , , 16440 254 3 100 100 CD 16440 254 4 ft ft NN 16440 254 5 . . NNP 16440 254 6 high high JJ 16440 254 7 . . . 16440 255 1 Each each DT 16440 255 2 plant plant NN 16440 255 3 is be VBZ 16440 255 4 in in IN 16440 255 5 complete complete JJ 16440 255 6 duplicate duplicate JJ 16440 255 7 pump pump NN 16440 255 8 and and CC 16440 255 9 boiler boiler NN 16440 255 10 units unit NNS 16440 255 11 , , , 16440 255 12 only only RB 16440 255 13 one one CD 16440 255 14 set set NN 16440 255 15 working work VBG 16440 255 16 at at IN 16440 255 17 a a DT 16440 255 18 time time NN 16440 255 19 . . . 16440 256 1 The the DT 16440 256 2 pump pump NN 16440 256 3 building building NN 16440 256 4 is be VBZ 16440 256 5 a a DT 16440 256 6 substantial substantial JJ 16440 256 7 concrete concrete NN 16440 256 8 , , , 16440 256 9 brick brick NN 16440 256 10 , , , 16440 256 11 and and CC 16440 256 12 steel steel NN 16440 256 13 structure structure NN 16440 256 14 , , , 16440 256 15 50 50 CD 16440 256 16 by by IN 16440 256 17 80 80 CD 16440 256 18 ft ft NN 16440 256 19 . . NNP 16440 256 20 in in IN 16440 256 21 plan plan NN 16440 256 22 , , , 16440 256 23 with with IN 16440 256 24 a a DT 16440 256 25 fire fire NN 16440 256 26 - - HYPH 16440 256 27 wall wall NN 16440 256 28 , , , 16440 256 29 with with IN 16440 256 30 two two CD 16440 256 31 steel steel NN 16440 256 32 doors door NNS 16440 256 33 dividing divide VBG 16440 256 34 the the DT 16440 256 35 floor floor NN 16440 256 36 space space NN 16440 256 37 into into IN 16440 256 38 an an DT 16440 256 39 engine engine NN 16440 256 40 - - HYPH 16440 256 41 room room NN 16440 256 42 50 50 CD 16440 256 43 by by IN 16440 256 44 50 50 CD 16440 256 45 ft ft NN 16440 256 46 . . NNP 16440 256 47 , , , 16440 256 48 and and CC 16440 256 49 a a DT 16440 256 50 boiler boiler NN 16440 256 51 - - HYPH 16440 256 52 room room NN 16440 256 53 50 50 CD 16440 256 54 by by IN 16440 256 55 30 30 CD 16440 256 56 ft ft NN 16440 256 57 . . . 16440 256 58 A a DT 16440 256 59 concrete concrete JJ 16440 256 60 coal coal NN 16440 256 61 - - HYPH 16440 256 62 bin bin NNP 16440 256 63 adjoins adjoin VBZ 16440 256 64 the the DT 16440 256 65 exterior exterior NNP 16440 256 66 boiler boiler NN 16440 256 67 - - HYPH 16440 256 68 room room NN 16440 256 69 door door NN 16440 256 70 . . . 16440 257 1 Coal coal NN 16440 257 2 is be VBZ 16440 257 3 delivered deliver VBN 16440 257 4 directly directly RB 16440 257 5 from from IN 16440 257 6 the the DT 16440 257 7 car car NN 16440 257 8 to to IN 16440 257 9 the the DT 16440 257 10 bin bin NN 16440 257 11 . . . 16440 258 1 The the DT 16440 258 2 plant plant NN 16440 258 3 is be VBZ 16440 258 4 lighted light VBN 16440 258 5 by by IN 16440 258 6 a a DT 16440 258 7 small small JJ 16440 258 8 , , , 16440 258 9 but but CC 16440 258 10 very very RB 16440 258 11 complete complete JJ 16440 258 12 , , , 16440 258 13 engine engine NN 16440 258 14 and and CC 16440 258 15 dynamo dynamo NN 16440 258 16 on on IN 16440 258 17 one one CD 16440 258 18 base base NN 16440 258 19 and and CC 16440 258 20 run run VBN 16440 258 21 by by IN 16440 258 22 steam steam NN 16440 258 23 from from IN 16440 258 24 the the DT 16440 258 25 Sterling Sterling NNP 16440 258 26 boilers boiler NNS 16440 258 27 . . . 16440 259 1 The the DT 16440 259 2 two two CD 16440 259 3 plants plant NNS 16440 259 4 are be VBP 16440 259 5 exactly exactly RB 16440 259 6 alike alike RB 16440 259 7 throughout throughout IN 16440 259 8 . . . 16440 260 1 _ _ NNP 16440 260 2 Reservoir Reservoir NNP 16440 260 3 Leakage_.--The leakage_.--the IN 16440 260 4 Nogal Nogal NNP 16440 260 5 Reservoir Reservoir NNP 16440 260 6 basin basin NN 16440 260 7 is be VBZ 16440 260 8 covered cover VBN 16440 260 9 with with IN 16440 260 10 from from IN 16440 260 11 2 2 CD 16440 260 12 to to IN 16440 260 13 5 5 CD 16440 260 14 ft ft NN 16440 260 15 . . NN 16440 260 16 of of IN 16440 260 17 good good JJ 16440 260 18 clay clay NN 16440 260 19 , , , 16440 260 20 except except IN 16440 260 21 where where WRB 16440 260 22 it -PRON- PRP 16440 260 23 is be VBZ 16440 260 24 punctured puncture VBN 16440 260 25 by by IN 16440 260 26 a a DT 16440 260 27 dike dike NN 16440 260 28 , , , 16440 260 29 or or CC 16440 260 30 washed wash VBD 16440 260 31 down down RP 16440 260 32 to to IN 16440 260 33 the the DT 16440 260 34 underlying underlie VBG 16440 260 35 sandstone sandstone NN 16440 260 36 by by IN 16440 260 37 a a DT 16440 260 38 few few JJ 16440 260 39 gullies gully NNS 16440 260 40 . . . 16440 261 1 These these DT 16440 261 2 punctures puncture NNS 16440 261 3 or or CC 16440 261 4 washes wash NNS 16440 261 5 were be VBD 16440 261 6 covered cover VBN 16440 261 7 or or CC 16440 261 8 filled fill VBN 16440 261 9 with with IN 16440 261 10 clay clay NN 16440 261 11 from from IN 16440 261 12 1 1 CD 16440 261 13 to to IN 16440 261 14 4 4 CD 16440 261 15 ft ft NN 16440 261 16 . . NN 16440 261 17 deep deep JJ 16440 261 18 . . . 16440 262 1 During during IN 16440 262 2 the the DT 16440 262 3 first first JJ 16440 262 4 season season NN 16440 262 5 the the DT 16440 262 6 leakage leakage NN 16440 262 7 , , , 16440 262 8 above above IN 16440 262 9 the the DT 16440 262 10 6-ft 6-ft NNP 16440 262 11 . . . 16440 262 12 contour contour NNP 16440 262 13 , , , 16440 262 14 was be VBD 16440 262 15 at at IN 16440 262 16 the the DT 16440 262 17 rate rate NN 16440 262 18 of of IN 16440 262 19 2 2 CD 16440 262 20 in in IN 16440 262 21 . . . 16440 263 1 per per IN 16440 263 2 day day NN 16440 263 3 . . . 16440 264 1 As as IN 16440 264 2 the the DT 16440 264 3 water water NN 16440 264 4 fell fall VBD 16440 264 5 , , , 16440 264 6 due due IN 16440 264 7 to to IN 16440 264 8 leakage leakage NN 16440 264 9 , , , 16440 264 10 evaporation evaporation NN 16440 264 11 , , , 16440 264 12 and and CC 16440 264 13 use use NN 16440 264 14 , , , 16440 264 15 a a DT 16440 264 16 herd herd NN 16440 264 17 of of IN 16440 264 18 from from IN 16440 264 19 300 300 CD 16440 264 20 to to TO 16440 264 21 400 400 CD 16440 264 22 cattle cattle NNS 16440 264 23 were be VBD 16440 264 24 worked work VBN 16440 264 25 around around IN 16440 264 26 the the DT 16440 264 27 shore shore NN 16440 264 28 line line NN 16440 264 29 . . . 16440 265 1 This this DT 16440 265 2 reduced reduce VBD 16440 265 3 the the DT 16440 265 4 leakage leakage NN 16440 265 5 to to IN 16440 265 6 3/8 3/8 CD 16440 265 7 in in IN 16440 265 8 . . . 16440 266 1 below below IN 16440 266 2 8 8 CD 16440 266 3 ft ft NN 16440 266 4 . . NNP 16440 266 5 , , , 16440 266 6 and and CC 16440 266 7 to to IN 16440 266 8 nothing nothing NN 16440 266 9 below below IN 16440 266 10 6 6 CD 16440 266 11 ft ft NN 16440 266 12 . . NNP 16440 266 13 , , , 16440 266 14 above above IN 16440 266 15 the the DT 16440 266 16 outlet outlet NN 16440 266 17 . . . 16440 267 1 As as IN 16440 267 2 the the DT 16440 267 3 flow flow NN 16440 267 4 line line NN 16440 267 5 rises rise VBZ 16440 267 6 higher high JJR 16440 267 7 each each DT 16440 267 8 season season NN 16440 267 9 , , , 16440 267 10 the the DT 16440 267 11 puddling puddling NN 16440 267 12 will will MD 16440 267 13 be be VB 16440 267 14 continued continue VBN 16440 267 15 to to IN 16440 267 16 the the DT 16440 267 17 top top NN 16440 267 18 . . . 16440 268 1 The the DT 16440 268 2 leakage leakage NN 16440 268 3 at at IN 16440 268 4 12 12 CD 16440 268 5 ft ft NN 16440 268 6 . . . 16440 268 7 above above IN 16440 268 8 the the DT 16440 268 9 outlet outlet NN 16440 268 10 , , , 16440 268 11 or or CC 16440 268 12 17 17 CD 16440 268 13 ft ft NN 16440 268 14 . . NN 16440 268 15 above above IN 16440 268 16 the the DT 16440 268 17 bottom bottom NN 16440 268 18 , , , 16440 268 19 is be VBZ 16440 268 20 still still RB 16440 268 21 approximately approximately RB 16440 268 22 1 1 CD 16440 268 23 in in IN 16440 268 24 . . . 16440 269 1 per per IN 16440 269 2 day day NN 16440 269 3 . . . 16440 270 1 The the DT 16440 270 2 total total JJ 16440 270 3 puddling puddling NN 16440 270 4 , , , 16440 270 5 to to IN 16440 270 6 date date NN 16440 270 7 , , , 16440 270 8 covering cover VBG 16440 270 9 two two CD 16440 270 10 seasons season NNS 16440 270 11 , , , 16440 270 12 is be VBZ 16440 270 13 equivalent equivalent JJ 16440 270 14 to to IN 16440 270 15 11,150 11,150 CD 16440 270 16 days day NNS 16440 270 17 ' ' POS 16440 270 18 work work NN 16440 270 19 of of IN 16440 270 20 one one CD 16440 270 21 cow cow NN 16440 270 22 , , , 16440 270 23 and and CC 16440 270 24 covers cover VBZ 16440 270 25 an an DT 16440 270 26 area area NN 16440 270 27 of of IN 16440 270 28 1,500,000 1,500,000 CD 16440 270 29 sq sq NN 16440 270 30 . . . 16440 271 1 ft ft IN 16440 271 2 . . . 16440 272 1 The the DT 16440 272 2 clay clay NN 16440 272 3 packed pack VBD 16440 272 4 densely densely RB 16440 272 5 , , , 16440 272 6 the the DT 16440 272 7 final final JJ 16440 272 8 hoof hoof NN 16440 272 9 marks mark NNS 16440 272 10 being be VBG 16440 272 11 not not RB 16440 272 12 more more JJR 16440 272 13 than than IN 16440 272 14 1/4 1/4 CD 16440 272 15 in in IN 16440 272 16 . . . 16440 273 1 deep deep JJ 16440 273 2 and and CC 16440 273 3 remaining remain VBG 16440 273 4 distinct distinct JJ 16440 273 5 under under IN 16440 273 6 the the DT 16440 273 7 water water NN 16440 273 8 around around IN 16440 273 9 the the DT 16440 273 10 shore shore NN 16440 273 11 line line NN 16440 273 12 for for IN 16440 273 13 one one CD 16440 273 14 year year NN 16440 273 15 . . . 16440 274 1 Apparently apparently RB 16440 274 2 , , , 16440 274 3 the the DT 16440 274 4 reservoir reservoir NN 16440 274 5 will will MD 16440 274 6 finally finally RB 16440 274 7 become become VB 16440 274 8 water water NN 16440 274 9 - - HYPH 16440 274 10 tight tight JJ 16440 274 11 at at IN 16440 274 12 all all DT 16440 274 13 elevations elevation NNS 16440 274 14 . . . 16440 275 1 The the DT 16440 275 2 soil soil NN 16440 275 3 in in IN 16440 275 4 which which WDT 16440 275 5 the the DT 16440 275 6 four four CD 16440 275 7 service service NN 16440 275 8 reservoirs reservoir NNS 16440 275 9 on on IN 16440 275 10 the the DT 16440 275 11 railway railway NN 16440 275 12 are be VBP 16440 275 13 built build VBN 16440 275 14 proved prove VBN 16440 275 15 to to TO 16440 275 16 be be VB 16440 275 17 about about IN 16440 275 18 the the DT 16440 275 19 worst bad JJS 16440 275 20 for for IN 16440 275 21 such such JJ 16440 275 22 work work NN 16440 275 23 . . . 16440 276 1 In in IN 16440 276 2 its -PRON- PRP$ 16440 276 3 natural natural JJ 16440 276 4 state state NN 16440 276 5 on on IN 16440 276 6 the the DT 16440 276 7 prairie prairie NN 16440 276 8 , , , 16440 276 9 after after IN 16440 276 10 the the DT 16440 276 11 excavation excavation NN 16440 276 12 for for IN 16440 276 13 the the DT 16440 276 14 reservoir reservoir NN 16440 276 15 was be VBD 16440 276 16 completed complete VBN 16440 276 17 , , , 16440 276 18 it -PRON- PRP 16440 276 19 filtered filter VBD 16440 276 20 water water NN 16440 276 21 at at IN 16440 276 22 the the DT 16440 276 23 rate rate NN 16440 276 24 of of IN 16440 276 25 3 3 CD 16440 276 26 ft ft NN 16440 276 27 . . NNP 16440 276 28 per per IN 16440 276 29 day day NN 16440 276 30 . . . 16440 277 1 Tamping tamp VBG 16440 277 2 and and CC 16440 277 3 puddling puddling NN 16440 277 4 still still RB 16440 277 5 left leave VBD 16440 277 6 a a DT 16440 277 7 filtration filtration NN 16440 277 8 of of IN 16440 277 9 12 12 CD 16440 277 10 in in IN 16440 277 11 . . . 16440 278 1 per per IN 16440 278 2 day day NN 16440 278 3 , , , 16440 278 4 with with IN 16440 278 5 a a DT 16440 278 6 tendency tendency NN 16440 278 7 to to TO 16440 278 8 increase increase VB 16440 278 9 . . . 16440 279 1 Enough enough JJ 16440 279 2 water water NN 16440 279 3 filtered filter VBN 16440 279 4 through through IN 16440 279 5 the the DT 16440 279 6 concrete concrete NN 16440 279 7 to to TO 16440 279 8 produce produce VB 16440 279 9 settlement settlement NN 16440 279 10 and and CC 16440 279 11 cracks crack NNS 16440 279 12 . . . 16440 280 1 Finally finally RB 16440 280 2 , , , 16440 280 3 the the DT 16440 280 4 concrete concrete NN 16440 280 5 was be VBD 16440 280 6 water water NN 16440 280 7 - - HYPH 16440 280 8 proofed proof VBN 16440 280 9 with with IN 16440 280 10 two two CD 16440 280 11 coats coat NNS 16440 280 12 of of IN 16440 280 13 soap soap NN 16440 280 14 , , , 16440 280 15 two two CD 16440 280 16 of of IN 16440 280 17 alum alum NN 16440 280 18 , , , 16440 280 19 and and CC 16440 280 20 one one CD 16440 280 21 of of IN 16440 280 22 asphalt asphalt NN 16440 280 23 . . . 16440 281 1 This this DT 16440 281 2 has have VBZ 16440 281 3 made make VBN 16440 281 4 all all PDT 16440 281 5 the the DT 16440 281 6 reservoirs reservoir NNS 16440 281 7 water water NN 16440 281 8 - - HYPH 16440 281 9 tight tight JJ 16440 281 10 . . . 16440 282 1 Elaterite Elaterite NNP 16440 282 2 , , , 16440 282 3 an an DT 16440 282 4 asphalt asphalt NN 16440 282 5 paint paint NN 16440 282 6 made make VBN 16440 282 7 by by IN 16440 282 8 the the DT 16440 282 9 Elaterite Elaterite NNP 16440 282 10 Paint Paint NNP 16440 282 11 and and CC 16440 282 12 Manufacturing Manufacturing NNP 16440 282 13 Company Company NNP 16440 282 14 , , , 16440 282 15 of of IN 16440 282 16 Des Des NNP 16440 282 17 Moines Moines NNP 16440 282 18 , , , 16440 282 19 Iowa Iowa NNP 16440 282 20 , , , 16440 282 21 was be VBD 16440 282 22 used use VBN 16440 282 23 successfully successfully RB 16440 282 24 on on IN 16440 282 25 the the DT 16440 282 26 Luna Luna NNP 16440 282 27 Reservoir Reservoir NNP 16440 282 28 . . . 16440 283 1 This this DT 16440 283 2 paint paint NN 16440 283 3 is be VBZ 16440 283 4 applied apply VBN 16440 283 5 cold cold JJ 16440 283 6 , , , 16440 283 7 and and CC 16440 283 8 preliminary preliminary JJ 16440 283 9 tests test NNS 16440 283 10 showed show VBD 16440 283 11 it -PRON- PRP 16440 283 12 to to TO 16440 283 13 be be VB 16440 283 14 quite quite RB 16440 283 15 efficient efficient JJ 16440 283 16 . . . 16440 284 1 The the DT 16440 284 2 analysis analysis NN 16440 284 3 of of IN 16440 284 4 the the DT 16440 284 5 soil soil NN 16440 284 6 is be VBZ 16440 284 7 as as IN 16440 284 8 follows follow VBZ 16440 284 9 : : : 16440 284 10 Loss loss NN 16440 284 11 on on IN 16440 284 12 ignition ignition NN 16440 284 13 3.35 3.35 CD 16440 284 14 Silica Silica NNP 16440 284 15 56.36 56.36 CD 16440 284 16 Oxide oxide NN 16440 284 17 of of IN 16440 284 18 iron iron NN 16440 284 19 2.93 2.93 CD 16440 284 20 Oxide oxide NN 16440 284 21 of of IN 16440 284 22 aluminum aluminum NN 16440 284 23 8.97 8.97 CD 16440 284 24 Calcium Calcium NNP 16440 284 25 oxide oxide NN 16440 284 26 15.95 15.95 CD 16440 284 27 Magnesium magnesium JJ 16440 284 28 oxide oxide NN 16440 284 29 0.98 0.98 CD 16440 284 30 Oxides oxide NNS 16440 284 31 of of IN 16440 284 32 sodium sodium NN 16440 284 33 and and CC 16440 284 34 potassium potassium NN 16440 284 35 0.47 0.47 CD 16440 284 36 Carbonic Carbonic NNP 16440 284 37 acid acid NN 16440 284 38 11.35 11.35 CD 16440 284 39 Sulphuric Sulphuric NNP 16440 284 40 acid acid NN 16440 284 41 0.11 0.11 CD 16440 284 42 Chlorine Chlorine NNP 16440 284 43 0.04 0.04 CD 16440 284 44 Manganese Manganese NNP 16440 284 45 Traces Traces NNPS 16440 284 46 ------ ------ NFP 16440 284 47 100.51 100.51 CD 16440 284 48 Insoluble insoluble JJ 16440 284 49 matter matter NN 16440 284 50 , , , 16440 284 51 64.50 64.50 CD 16440 284 52 per per NN 16440 284 53 cent cent NN 16440 284 54 . . . 16440 285 1 _ _ NNP 16440 285 2 Pipe Pipe NNP 16440 285 3 - - HYPH 16440 285 4 Line Line NNP 16440 285 5 Leakage_.--There leakage_.--there NN 16440 285 6 is be VBZ 16440 285 7 no no DT 16440 285 8 measurable measurable JJ 16440 285 9 leakage leakage NN 16440 285 10 from from IN 16440 285 11 the the DT 16440 285 12 iron iron NN 16440 285 13 pipe pipe NN 16440 285 14 . . . 16440 286 1 By by IN 16440 286 2 thorough thorough JJ 16440 286 3 inspection inspection NN 16440 286 4 and and CC 16440 286 5 measurement measurement NN 16440 286 6 at at IN 16440 286 7 the the DT 16440 286 8 end end NN 16440 286 9 of of IN 16440 286 10 two two CD 16440 286 11 years year NNS 16440 286 12 , , , 16440 286 13 leakage leakage VB 16440 286 14 on on IN 16440 286 15 the the DT 16440 286 16 wood wood NN 16440 286 17 pipe pipe NN 16440 286 18 , , , 16440 286 19 between between IN 16440 286 20 Coyote Coyote NNP 16440 286 21 and and CC 16440 286 22 Bonito Bonito NNP 16440 286 23 Creek Creek NNP 16440 286 24 , , , 16440 286 25 from from IN 16440 286 26 the the DT 16440 286 27 11-and 11-and CD 16440 286 28 12-in 12-in CD 16440 286 29 . . . 16440 287 1 pipe pipe NN 16440 287 2 , , , 16440 287 3 was be VBD 16440 287 4 found find VBN 16440 287 5 to to TO 16440 287 6 be be VB 16440 287 7 as as IN 16440 287 8 follows follow VBZ 16440 287 9 : : : 16440 287 10 On on IN 16440 287 11 8.6 8.6 CD 16440 287 12 miles mile NNS 16440 287 13 , , , 16440 287 14 11-in 11-in CD 16440 287 15 . . . 16440 288 1 pipe pipe NN 16440 288 2 , , , 16440 288 3 146,600 146,600 CD 16440 288 4 gal gal NN 16440 288 5 . . . 16440 289 1 per per IN 16440 289 2 day day NN 16440 289 3 = = SYM 16440 289 4 17,046 17,046 CD 16440 289 5 gal gal NN 16440 289 6 . . . 16440 290 1 per per IN 16440 290 2 mile mile NN 16440 290 3 . . . 16440 290 4 " " '' 16440 291 1 4 4 CD 16440 291 2 " " `` 16440 291 3 12 12 CD 16440 291 4 " " '' 16440 291 5 " " `` 16440 291 6 14,829 14,829 CD 16440 291 7 " " '' 16440 291 8 " " '' 16440 291 9 " " '' 16440 291 10 = = VBZ 16440 291 11 3,702 3,702 CD 16440 291 12 " " `` 16440 291 13 " " `` 16440 291 14 " " `` 16440 291 15 The the DT 16440 291 16 7 7 CD 16440 291 17 - - SYM 16440 291 18 1/2-in 1/2-in CD 16440 291 19 . . . 16440 292 1 pipe pipe NN 16440 292 2 on on IN 16440 292 3 this this DT 16440 292 4 section section NN 16440 292 5 appears appear VBZ 16440 292 6 to to TO 16440 292 7 be be VB 16440 292 8 leaking leak VBG 16440 292 9 less less JJR 16440 292 10 than than IN 16440 292 11 the the DT 16440 292 12 12-in 12-in CD 16440 292 13 . . . 16440 293 1 pipe pipe NN 16440 293 2 . . . 16440 294 1 Inspection inspection NN 16440 294 2 and and CC 16440 294 3 measurement measurement NN 16440 294 4 of of IN 16440 294 5 it -PRON- PRP 16440 294 6 are be VBP 16440 294 7 to to TO 16440 294 8 be be VB 16440 294 9 made make VBN 16440 294 10 in in IN 16440 294 11 a a DT 16440 294 12 short short JJ 16440 294 13 time time NN 16440 294 14 . . . 16440 295 1 There there EX 16440 295 2 is be VBZ 16440 295 3 no no DT 16440 295 4 material material JJ 16440 295 5 leakage leakage NN 16440 295 6 from from IN 16440 295 7 the the DT 16440 295 8 10-and 10-and CD 16440 295 9 16-in 16-in CD 16440 295 10 . . . 16440 296 1 pipe pipe NN 16440 296 2 between between IN 16440 296 3 Bonito Bonito NNP 16440 296 4 Creek Creek NNP 16440 296 5 and and CC 16440 296 6 Nogal Nogal NNP 16440 296 7 Reservoir Reservoir NNP 16440 296 8 , , , 16440 296 9 as as IN 16440 296 10 determined determine VBN 16440 296 11 by by IN 16440 296 12 velocity velocity NN 16440 296 13 and and CC 16440 296 14 volumetric volumetric NN 16440 296 15 measurements measurement NNS 16440 296 16 hereafter hereafter RB 16440 296 17 described describe VBN 16440 296 18 . . . 16440 297 1 The the DT 16440 297 2 greatest great JJS 16440 297 3 probable probable JJ 16440 297 4 error error NN 16440 297 5 in in IN 16440 297 6 the the DT 16440 297 7 velocity velocity NN 16440 297 8 measurements measurement NNS 16440 297 9 would would MD 16440 297 10 not not RB 16440 297 11 exceed exceed VB 16440 297 12 1/2 1/2 CD 16440 297 13 per per IN 16440 297 14 cent cent NN 16440 297 15 . . . 16440 298 1 If if IN 16440 298 2 such such JJ 16440 298 3 error error NN 16440 298 4 existed exist VBD 16440 298 5 , , , 16440 298 6 and and CC 16440 298 7 was be VBD 16440 298 8 all all DT 16440 298 9 charged charge VBN 16440 298 10 to to TO 16440 298 11 leakage leakage VB 16440 298 12 , , , 16440 298 13 it -PRON- PRP 16440 298 14 would would MD 16440 298 15 amount amount VB 16440 298 16 to to IN 16440 298 17 but but CC 16440 298 18 17,204 17,204 CD 16440 298 19 gal gal NN 16440 298 20 . . . 16440 299 1 per per IN 16440 299 2 day day NN 16440 299 3 , , , 16440 299 4 or or CC 16440 299 5 1,582 1,582 CD 16440 299 6 gal gal NN 16440 299 7 . . . 16440 300 1 per per IN 16440 300 2 mile mile NN 16440 300 3 , , , 16440 300 4 out out IN 16440 300 5 of of IN 16440 300 6 a a DT 16440 300 7 daily daily JJ 16440 300 8 delivery delivery NN 16440 300 9 of of IN 16440 300 10 3,784,000 3,784,000 CD 16440 300 11 gal gal NN 16440 300 12 . . . 16440 301 1 ; ; : 16440 301 2 but but CC 16440 301 3 the the DT 16440 301 4 measured measure VBN 16440 301 5 discharge discharge NN 16440 301 6 of of IN 16440 301 7 the the DT 16440 301 8 pipe pipe NN 16440 301 9 , , , 16440 301 10 as as IN 16440 301 11 determined determine VBN 16440 301 12 by by IN 16440 301 13 the the DT 16440 301 14 velocity velocity NN 16440 301 15 , , , 16440 301 16 was be VBD 16440 301 17 5.84 5.84 CD 16440 301 18 sec sec NNP 16440 301 19 - - HYPH 16440 301 20 ft ft NNP 16440 301 21 . . NNP 16440 301 22 , , , 16440 301 23 while while IN 16440 301 24 the the DT 16440 301 25 mean mean NNP 16440 301 26 maximum maximum NN 16440 301 27 volume volume NN 16440 301 28 of of IN 16440 301 29 this this DT 16440 301 30 water water NN 16440 301 31 over over IN 16440 301 32 the the DT 16440 301 33 weir weir NN 16440 301 34 at at IN 16440 301 35 the the DT 16440 301 36 end end NN 16440 301 37 of of IN 16440 301 38 the the DT 16440 301 39 pipe pipe NN 16440 301 40 is be VBZ 16440 301 41 recorded record VBN 16440 301 42 by by IN 16440 301 43 the the DT 16440 301 44 weir weir NN 16440 301 45 as as IN 16440 301 46 5.88 5.88 CD 16440 301 47 sec sec NNP 16440 301 48 - - HYPH 16440 301 49 ft ft NNP 16440 301 50 . . . 16440 301 51 From from IN 16440 301 52 Coyote Coyote NNP 16440 301 53 , , , 16440 301 54 east east NN 16440 301 55 along along IN 16440 301 56 the the DT 16440 301 57 railway railway NN 16440 301 58 , , , 16440 301 59 the the DT 16440 301 60 wood wood NN 16440 301 61 pipe pipe NN 16440 301 62 is be VBZ 16440 301 63 remarkably remarkably RB 16440 301 64 tight tight JJ 16440 301 65 . . . 16440 302 1 The the DT 16440 302 2 rate rate NN 16440 302 3 of of IN 16440 302 4 leakage leakage NN 16440 302 5 from from IN 16440 302 6 it -PRON- PRP 16440 302 7 , , , 16440 302 8 as as IN 16440 302 9 determined determine VBN 16440 302 10 by by IN 16440 302 11 600 600 CD 16440 302 12 observations observation NNS 16440 302 13 uniformly uniformly RB 16440 302 14 distributed distribute VBN 16440 302 15 , , , 16440 302 16 was be VBD 16440 302 17 as as IN 16440 302 18 follows follow VBZ 16440 302 19 : : : 16440 302 20 11-in 11-in CD 16440 302 21 . . . 16440 303 1 pipe pipe NN 16440 303 2 = = SYM 16440 303 3 120 120 CD 16440 303 4 gal gal NN 16440 303 5 . . . 16440 304 1 per per IN 16440 304 2 mile mile NN 16440 304 3 per per IN 16440 304 4 day day NN 16440 304 5 . . . 16440 305 1 8 8 CD 16440 305 2 - - SYM 16440 305 3 1/2 1/2 CD 16440 305 4 and and CC 16440 305 5 7 7 CD 16440 305 6 - - HYPH 16440 305 7 1/2-in 1/2-in CD 16440 305 8 . . . 16440 306 1 pipe pipe NN 16440 306 2 = = SYM 16440 306 3 268 268 CD 16440 306 4 " " `` 16440 306 5 " " `` 16440 306 6 " " '' 16440 306 7 " " '' 16440 306 8 " " '' 16440 306 9 The the DT 16440 306 10 maximum maximum JJ 16440 306 11 rate rate NN 16440 306 12 on on IN 16440 306 13 1 1 CD 16440 306 14 mile mile NN 16440 306 15 was be VBD 16440 306 16 1,613 1,613 CD 16440 306 17 gal gal NN 16440 306 18 . . . 16440 307 1 The the DT 16440 307 2 minimum minimum NN 16440 307 3 found found NN 16440 307 4 was be VBD 16440 307 5 zero zero CD 16440 307 6 . . . 16440 308 1 The the DT 16440 308 2 observations observation NNS 16440 308 3 were be VBD 16440 308 4 made make VBN 16440 308 5 by by IN 16440 308 6 uncovering uncover VBG 16440 308 7 a a DT 16440 308 8 joint joint NN 16440 308 9 and and CC 16440 308 10 measuring measure VBG 16440 308 11 the the DT 16440 308 12 leakage leakage NN 16440 308 13 therefrom therefrom NN 16440 308 14 for for IN 16440 308 15 10 10 CD 16440 308 16 min min NN 16440 308 17 . . . 16440 309 1 A a DT 16440 309 2 graduated graduate VBN 16440 309 3 glass glass NN 16440 309 4 measuring measure VBG 16440 309 5 to to IN 16440 309 6 drams drams NNP 16440 309 7 was be VBD 16440 309 8 used use VBN 16440 309 9 . . . 16440 310 1 The the DT 16440 310 2 rate rate NN 16440 310 3 of of IN 16440 310 4 leakage leakage NN 16440 310 5 varied vary VBN 16440 310 6 from from IN 16440 310 7 5 5 CD 16440 310 8 drops drop NNS 16440 310 9 to to IN 16440 310 10 45 45 CD 16440 310 11 oz oz IN 16440 310 12 . . . 16440 311 1 in in IN 16440 311 2 10 10 CD 16440 311 3 min min NN 16440 311 4 . . . 16440 312 1 Of of IN 16440 312 2 the the DT 16440 312 3 joints joint NNS 16440 312 4 uncovered uncover VBD 16440 312 5 57 57 CD 16440 312 6 % % NN 16440 312 7 was be VBD 16440 312 8 found find VBN 16440 312 9 to to TO 16440 312 10 be be VB 16440 312 11 leaking leak VBG 16440 312 12 . . . 16440 313 1 It -PRON- PRP 16440 313 2 is be VBZ 16440 313 3 rather rather RB 16440 313 4 remarkable remarkable JJ 16440 313 5 that that IN 16440 313 6 , , , 16440 313 7 in in IN 16440 313 8 the the DT 16440 313 9 large large JJ 16440 313 10 leakage leakage NN 16440 313 11 of of IN 16440 313 12 the the DT 16440 313 13 11-and 11-and CD 16440 313 14 12-in 12-in CD 16440 313 15 . . . 16440 314 1 pipe pipe NN 16440 314 2 between between IN 16440 314 3 Coyote Coyote NNP 16440 314 4 and and CC 16440 314 5 Bonito Bonito NNP 16440 314 6 , , , 16440 314 7 only only RB 16440 314 8 one one CD 16440 314 9 out out IN 16440 314 10 of of IN 16440 314 11 every every DT 16440 314 12 eight eight CD 16440 314 13 joints joint NNS 16440 314 14 was be VBD 16440 314 15 leaking leak VBG 16440 314 16 . . . 16440 315 1 This this DT 16440 315 2 indicates indicate VBZ 16440 315 3 a a DT 16440 315 4 physical physical JJ 16440 315 5 defect defect NN 16440 315 6 in in IN 16440 315 7 such such JJ 16440 315 8 joints joint NNS 16440 315 9 . . . 16440 316 1 The the DT 16440 316 2 largest large JJS 16440 316 3 leak leak NN 16440 316 4 found find VBD 16440 316 5 on on IN 16440 316 6 one one CD 16440 316 7 joint joint NN 16440 316 8 was be VBD 16440 316 9 at at IN 16440 316 10 the the DT 16440 316 11 rate rate NN 16440 316 12 of of IN 16440 316 13 17 17 CD 16440 316 14 [ [ -LRB- 16440 316 15 , , , 16440 316 16 ? ? . 16440 317 1 ] ] -RRB- 16440 317 2 280 280 CD 16440 317 3 gal gal NN 16440 317 4 . . . 16440 318 1 per per IN 16440 318 2 day day NN 16440 318 3 . . . 16440 319 1 Leakage leakage NN 16440 319 2 between between IN 16440 319 3 or or CC 16440 319 4 through through IN 16440 319 5 the the DT 16440 319 6 staves stave NNS 16440 319 7 is be VBZ 16440 319 8 not not RB 16440 319 9 measurable measurable JJ 16440 319 10 , , , 16440 319 11 as as IN 16440 319 12 it -PRON- PRP 16440 319 13 is be VBZ 16440 319 14 not not RB 16440 319 15 fast fast JJ 16440 319 16 enough enough JJ 16440 319 17 to to TO 16440 319 18 come come VB 16440 319 19 away away RB 16440 319 20 in in IN 16440 319 21 drops drop NNS 16440 319 22 unless unless IN 16440 319 23 there there EX 16440 319 24 is be VBZ 16440 319 25 some some DT 16440 319 26 imperfection imperfection NN 16440 319 27 in in IN 16440 319 28 the the DT 16440 319 29 wood wood NN 16440 319 30 . . . 16440 320 1 The the DT 16440 320 2 insignificant insignificant JJ 16440 320 3 leakage leakage NN 16440 320 4 of of IN 16440 320 5 120 120 CD 16440 320 6 gal gal NNP 16440 320 7 . . . 16440 320 8 , , , 16440 320 9 stated state VBN 16440 320 10 above above RB 16440 320 11 , , , 16440 320 12 is be VBZ 16440 320 13 from from IN 16440 320 14 the the DT 16440 320 15 11-in 11-in CD 16440 320 16 . . . 16440 321 1 pipe pipe NN 16440 321 2 in in IN 16440 321 3 the the DT 16440 321 4 pumping pump VBG 16440 321 5 main main NN 16440 321 6 between between IN 16440 321 7 Coyote Coyote NNP 16440 321 8 and and CC 16440 321 9 Corona Corona NNP 16440 321 10 . . . 16440 322 1 The the DT 16440 322 2 present present JJ 16440 322 3 maximum maximum JJ 16440 322 4 working work VBG 16440 322 5 pressure pressure NN 16440 322 6 on on IN 16440 322 7 it -PRON- PRP 16440 322 8 is be VBZ 16440 322 9 100 100 CD 16440 322 10 lb lb RB 16440 322 11 . . . 16440 323 1 per per IN 16440 323 2 sq sq NNP 16440 323 3 . . . 16440 324 1 in in IN 16440 324 2 . . . 16440 325 1 All all PDT 16440 325 2 the the DT 16440 325 3 figures figure NNS 16440 325 4 given give VBN 16440 325 5 above above RB 16440 325 6 include include VBP 16440 325 7 visible visible JJ 16440 325 8 and and CC 16440 325 9 invisible invisible JJ 16440 325 10 leakage leakage NN 16440 325 11 , , , 16440 325 12 the the DT 16440 325 13 latter latter JJ 16440 325 14 being be VBG 16440 325 15 such such JJ 16440 325 16 as as IN 16440 325 17 does do VBZ 16440 325 18 not not RB 16440 325 19 appear appear VB 16440 325 20 on on IN 16440 325 21 the the DT 16440 325 22 surface surface NN 16440 325 23 . . . 16440 326 1 The the DT 16440 326 2 visible visible JJ 16440 326 3 leakage leakage NN 16440 326 4 is be VBZ 16440 326 5 but but CC 16440 326 6 a a DT 16440 326 7 small small JJ 16440 326 8 part part NN 16440 326 9 of of IN 16440 326 10 the the DT 16440 326 11 total total NN 16440 326 12 . . . 16440 327 1 _ _ NNP 16440 327 2 Stopping stop VBG 16440 327 3 the the DT 16440 327 4 Leaks_.--Generally leaks_.--generally RB 16440 327 5 , , , 16440 327 6 any any DT 16440 327 7 ordinary ordinary JJ 16440 327 8 leak leak NN 16440 327 9 is be VBZ 16440 327 10 readily readily RB 16440 327 11 stopped stop VBN 16440 327 12 by by IN 16440 327 13 pine pine JJ 16440 327 14 wedges wedge NNS 16440 327 15 . . . 16440 328 1 Sometimes sometimes RB 16440 328 2 a a DT 16440 328 3 loose loose JJ 16440 328 4 joint joint NN 16440 328 5 requires require VBZ 16440 328 6 individual individual JJ 16440 328 7 bands band NNS 16440 328 8 bolted bolt VBN 16440 328 9 around around IN 16440 328 10 it -PRON- PRP 16440 328 11 . . . 16440 329 1 Bran bran NN 16440 329 2 or or CC 16440 329 3 saw saw NN 16440 329 4 - - HYPH 16440 329 5 dust dust NN 16440 329 6 is be VBZ 16440 329 7 effective effective JJ 16440 329 8 in in IN 16440 329 9 stopping stop VBG 16440 329 10 the the DT 16440 329 11 small small JJ 16440 329 12 leaks leak NNS 16440 329 13 which which WDT 16440 329 14 can can MD 16440 329 15 not not RB 16440 329 16 be be VB 16440 329 17 reached reach VBN 16440 329 18 by by IN 16440 329 19 the the DT 16440 329 20 wedges wedge NNS 16440 329 21 . . . 16440 330 1 The the DT 16440 330 2 good good JJ 16440 330 3 effect effect NN 16440 330 4 of of IN 16440 330 5 the the DT 16440 330 6 latter latter JJ 16440 330 7 is be VBZ 16440 330 8 likely likely JJ 16440 330 9 to to TO 16440 330 10 be be VB 16440 330 11 destroyed destroy VBN 16440 330 12 by by IN 16440 330 13 a a DT 16440 330 14 rapid rapid JJ 16440 330 15 emptying emptying NN 16440 330 16 of of IN 16440 330 17 the the DT 16440 330 18 pipe pipe NN 16440 330 19 . . . 16440 331 1 If if IN 16440 331 2 the the DT 16440 331 3 water water NN 16440 331 4 is be VBZ 16440 331 5 drawn draw VBN 16440 331 6 out out RP 16440 331 7 faster fast RBR 16440 331 8 than than IN 16440 331 9 the the DT 16440 331 10 air air NN 16440 331 11 can can MD 16440 331 12 enter enter VB 16440 331 13 through through IN 16440 331 14 the the DT 16440 331 15 air air NN 16440 331 16 - - HYPH 16440 331 17 valves valve NNS 16440 331 18 , , , 16440 331 19 heavy heavy JJ 16440 331 20 vacuums vacuum NNS 16440 331 21 are be VBP 16440 331 22 formed form VBN 16440 331 23 down down RP 16440 331 24 long long JJ 16440 331 25 slopes slope NNS 16440 331 26 , , , 16440 331 27 and and CC 16440 331 28 the the DT 16440 331 29 air air NN 16440 331 30 forces force VBZ 16440 331 31 its -PRON- PRP$ 16440 331 32 way way NN 16440 331 33 in in IN 16440 331 34 through through IN 16440 331 35 the the DT 16440 331 36 joints joint NNS 16440 331 37 and and CC 16440 331 38 between between IN 16440 331 39 the the DT 16440 331 40 staves stave NNS 16440 331 41 . . . 16440 332 1 The the DT 16440 332 2 result result NN 16440 332 3 is be VBZ 16440 332 4 that that IN 16440 332 5 the the DT 16440 332 6 pipe pipe NN 16440 332 7 will will MD 16440 332 8 frequently frequently RB 16440 332 9 leak leak VB 16440 332 10 badly badly RB 16440 332 11 for for IN 16440 332 12 some some DT 16440 332 13 time time NN 16440 332 14 after after IN 16440 332 15 it -PRON- PRP 16440 332 16 is be VBZ 16440 332 17 refilled refill VBN 16440 332 18 , , , 16440 332 19 although although IN 16440 332 20 it -PRON- PRP 16440 332 21 may may MD 16440 332 22 have have VB 16440 332 23 been be VBN 16440 332 24 tight tight JJ 16440 332 25 previously previously RB 16440 332 26 . . . 16440 333 1 A a DT 16440 333 2 full full JJ 16440 333 3 pipe pipe NN 16440 333 4 and and CC 16440 333 5 a a DT 16440 333 6 steady steady JJ 16440 333 7 pressure pressure NN 16440 333 8 are be VBP 16440 333 9 highly highly RB 16440 333 10 desirable desirable JJ 16440 333 11 . . . 16440 334 1 This this DT 16440 334 2 doubtless doubtless NN 16440 334 3 accounts account VBZ 16440 334 4 to to IN 16440 334 5 some some DT 16440 334 6 extent extent NN 16440 334 7 for for IN 16440 334 8 the the DT 16440 334 9 extreme extreme JJ 16440 334 10 tightness tightness NN 16440 334 11 of of IN 16440 334 12 the the DT 16440 334 13 wood wood NN 16440 334 14 pipe pipe NN 16440 334 15 in in IN 16440 334 16 the the DT 16440 334 17 pumping pump VBG 16440 334 18 main main NN 16440 334 19 . . . 16440 335 1 _ _ NNP 16440 335 2 Grade Grade NNP 16440 335 3 Lines_.--The Lines_.--The NNP 16440 335 4 hydraulic hydraulic JJ 16440 335 5 grade grade NN 16440 335 6 lines line NNS 16440 335 7 , , , 16440 335 8 shown show VBN 16440 335 9 on on IN 16440 335 10 Plate Plate NNP 16440 335 11 V V NNP 16440 335 12 , , , 16440 335 13 were be VBD 16440 335 14 laid lay VBN 16440 335 15 as as RB 16440 335 16 best well RBS 16440 335 17 fitting fit VBG 16440 335 18 the the DT 16440 335 19 controlling control VBG 16440 335 20 elevations elevation NNS 16440 335 21 . . . 16440 336 1 The the DT 16440 336 2 various various JJ 16440 336 3 diameters diameter NNS 16440 336 4 of of IN 16440 336 5 pipe pipe NN 16440 336 6 were be VBD 16440 336 7 determined determine VBN 16440 336 8 by by IN 16440 336 9 Darcy Darcy NNP 16440 336 10 's 's POS 16440 336 11 general general JJ 16440 336 12 formula formula NN 16440 336 13 , , , 16440 336 14 with with IN 16440 336 15 _ _ NNP 16440 336 16 C C NNP 16440 336 17 _ _ NNP 16440 336 18 = = SYM 16440 336 19 0.00033 0.00033 CD 16440 336 20 for for IN 16440 336 21 wood wood NN 16440 336 22 and and CC 16440 336 23 = = SYM 16440 336 24 0.00066 0.00066 CD 16440 336 25 for for IN 16440 336 26 iron iron NN 16440 336 27 pipe pipe NN 16440 336 28 , , , 16440 336 29 checking check VBG 16440 336 30 by by IN 16440 336 31 Kutter Kutter NNP 16440 336 32 's 's POS 16440 336 33 formula formula NN 16440 336 34 , , , 16440 336 35 with with IN 16440 336 36 _ _ NNP 16440 336 37 n n CC 16440 336 38 _ _ NNP 16440 336 39 = = SYM 16440 336 40 0.01 0.01 CD 16440 336 41 for for IN 16440 336 42 wood wood NN 16440 336 43 and and CC 16440 336 44 = = SYM 16440 336 45 0.012 0.012 CD 16440 336 46 for for IN 16440 336 47 iron iron NN 16440 336 48 . . . 16440 337 1 These these DT 16440 337 2 coefficients coefficient NNS 16440 337 3 were be VBD 16440 337 4 taken take VBN 16440 337 5 as as IN 16440 337 6 conservative conservative JJ 16440 337 7 and and CC 16440 337 8 on on IN 16440 337 9 the the DT 16440 337 10 safe safe JJ 16440 337 11 side side NN 16440 337 12 , , , 16440 337 13 and and CC 16440 337 14 such such JJ 16440 337 15 they -PRON- PRP 16440 337 16 proved prove VBD 16440 337 17 to to TO 16440 337 18 be be VB 16440 337 19 . . . 16440 338 1 It -PRON- PRP 16440 338 2 was be VBD 16440 338 3 desired desire VBN 16440 338 4 that that IN 16440 338 5 the the DT 16440 338 6 line line NN 16440 338 7 should should MD 16440 338 8 carry carry VB 16440 338 9 not not RB 16440 338 10 less less JJR 16440 338 11 than than IN 16440 338 12 5 5 CD 16440 338 13 sec sec NNP 16440 338 14 - - HYPH 16440 338 15 ft ft NNP 16440 338 16 . . NNP 16440 338 17 to to IN 16440 338 18 Nogal Nogal NNP 16440 338 19 and and CC 16440 338 20 half half NN 16440 338 21 as as RB 16440 338 22 much much JJ 16440 338 23 beyond beyond IN 16440 338 24 . . . 16440 339 1 _ _ NNP 16440 339 2 Velocities_.--The velocities_.--the CD 16440 339 3 pipe pipe NN 16440 339 4 line line NN 16440 339 5 from from IN 16440 339 6 Bonito Bonito NNP 16440 339 7 Creek Creek NNP 16440 339 8 to to IN 16440 339 9 the the DT 16440 339 10 Nogal Nogal NNP 16440 339 11 Reservoir Reservoir NNP 16440 339 12 affords afford VBZ 16440 339 13 excellent excellent JJ 16440 339 14 conditions condition NNS 16440 339 15 for for IN 16440 339 16 velocity velocity NN 16440 339 17 and and CC 16440 339 18 capacity capacity NN 16440 339 19 measurements measurement NNS 16440 339 20 , , , 16440 339 21 there there EX 16440 339 22 being be VBG 16440 339 23 no no DT 16440 339 24 distribution distribution NN 16440 339 25 service service NN 16440 339 26 from from IN 16440 339 27 it -PRON- PRP 16440 339 28 . . . 16440 340 1 Beginning begin VBG 16440 340 2 at at IN 16440 340 3 the the DT 16440 340 4 creek creek NN 16440 340 5 , , , 16440 340 6 it -PRON- PRP 16440 340 7 consists consist VBZ 16440 340 8 of of IN 16440 340 9 12,700 12,700 CD 16440 340 10 ft ft NN 16440 340 11 . . NN 16440 340 12 of of IN 16440 340 13 10-in 10-in CD 16440 340 14 . . . 16440 341 1 wood wood NN 16440 341 2 pipe pipe NN 16440 341 3 , , , 16440 341 4 with with IN 16440 341 5 a a DT 16440 341 6 hydraulic hydraulic JJ 16440 341 7 grade grade NN 16440 341 8 of of IN 16440 341 9 0.03338 0.03338 CD 16440 341 10 , , , 16440 341 11 followed follow VBN 16440 341 12 by by IN 16440 341 13 48,000 48,000 CD 16440 341 14 ft ft NN 16440 341 15 . . NN 16440 341 16 of of IN 16440 341 17 16-in 16-in NNP 16440 341 18 . . . 16440 342 1 wood wood NN 16440 342 2 pipe pipe NN 16440 342 3 , , , 16440 342 4 with with IN 16440 342 5 a a DT 16440 342 6 hydraulic hydraulic JJ 16440 342 7 grade grade NN 16440 342 8 of of IN 16440 342 9 0.0030625 0.0030625 CD 16440 342 10 , , , 16440 342 11 ending end VBG 16440 342 12 on on IN 16440 342 13 the the DT 16440 342 14 south south NNP 16440 342 15 rim rim NN 16440 342 16 of of IN 16440 342 17 the the DT 16440 342 18 Nogal Nogal NNP 16440 342 19 Reservoir Reservoir NNP 16440 342 20 . . . 16440 343 1 There there EX 16440 343 2 is be VBZ 16440 343 3 an an DT 16440 343 4 open open JJ 16440 343 5 stand stand NN 16440 343 6 - - HYPH 16440 343 7 pipe pipe NN 16440 343 8 where where WRB 16440 343 9 the the DT 16440 343 10 two two CD 16440 343 11 pipes pipe NNS 16440 343 12 and and CC 16440 343 13 grades grade NNS 16440 343 14 join join VBP 16440 343 15 . . . 16440 344 1 When when WRB 16440 344 2 this this DT 16440 344 3 section section NN 16440 344 4 of of IN 16440 344 5 the the DT 16440 344 6 line line NN 16440 344 7 was be VBD 16440 344 8 laid lay VBN 16440 344 9 , , , 16440 344 10 the the DT 16440 344 11 last last JJ 16440 344 12 car car NN 16440 344 13 of of IN 16440 344 14 16-in 16-in CD 16440 344 15 . . . 16440 345 1 pipe pipe NN 16440 345 2 was be VBD 16440 345 3 late late RB 16440 345 4 in in IN 16440 345 5 arriving arrive VBG 16440 345 6 and and CC 16440 345 7 , , , 16440 345 8 as as IN 16440 345 9 it -PRON- PRP 16440 345 10 was be VBD 16440 345 11 desirable desirable JJ 16440 345 12 to to TO 16440 345 13 get get VB 16440 345 14 water water NN 16440 345 15 into into IN 16440 345 16 the the DT 16440 345 17 reservoir reservoir NN 16440 345 18 as as RB 16440 345 19 soon soon RB 16440 345 20 as as IN 16440 345 21 possible possible JJ 16440 345 22 , , , 16440 345 23 500 500 CD 16440 345 24 ft ft NN 16440 345 25 . . NN 16440 345 26 of of IN 16440 345 27 10-in 10-in CD 16440 345 28 . . . 16440 346 1 pipe pipe NN 16440 346 2 were be VBD 16440 346 3 laid lay VBN 16440 346 4 in in IN 16440 346 5 the the DT 16440 346 6 lower low JJR 16440 346 7 part part NN 16440 346 8 of of IN 16440 346 9 the the DT 16440 346 10 16-in 16-in NNP 16440 346 11 . . . 16440 347 1 line line NN 16440 347 2 , , , 16440 347 3 near near IN 16440 347 4 the the DT 16440 347 5 reservoir reservoir NN 16440 347 6 , , , 16440 347 7 as as IN 16440 347 8 indicated indicate VBN 16440 347 9 on on IN 16440 347 10 Fig Fig NNP 16440 347 11 . . . 16440 348 1 2 2 LS 16440 348 2 , , , 16440 348 3 which which WDT 16440 348 4 shows show VBZ 16440 348 5 the the DT 16440 348 6 hydraulic hydraulic JJ 16440 348 7 grades grade NNS 16440 348 8 and and CC 16440 348 9 the the DT 16440 348 10 pipe pipe NN 16440 348 11 diameters diameter NNS 16440 348 12 of of IN 16440 348 13 this this DT 16440 348 14 section section NN 16440 348 15 of of IN 16440 348 16 the the DT 16440 348 17 line line NN 16440 348 18 . . . 16440 349 1 When when WRB 16440 349 2 the the DT 16440 349 3 first first JJ 16440 349 4 two two CD 16440 349 5 velocity velocity NN 16440 349 6 measurements measurement NNS 16440 349 7 , , , 16440 349 8 of of IN 16440 349 9 March March NNP 16440 349 10 10th 10th NN 16440 349 11 and and CC 16440 349 12 31st 31st NN 16440 349 13 , , , 16440 349 14 1908 1908 CD 16440 349 15 , , , 16440 349 16 described describe VBN 16440 349 17 below below IN 16440 349 18 , , , 16440 349 19 were be VBD 16440 349 20 made make VBN 16440 349 21 ( ( -LRB- 16440 349 22 after after IN 16440 349 23 the the DT 16440 349 24 line line NN 16440 349 25 had have VBD 16440 349 26 been be VBN 16440 349 27 put put VBN 16440 349 28 into into IN 16440 349 29 service service NN 16440 349 30 on on IN 16440 349 31 February February NNP 16440 349 32 20th 20th NN 16440 349 33 , , , 16440 349 34 1908 1908 CD 16440 349 35 ) ) -RRB- 16440 349 36 , , , 16440 349 37 the the DT 16440 349 38 500 500 CD 16440 349 39 ft ft NN 16440 349 40 . . NN 16440 349 41 of of IN 16440 349 42 10-in 10-in CD 16440 349 43 . . . 16440 350 1 pipe pipe NN 16440 350 2 were be VBD 16440 350 3 still still RB 16440 350 4 in in IN 16440 350 5 the the DT 16440 350 6 16-in 16-in NNP 16440 350 7 . . . 16440 351 1 line line NN 16440 351 2 , , , 16440 351 3 and and CC 16440 351 4 the the DT 16440 351 5 hydraulic hydraulic JJ 16440 351 6 grade grade NN 16440 351 7 was be VBD 16440 351 8 defined define VBN 16440 351 9 by by IN 16440 351 10 the the DT 16440 351 11 solid solid JJ 16440 351 12 line line NN 16440 351 13 , , , 16440 351 14 _ _ NNP 16440 351 15 ABCDE ABCDE NNP 16440 351 16 _ _ NNP 16440 351 17 , , , 16440 351 18 Fig Fig NNP 16440 351 19 . . . 16440 352 1 2 2 LS 16440 352 2 . . . 16440 353 1 When when WRB 16440 353 2 the the DT 16440 353 3 third third JJ 16440 353 4 measurement measurement NN 16440 353 5 , , , 16440 353 6 of of IN 16440 353 7 May May NNP 16440 353 8 12th 12th NN 16440 353 9 , , , 16440 353 10 1909 1909 CD 16440 353 11 , , , 16440 353 12 also also RB 16440 353 13 described describe VBN 16440 353 14 below below RB 16440 353 15 , , , 16440 353 16 was be VBD 16440 353 17 made make VBN 16440 353 18 , , , 16440 353 19 the the DT 16440 353 20 10-in 10-in CD 16440 353 21 . . . 16440 354 1 pipe pipe NN 16440 354 2 had have VBD 16440 354 3 been be VBN 16440 354 4 replaced replace VBN 16440 354 5 by by IN 16440 354 6 16-in 16-in CD 16440 354 7 . . . 16440 355 1 pipe pipe NN 16440 355 2 , , , 16440 355 3 and and CC 16440 355 4 the the DT 16440 355 5 hydraulic hydraulic JJ 16440 355 6 grade grade NN 16440 355 7 was be VBD 16440 355 8 defined define VBN 16440 355 9 by by IN 16440 355 10 the the DT 16440 355 11 solid solid JJ 16440 355 12 line line NN 16440 355 13 , , , 16440 355 14 _ _ NNP 16440 355 15 ABE ABE NNP 16440 355 16 _ _ NNP 16440 355 17 . . . 16440 356 1 [ [ -LRB- 16440 356 2 Illustration illustration NN 16440 356 3 : : : 16440 356 4 FIG FIG NNP 16440 356 5 . . . 16440 357 1 2 2 LS 16440 357 2 . . . 16440 357 3 ] ] -RRB- 16440 358 1 The the DT 16440 358 2 dotted dotted JJ 16440 358 3 line line NN 16440 358 4 , , , 16440 358 5 _ _ NNP 16440 358 6 AFE AFE NNP 16440 358 7 _ _ NNP 16440 358 8 , , , 16440 358 9 is be VBZ 16440 358 10 the the DT 16440 358 11 approximate approximate JJ 16440 358 12 theoretical theoretical JJ 16440 358 13 position position NN 16440 358 14 which which WDT 16440 358 15 the the DT 16440 358 16 grade grade NN 16440 358 17 , , , 16440 358 18 _ _ NNP 16440 358 19 ABCDE ABCDE NNP 16440 358 20 _ _ NNP 16440 358 21 , , , 16440 358 22 should should MD 16440 358 23 have have VB 16440 358 24 assumed assume VBN 16440 358 25 when when WRB 16440 358 26 the the DT 16440 358 27 500 500 CD 16440 358 28 ft ft NN 16440 358 29 . . NNP 16440 358 30 of of IN 16440 358 31 10-in 10-in CD 16440 358 32 . . . 16440 359 1 pipe pipe NN 16440 359 2 were be VBD 16440 359 3 taken take VBN 16440 359 4 out out IN 16440 359 5 of of IN 16440 359 6 the the DT 16440 359 7 16-in 16-in NNP 16440 359 8 . . . 16440 360 1 line line NN 16440 360 2 . . . 16440 361 1 On on IN 16440 361 2 the the DT 16440 361 3 contrary contrary NN 16440 361 4 , , , 16440 361 5 it -PRON- PRP 16440 361 6 took take VBD 16440 361 7 the the DT 16440 361 8 position position NN 16440 361 9 of of IN 16440 361 10 the the DT 16440 361 11 grade grade NN 16440 361 12 line line NN 16440 361 13 , , , 16440 361 14 _ _ NNP 16440 361 15 ABE ABE NNP 16440 361 16 _ _ NNP 16440 361 17 . . . 16440 362 1 During during IN 16440 362 2 the the DT 16440 362 3 interval interval NN 16440 362 4 between between IN 16440 362 5 March March NNP 16440 362 6 , , , 16440 362 7 1908 1908 CD 16440 362 8 , , , 16440 362 9 and and CC 16440 362 10 May May NNP 16440 362 11 , , , 16440 362 12 1909 1909 CD 16440 362 13 , , , 16440 362 14 the the DT 16440 362 15 water water NN 16440 362 16 came come VBD 16440 362 17 to to TO 16440 362 18 overflow overflow VB 16440 362 19 from from IN 16440 362 20 the the DT 16440 362 21 stand stand NN 16440 362 22 - - HYPH 16440 362 23 pipe pipe NN 16440 362 24 at at IN 16440 362 25 _ _ NNP 16440 362 26 B B NNP 16440 362 27 _ _ NNP 16440 362 28 , , , 16440 362 29 when when WRB 16440 362 30 the the DT 16440 362 31 line line NN 16440 362 32 was be VBD 16440 362 33 running run VBG 16440 362 34 under under IN 16440 362 35 full full JJ 16440 362 36 pressure pressure NN 16440 362 37 , , , 16440 362 38 indicating indicate VBG 16440 362 39 an an DT 16440 362 40 increase increase NN 16440 362 41 of of IN 16440 362 42 capacity capacity NN 16440 362 43 in in IN 16440 362 44 the the DT 16440 362 45 10-in 10-in NNP 16440 362 46 . . . 16440 363 1 pipe pipe NN 16440 363 2 greater great JJR 16440 363 3 than than IN 16440 363 4 a a DT 16440 363 5 corresponding corresponding JJ 16440 363 6 increase increase NN 16440 363 7 in in IN 16440 363 8 the the DT 16440 363 9 16-in 16-in NNP 16440 363 10 . . . 16440 364 1 The the DT 16440 364 2 alignment alignment NN 16440 364 3 of of IN 16440 364 4 the the DT 16440 364 5 10-in 10-in NNP 16440 364 6 . . . 16440 365 1 line line NN 16440 365 2 , , , 16440 365 3 vertically vertically RB 16440 365 4 and and CC 16440 365 5 horizontally horizontally RB 16440 365 6 , , , 16440 365 7 is be VBZ 16440 365 8 more more RBR 16440 365 9 regular regular JJ 16440 365 10 and and CC 16440 365 11 uniform uniform JJ 16440 365 12 than than IN 16440 365 13 the the DT 16440 365 14 16-in 16-in NNP 16440 365 15 . . . 16440 366 1 line line NN 16440 366 2 . . . 16440 367 1 The the DT 16440 367 2 latter latter NN 16440 367 3 has have VBZ 16440 367 4 many many JJ 16440 367 5 abrupt abrupt JJ 16440 367 6 curves curve NNS 16440 367 7 and and CC 16440 367 8 bends bend NNS 16440 367 9 , , , 16440 367 10 vertically vertically RB 16440 367 11 and and CC 16440 367 12 horizontally horizontally RB 16440 367 13 . . . 16440 368 1 It -PRON- PRP 16440 368 2 crosses cross VBZ 16440 368 3 nine nine CD 16440 368 4 sharp sharp JJ 16440 368 5 ridges ridge NNS 16440 368 6 and and CC 16440 368 7 dips dip NNS 16440 368 8 under under IN 16440 368 9 as as RB 16440 368 10 many many JJ 16440 368 11 deep deep JJ 16440 368 12 arroyos arroyos NN 16440 368 13 . . . 16440 369 1 This this DT 16440 369 2 introduces introduce VBZ 16440 369 3 a a DT 16440 369 4 fixed fix VBN 16440 369 5 element element NN 16440 369 6 of of IN 16440 369 7 frictional frictional JJ 16440 369 8 resistance resistance NN 16440 369 9 which which WDT 16440 369 10 does do VBZ 16440 369 11 not not RB 16440 369 12 decrease decrease VB 16440 369 13 with with IN 16440 369 14 the the DT 16440 369 15 increasing increase VBG 16440 369 16 smoothness smoothness NN 16440 369 17 of of IN 16440 369 18 the the DT 16440 369 19 interior interior JJ 16440 369 20 surface surface NN 16440 369 21 of of IN 16440 369 22 wood wood NN 16440 369 23 pipe pipe NN 16440 369 24 , , , 16440 369 25 and and CC 16440 369 26 probably probably RB 16440 369 27 accounts account VBZ 16440 369 28 for for IN 16440 369 29 the the DT 16440 369 30 higher high JJR 16440 369 31 resistance resistance NN 16440 369 32 of of IN 16440 369 33 the the DT 16440 369 34 16-in 16-in NNP 16440 369 35 . . . 16440 370 1 line line NN 16440 370 2 . . . 16440 371 1 From from IN 16440 371 2 Fig Fig NNP 16440 371 3 . . . 16440 372 1 2 2 LS 16440 372 2 it -PRON- PRP 16440 372 3 appears appear VBZ 16440 372 4 that that DT 16440 372 5 , , , 16440 372 6 while while IN 16440 372 7 the the DT 16440 372 8 10-in 10-in CD 16440 372 9 . . . 16440 373 1 line line NN 16440 373 2 had have VBD 16440 373 3 an an DT 16440 373 4 initial initial JJ 16440 373 5 coefficient coefficient NN 16440 373 6 of of IN 16440 373 7 roughness roughness NN 16440 373 8 slightly slightly RB 16440 373 9 greater great JJR 16440 373 10 than than IN 16440 373 11 0.009 0.009 CD 16440 373 12 and and CC 16440 373 13 now now RB 16440 373 14 equal equal JJ 16440 373 15 to to IN 16440 373 16 it -PRON- PRP 16440 373 17 , , , 16440 373 18 the the DT 16440 373 19 16-in 16-in NNP 16440 373 20 . . . 16440 374 1 line line NN 16440 374 2 had have VBD 16440 374 3 one one CD 16440 374 4 equal equal JJ 16440 374 5 at at IN 16440 374 6 first first RB 16440 374 7 but but CC 16440 374 8 now now RB 16440 374 9 slightly slightly RB 16440 374 10 less less JJR 16440 374 11 than than IN 16440 374 12 0.01 0.01 CD 16440 374 13 . . . 16440 375 1 The the DT 16440 375 2 line line NN 16440 375 3 from from IN 16440 375 4 Bonito Bonito NNP 16440 375 5 Creek Creek NNP 16440 375 6 to to IN 16440 375 7 Nogal Nogal NNP 16440 375 8 Reservoir Reservoir NNP 16440 375 9 was be VBD 16440 375 10 to to TO 16440 375 11 have have VB 16440 375 12 a a DT 16440 375 13 capacity capacity NN 16440 375 14 of of IN 16440 375 15 5 5 CD 16440 375 16 sec sec NNP 16440 375 17 - - HYPH 16440 375 18 ft ft NNP 16440 375 19 . . . 16440 376 1 Referring refer VBG 16440 376 2 to to IN 16440 376 3 the the DT 16440 376 4 profile profile NN 16440 376 5 , , , 16440 376 6 it -PRON- PRP 16440 376 7 was be VBD 16440 376 8 determined determine VBN 16440 376 9 that that IN 16440 376 10 for for IN 16440 376 11 the the DT 16440 376 12 hydraulic hydraulic JJ 16440 376 13 grade grade NN 16440 376 14 of of IN 16440 376 15 33 33 CD 16440 376 16 - - SYM 16440 376 17 1/3 1/3 CD 16440 376 18 ft ft NN 16440 376 19 . . NN 16440 376 20 per per IN 16440 376 21 1000 1000 CD 16440 376 22 ft ft NNP 16440 376 23 . . NNP 16440 376 24 , , , 16440 376 25 a a DT 16440 376 26 10-in 10-in NNP 16440 376 27 . . . 16440 377 1 pipe pipe NN 16440 377 2 was be VBD 16440 377 3 necessary necessary JJ 16440 377 4 , , , 16440 377 5 and and CC 16440 377 6 that that IN 16440 377 7 a a DT 16440 377 8 16-in 16-in XX 16440 377 9 . . . 16440 378 1 pipe pipe NN 16440 378 2 was be VBD 16440 378 3 required require VBN 16440 378 4 for for IN 16440 378 5 the the DT 16440 378 6 grade grade NN 16440 378 7 of of IN 16440 378 8 3 3 CD 16440 378 9 ft ft NN 16440 378 10 . . NNP 16440 378 11 per per IN 16440 378 12 1000 1000 CD 16440 378 13 ft ft NN 16440 378 14 . . NNP 16440 378 15 _ _ NNP 16440 378 16 Test Test NNP 16440 378 17 No no UH 16440 378 18 . . . 16440 379 1 1_.--On 1_.--on CD 16440 379 2 March March NNP 16440 379 3 10th 10th NN 16440 379 4 , , , 16440 379 5 1908 1908 CD 16440 379 6 , , , 16440 379 7 a a DT 16440 379 8 quantity quantity NN 16440 379 9 of of IN 16440 379 10 bran bran NN 16440 379 11 was be VBD 16440 379 12 poured pour VBN 16440 379 13 into into IN 16440 379 14 the the DT 16440 379 15 upper upper JJ 16440 379 16 end end NN 16440 379 17 of of IN 16440 379 18 the the DT 16440 379 19 10-in 10-in NN 16440 379 20 . . . 16440 380 1 pipe pipe NN 16440 380 2 at at IN 16440 380 3 _ _ NNP 16440 380 4 A A NNP 16440 380 5 _ _ NNP 16440 380 6 ( ( -LRB- 16440 380 7 Fig fig NN 16440 380 8 . . . 16440 381 1 2 2 LS 16440 381 2 ) ) -RRB- 16440 381 3 , , , 16440 381 4 and and CC 16440 381 5 the the DT 16440 381 6 time time NN 16440 381 7 of of IN 16440 381 8 its -PRON- PRP$ 16440 381 9 appearance appearance NN 16440 381 10 at at IN 16440 381 11 the the DT 16440 381 12 lower low JJR 16440 381 13 end end NN 16440 381 14 of of IN 16440 381 15 the the DT 16440 381 16 16-in 16-in CD 16440 381 17 . . . 16440 382 1 pipe pipe NN 16440 382 2 at at IN 16440 382 3 _ _ NNP 16440 382 4 E E NNP 16440 382 5 _ _ NNP 16440 382 6 was be VBD 16440 382 7 noted note VBN 16440 382 8 . . . 16440 383 1 The the DT 16440 383 2 time time NN 16440 383 3 was be VBD 16440 383 4 3 3 CD 16440 383 5 hours hour NNS 16440 383 6 and and CC 16440 383 7 50 50 CD 16440 383 8 min min NN 16440 383 9 . . . 16440 384 1 This this DT 16440 384 2 gave give VBD 16440 384 3 : : : 16440 384 4 Area area NN 16440 384 5 of of IN 16440 384 6 10-in 10-in CD 16440 384 7 . . . 16440 385 1 pipe pipe NN 16440 385 2 = = SYM 16440 385 3 0.5454 0.5454 CD 16440 385 4 sq sq NN 16440 385 5 . . . 16440 386 1 ft ft NNP 16440 386 2 . . . 16440 386 3 " " '' 16440 386 4 " " `` 16440 386 5 16 16 CD 16440 386 6 " " '' 16440 386 7 " " '' 16440 386 8 = = SYM 16440 386 9 1.3960 1.3960 CD 16440 386 10 " " `` 16440 386 11 " " `` 16440 386 12 Length Length NNP 16440 386 13 " " '' 16440 386 14 10 10 CD 16440 386 15 " " '' 16440 386 16 " " '' 16440 386 17 = = SYM 16440 386 18 13,200 13,200 CD 16440 386 19 ft ft NN 16440 386 20 . . . 16440 386 21 " " '' 16440 386 22 " " `` 16440 386 23 16 16 CD 16440 386 24 " " '' 16440 386 25 " " '' 16440 386 26 = = SYM 16440 386 27 47,500 47,500 CD 16440 386 28 " " `` 16440 386 29 Time Time NNP 16440 386 30 , , , 16440 386 31 = = SYM 16440 386 32 13,800 13,800 CD 16440 386 33 sec sec NNP 16440 386 34 . . . 16440 387 1 Let let VB 16440 387 2 _ _ NNP 16440 387 3 x x NNP 16440 387 4 _ _ NNP 16440 387 5 = = SYM 16440 387 6 velocity velocity NN 16440 387 7 of of IN 16440 387 8 flow flow NN 16440 387 9 in in IN 16440 387 10 16-in 16-in NNP 16440 387 11 . . . 16440 388 1 pipe pipe NN 16440 388 2 , , , 16440 388 3 in in IN 16440 388 4 feet foot NNS 16440 388 5 per per IN 16440 388 6 second second NN 16440 388 7 , , , 16440 388 8 then then RB 16440 388 9 2.56 2.56 CD 16440 388 10 _ _ NNP 16440 388 11 x x NNP 16440 388 12 _ _ NNP 16440 388 13 = = SYM 16440 388 14 velocity velocity NN 16440 388 15 of of IN 16440 388 16 flow flow NN 16440 388 17 in in IN 16440 388 18 10-in 10-in NNP 16440 388 19 . . . 16440 389 1 pipe pipe NN 16440 389 2 , , , 16440 389 3 in in IN 16440 389 4 feet foot NNS 16440 389 5 per per IN 16440 389 6 second second NN 16440 389 7 . . . 16440 390 1 From from IN 16440 390 2 which which WDT 16440 390 3 : : : 16440 390 4 13,200 13,200 CD 16440 390 5 47,500 47,500 CD 16440 390 6 ------- ------- CD 16440 390 7 + + SYM 16440 390 8 ------- ------- NFP 16440 390 9 = = SYM 16440 390 10 13,800 13,800 CD 16440 390 11 2.56_x 2.56_x CD 16440 390 12 _ _ NNP 16440 390 13 _ _ NNP 16440 390 14 x x NNP 16440 390 15 _ _ NNP 16440 390 16 _ _ NNP 16440 390 17 x x NNP 16440 390 18 _ _ NNP 16440 390 19 = = SYM 16440 390 20 3.805 3.805 CD 16440 390 21 and and CC 16440 390 22 2.56_x 2.56_x CD 16440 390 23 _ _ NN 16440 390 24 = = SYM 16440 390 25 9.740 9.740 CD 16440 390 26 The the DT 16440 390 27 discharge discharge NN 16440 390 28 is be VBZ 16440 390 29 : : : 16440 390 30 For for IN 16440 390 31 the the DT 16440 390 32 16-in 16-in NNS 16440 390 33 . . . 16440 391 1 pipe pipe NN 16440 391 2 , , , 16440 391 3 1.396 1.396 CD 16440 391 4 x x SYM 16440 391 5 3.805 3.805 CD 16440 391 6 = = SYM 16440 391 7 5.31 5.31 CD 16440 391 8 cu cu NNS 16440 391 9 . . . 16440 392 1 ft ft NNP 16440 392 2 . . NNP 16440 392 3 per per IN 16440 392 4 sec sec NNP 16440 392 5 . . . 16440 393 1 ; ; : 16440 393 2 and and CC 16440 393 3 , , , 16440 393 4 for for IN 16440 393 5 the the DT 16440 393 6 10-in 10-in NNP 16440 393 7 . . . 16440 394 1 pipe pipe NN 16440 394 2 , , , 16440 394 3 0.5454 0.5454 CD 16440 394 4 x x SYM 16440 394 5 9.74 9.74 CD 16440 394 6 = = SYM 16440 394 7 5.31 5.31 CD 16440 394 8 cu cu NNS 16440 394 9 . . . 16440 395 1 ft ft NNP 16440 395 2 . . NNP 16440 395 3 per per IN 16440 395 4 sec sec NNP 16440 395 5 . . . 16440 396 1 The the DT 16440 396 2 question question NN 16440 396 3 arose arise VBD 16440 396 4 as as IN 16440 396 5 to to IN 16440 396 6 whether whether IN 16440 396 7 or or CC 16440 396 8 not not RB 16440 396 9 the the DT 16440 396 10 particles particle NNS 16440 396 11 of of IN 16440 396 12 bran bran NN 16440 396 13 in in IN 16440 396 14 the the DT 16440 396 15 water water NN 16440 396 16 traveled travel VBD 16440 396 17 as as RB 16440 396 18 fast fast RB 16440 396 19 as as IN 16440 396 20 the the DT 16440 396 21 water water NN 16440 396 22 flowed flow VBD 16440 396 23 . . . 16440 397 1 It -PRON- PRP 16440 397 2 was be VBD 16440 397 3 also also RB 16440 397 4 desired desire VBN 16440 397 5 to to TO 16440 397 6 check check VB 16440 397 7 by by IN 16440 397 8 observation observation NN 16440 397 9 the the DT 16440 397 10 relative relative JJ 16440 397 11 velocities velocity NNS 16440 397 12 in in IN 16440 397 13 the the DT 16440 397 14 two two CD 16440 397 15 pipes pipe NNS 16440 397 16 , , , 16440 397 17 as as IN 16440 397 18 above above RB 16440 397 19 deduced deduce VBN 16440 397 20 . . . 16440 398 1 _ _ NNP 16440 398 2 Test Test NNP 16440 398 3 No no UH 16440 398 4 . . . 16440 399 1 2_.--To 2_.--to CD 16440 399 2 determine determine VBP 16440 399 3 these these DT 16440 399 4 points point NNS 16440 399 5 , , , 16440 399 6 a a DT 16440 399 7 second second JJ 16440 399 8 test test NN 16440 399 9 was be VBD 16440 399 10 made make VBN 16440 399 11 , , , 16440 399 12 on on IN 16440 399 13 March March NNP 16440 399 14 31st 31st NN 16440 399 15 , , , 16440 399 16 1908 1908 CD 16440 399 17 , , , 16440 399 18 twenty twenty CD 16440 399 19 days day NNS 16440 399 20 after after IN 16440 399 21 the the DT 16440 399 22 first first JJ 16440 399 23 one one CD 16440 399 24 . . . 16440 400 1 In in IN 16440 400 2 this this DT 16440 400 3 test test NN 16440 400 4 , , , 16440 400 5 green green JJ 16440 400 6 aniline aniline NN 16440 400 7 , , , 16440 400 8 red red JJ 16440 400 9 potassium potassium NN 16440 400 10 permanganate permanganate NN 16440 400 11 , , , 16440 400 12 and and CC 16440 400 13 bran bran NN 16440 400 14 were be VBD 16440 400 15 used use VBN 16440 400 16 . . . 16440 401 1 An an DT 16440 401 2 observer observer NN 16440 401 3 was be VBD 16440 401 4 placed place VBN 16440 401 5 at at IN 16440 401 6 the the DT 16440 401 7 end end NN 16440 401 8 of of IN 16440 401 9 the the DT 16440 401 10 10-in 10-in NN 16440 401 11 . . . 16440 402 1 line line NN 16440 402 2 at at IN 16440 402 3 _ _ NNP 16440 402 4 B B NNP 16440 402 5 _ _ NNP 16440 402 6 ( ( -LRB- 16440 402 7 Fig Fig NNP 16440 402 8 . . . 16440 403 1 2 2 LS 16440 403 2 ) ) -RRB- 16440 403 3 , , , 16440 403 4 and and CC 16440 403 5 , , , 16440 403 6 by by IN 16440 403 7 letting let VBG 16440 403 8 a a DT 16440 403 9 small small JJ 16440 403 10 quantity quantity NN 16440 403 11 of of IN 16440 403 12 water water NN 16440 403 13 run run VB 16440 403 14 from from IN 16440 403 15 a a DT 16440 403 16 relief relief NN 16440 403 17 - - HYPH 16440 403 18 valve valve NN 16440 403 19 there there RB 16440 403 20 , , , 16440 403 21 he -PRON- PRP 16440 403 22 was be VBD 16440 403 23 able able JJ 16440 403 24 to to TO 16440 403 25 note note VB 16440 403 26 the the DT 16440 403 27 time time NN 16440 403 28 of of IN 16440 403 29 the the DT 16440 403 30 appearance appearance NN 16440 403 31 of of IN 16440 403 32 the the DT 16440 403 33 colors color NNS 16440 403 34 and and CC 16440 403 35 the the DT 16440 403 36 bran bran NN 16440 403 37 . . . 16440 404 1 The the DT 16440 404 2 green green NN 16440 404 3 was be VBD 16440 404 4 started start VBN 16440 404 5 in in IN 16440 404 6 the the DT 16440 404 7 upper upper JJ 16440 404 8 end end NN 16440 404 9 of of IN 16440 404 10 the the DT 16440 404 11 10-in 10-in NN 16440 404 12 . . . 16440 405 1 pipe pipe NN 16440 405 2 , , , 16440 405 3 at at IN 16440 405 4 _ _ NNP 16440 405 5 A A NNP 16440 405 6 _ _ NNP 16440 405 7 ( ( -LRB- 16440 405 8 Fig fig NN 16440 405 9 . . . 16440 406 1 2 2 LS 16440 406 2 ) ) -RRB- 16440 406 3 , , , 16440 406 4 at at IN 16440 406 5 8.30 8.30 CD 16440 406 6 A.M. A.M. NNP 16440 407 1 It -PRON- PRP 16440 407 2 appeared appear VBD 16440 407 3 at at IN 16440 407 4 _ _ NNP 16440 407 5 B B NNP 16440 407 6 _ _ NNP 16440 407 7 in in IN 16440 407 8 22 22 CD 16440 407 9 min min NNP 16440 407 10 . . NNP 16440 407 11 , , , 16440 407 12 and and CC 16440 407 13 at at IN 16440 407 14 _ _ NNP 16440 407 15 E E NNP 16440 407 16 _ _ NNP 16440 407 17 in in IN 16440 407 18 3 3 CD 16440 407 19 hours hour NNS 16440 407 20 and and CC 16440 407 21 52 52 CD 16440 407 22 min min NN 16440 407 23 . . . 16440 408 1 The the DT 16440 408 2 red red NN 16440 408 3 was be VBD 16440 408 4 started start VBN 16440 408 5 at at IN 16440 408 6 8.45 8.45 CD 16440 408 7 A.M. A.M. NNP 16440 409 1 It -PRON- PRP 16440 409 2 reached reach VBD 16440 409 3 _ _ NNP 16440 409 4 B B NNP 16440 409 5 _ _ NNP 16440 409 6 in in IN 16440 409 7 21 21 CD 16440 409 8 - - SYM 16440 409 9 1/2 1/2 CD 16440 409 10 min min NN 16440 409 11 . . . 16440 409 12 , , , 16440 409 13 but but CC 16440 409 14 it -PRON- PRP 16440 409 15 was be VBD 16440 409 16 so so RB 16440 409 17 faded fade VBN 16440 409 18 that that IN 16440 409 19 the the DT 16440 409 20 time time NN 16440 409 21 of of IN 16440 409 22 its -PRON- PRP$ 16440 409 23 appearance appearance NN 16440 409 24 at at IN 16440 409 25 _ _ NNP 16440 409 26 E E NNP 16440 409 27 _ _ NNP 16440 409 28 could could MD 16440 409 29 not not RB 16440 409 30 be be VB 16440 409 31 noted note VBN 16440 409 32 exactly exactly RB 16440 409 33 . . . 16440 410 1 The the DT 16440 410 2 bran bran NN 16440 410 3 was be VBD 16440 410 4 started start VBN 16440 410 5 at at IN 16440 410 6 9.00 9.00 CD 16440 410 7 A.M. A.M. NNP 16440 411 1 It -PRON- PRP 16440 411 2 reached reach VBD 16440 411 3 _ _ NNP 16440 411 4 B B NNP 16440 411 5 _ _ NNP 16440 411 6 in in IN 16440 411 7 22 22 CD 16440 411 8 min min NNP 16440 411 9 . . NNP 16440 411 10 , , , 16440 411 11 and and CC 16440 411 12 appeared appear VBD 16440 411 13 at at IN 16440 411 14 _ _ NNP 16440 411 15 E E NNP 16440 411 16 _ _ NNP 16440 411 17 in in IN 16440 411 18 3 3 CD 16440 411 19 hours hour NNS 16440 411 20 and and CC 16440 411 21 51 51 CD 16440 411 22 min min NN 16440 411 23 . . . 16440 412 1 From from IN 16440 412 2 the the DT 16440 412 3 average average NN 16440 412 4 of of IN 16440 412 5 these these DT 16440 412 6 figures figure NNS 16440 412 7 , , , 16440 412 8 the the DT 16440 412 9 velocities velocity NNS 16440 412 10 were be VBD 16440 412 11 : : : 16440 412 12 In in IN 16440 412 13 the the DT 16440 412 14 16-in 16-in CD 16440 412 15 . . . 16440 413 1 pipe pipe NN 16440 413 2 , , , 16440 413 3 3.792 3.792 CD 16440 413 4 ft ft NN 16440 413 5 . . NNP 16440 413 6 per per IN 16440 413 7 sec sec NNP 16440 413 8 . . . 16440 413 9 " " '' 16440 414 1 " " `` 16440 414 2 10 10 CD 16440 414 3 " " '' 16440 414 4 " " `` 16440 414 5 9.695 9.695 CD 16440 414 6 " " '' 16440 414 7 " " '' 16440 414 8 " " '' 16440 414 9 and and CC 16440 414 10 the the DT 16440 414 11 discharges discharge NNS 16440 414 12 were be VBD 16440 414 13 : : : 16440 414 14 In in IN 16440 414 15 the the DT 16440 414 16 10-in 10-in NNP 16440 414 17 . . . 16440 415 1 pipe pipe NNP 16440 415 2 , , , 16440 415 3 5.287 5.287 CD 16440 415 4 cu cu XX 16440 415 5 . . . 16440 416 1 ft ft NNP 16440 416 2 . . NNP 16440 416 3 per per IN 16440 416 4 sec sec NNP 16440 416 5 . . . 16440 416 6 " " '' 16440 417 1 " " `` 16440 417 2 16 16 CD 16440 417 3 " " '' 16440 417 4 " " `` 16440 417 5 5.293 5.293 CD 16440 417 6 " " '' 16440 417 7 " " `` 16440 417 8 " " '' 16440 417 9 " " '' 16440 417 10 The the DT 16440 417 11 application application NN 16440 417 12 of of IN 16440 417 13 the the DT 16440 417 14 equation equation NN 16440 417 15 for for IN 16440 417 16 equalized equalize VBN 16440 417 17 relative relative JJ 16440 417 18 velocities velocity NNS 16440 417 19 , , , 16440 417 20 as as IN 16440 417 21 in in IN 16440 417 22 the the DT 16440 417 23 first first JJ 16440 417 24 test test NN 16440 417 25 , , , 16440 417 26 gives give VBZ 16440 417 27 : : : 16440 417 28 Velocity velocity NN 16440 417 29 in in IN 16440 417 30 16-in 16-in NNP 16440 417 31 . . . 16440 418 1 pipe pipe NN 16440 418 2 = = SYM 16440 418 3 9.705 9.705 CD 16440 418 4 " " '' 16440 418 5 " " `` 16440 418 6 10 10 CD 16440 418 7 " " '' 16440 418 8 " " '' 16440 418 9 = = NFP 16440 418 10 3.791 3.791 CD 16440 418 11 Discharge Discharge NNP 16440 418 12 of of IN 16440 418 13 16 16 CD 16440 418 14 " " '' 16440 418 15 " " '' 16440 418 16 = = SYM 16440 418 17 5.292 5.292 CD 16440 418 18 " " '' 16440 418 19 " " `` 16440 418 20 10 10 CD 16440 418 21 " " '' 16440 418 22 " " '' 16440 418 23 = = SYM 16440 418 24 5.293 5.293 CD 16440 418 25 These these DT 16440 418 26 last last JJ 16440 418 27 figures figure NNS 16440 418 28 would would MD 16440 418 29 check check VB 16440 418 30 exactly exactly RB 16440 418 31 , , , 16440 418 32 except except IN 16440 418 33 for for IN 16440 418 34 dropping drop VBG 16440 418 35 figures figure NNS 16440 418 36 in in IN 16440 418 37 the the DT 16440 418 38 fourth fourth JJ 16440 418 39 decimal decimal JJ 16440 418 40 place place NN 16440 418 41 . . . 16440 419 1 The the DT 16440 419 2 results result NNS 16440 419 3 of of IN 16440 419 4 these these DT 16440 419 5 two two CD 16440 419 6 tests test NNS 16440 419 7 , , , 16440 419 8 considering consider VBG 16440 419 9 that that IN 16440 419 10 20 20 CD 16440 419 11 days day NNS 16440 419 12 elapsed elapse VBN 16440 419 13 between between IN 16440 419 14 them -PRON- PRP 16440 419 15 , , , 16440 419 16 are be VBP 16440 419 17 in in IN 16440 419 18 very very RB 16440 419 19 close close JJ 16440 419 20 agreement agreement NN 16440 419 21 , , , 16440 419 22 and and CC 16440 419 23 establish establish VB 16440 419 24 the the DT 16440 419 25 fact fact NN 16440 419 26 that that IN 16440 419 27 bran bran NN 16440 419 28 is be VBZ 16440 419 29 an an DT 16440 419 30 accurate accurate JJ 16440 419 31 medium medium NN 16440 419 32 of of IN 16440 419 33 measurement measurement NN 16440 419 34 . . . 16440 420 1 _ _ NNP 16440 420 2 Test Test NNP 16440 420 3 No no DT 16440 420 4 3_.--The 3_.--The NNP 16440 420 5 500 500 CD 16440 420 6 ft ft NN 16440 420 7 . . NN 16440 420 8 of of IN 16440 420 9 10-in 10-in CD 16440 420 10 . . . 16440 421 1 pipe pipe NN 16440 421 2 in in IN 16440 421 3 the the DT 16440 421 4 16-in 16-in NNP 16440 421 5 . . . 16440 422 1 line line NN 16440 422 2 near near IN 16440 422 3 the the DT 16440 422 4 reservoir reservoir NN 16440 422 5 ( ( -LRB- 16440 422 6 Fig fig NN 16440 422 7 . . . 16440 423 1 2 2 LS 16440 423 2 ) ) -RRB- 16440 423 3 were be VBD 16440 423 4 replaced replace VBN 16440 423 5 by by IN 16440 423 6 16-in 16-in CD 16440 423 7 . . . 16440 424 1 pipe pipe NN 16440 424 2 in in IN 16440 424 3 the the DT 16440 424 4 summer summer NN 16440 424 5 of of IN 16440 424 6 1908 1908 CD 16440 424 7 . . . 16440 425 1 On on IN 16440 425 2 May May NNP 16440 425 3 12th 12th NN 16440 425 4 , , , 16440 425 5 1909 1909 CD 16440 425 6 , , , 16440 425 7 green green JJ 16440 425 8 aniline aniline NN 16440 425 9 was be VBD 16440 425 10 started start VBN 16440 425 11 through through IN 16440 425 12 the the DT 16440 425 13 pipe pipe NN 16440 425 14 at at IN 16440 425 15 _ _ NNP 16440 425 16 A A NNP 16440 425 17 _ _ NNP 16440 425 18 at at IN 16440 425 19 11.00 11.00 CD 16440 425 20 A.M. A.M. NNP 16440 425 21 , , , 16440 425 22 11.30 11.30 CD 16440 425 23 A.M. A.M. NNP 16440 425 24 , , , 16440 425 25 and and CC 16440 425 26 12.00 12.00 CD 16440 425 27 P.M. P.M. NNP 16440 426 1 In in IN 16440 426 2 each each DT 16440 426 3 case case NN 16440 426 4 it -PRON- PRP 16440 426 5 appeared appear VBD 16440 426 6 at at IN 16440 426 7 _ _ NNP 16440 426 8 E E NNP 16440 426 9 _ _ NNP 16440 426 10 in in IN 16440 426 11 3 3 CD 16440 426 12 hours hour NNS 16440 426 13 and and CC 16440 426 14 31 31 CD 16440 426 15 min min NN 16440 426 16 . . . 16440 427 1 This this DT 16440 427 2 time time NN 16440 427 3 is be VBZ 16440 427 4 20 20 CD 16440 427 5 min min NN 16440 427 6 . . . 16440 428 1 less less JJR 16440 428 2 than than IN 16440 428 3 that that DT 16440 428 4 observed observe VBN 16440 428 5 in in IN 16440 428 6 the the DT 16440 428 7 tests test NNS 16440 428 8 of of IN 16440 428 9 the the DT 16440 428 10 previous previous JJ 16440 428 11 year year NN 16440 428 12 , , , 16440 428 13 and and CC 16440 428 14 is be VBZ 16440 428 15 due due JJ 16440 428 16 to to IN 16440 428 17 the the DT 16440 428 18 removal removal NN 16440 428 19 of of IN 16440 428 20 the the DT 16440 428 21 10-in 10-in NNP 16440 428 22 . . . 16440 429 1 pipe pipe NN 16440 429 2 from from IN 16440 429 3 the the DT 16440 429 4 16-in 16-in NNP 16440 429 5 . . . 16440 430 1 line line NN 16440 430 2 and and CC 16440 430 3 to to IN 16440 430 4 the the DT 16440 430 5 increasing increase VBG 16440 430 6 smoothness smoothness NN 16440 430 7 of of IN 16440 430 8 the the DT 16440 430 9 interior interior JJ 16440 430 10 surface surface NN 16440 430 11 of of IN 16440 430 12 the the DT 16440 430 13 pipe pipe NN 16440 430 14 . . . 16440 431 1 The the DT 16440 431 2 relative relative JJ 16440 431 3 velocities velocity NNS 16440 431 4 and and CC 16440 431 5 discharges discharge NNS 16440 431 6 under under IN 16440 431 7 the the DT 16440 431 8 third third JJ 16440 431 9 test test NN 16440 431 10 , , , 16440 431 11 using use VBG 16440 431 12 the the DT 16440 431 13 nomenclature nomenclature NN 16440 431 14 of of IN 16440 431 15 the the DT 16440 431 16 first first JJ 16440 431 17 and and CC 16440 431 18 correcting correct VBG 16440 431 19 the the DT 16440 431 20 lengths length NNS 16440 431 21 of of IN 16440 431 22 pipe pipe NN 16440 431 23 on on IN 16440 431 24 account account NN 16440 431 25 of of IN 16440 431 26 the the DT 16440 431 27 removal removal NN 16440 431 28 of of IN 16440 431 29 the the DT 16440 431 30 10-in 10-in NNP 16440 431 31 . . . 16440 432 1 pipe pipe NN 16440 432 2 near near IN 16440 432 3 the the DT 16440 432 4 reservoir reservoir NN 16440 432 5 , , , 16440 432 6 are be VBP 16440 432 7 : : : 16440 432 8 48,000 48,000 CD 16440 432 9 + + SYM 16440 432 10 12,700 12,700 CD 16440 432 11 ----- ----- CD 16440 432 12 --------- --------- NFP 16440 432 13 = = SYM 16440 432 14 12,660 12,660 CD 16440 432 15 _ _ NNP 16440 432 16 x x NNP 16440 432 17 _ _ NNP 16440 432 18 2.56_x 2.56_x CD 16440 432 19 _ _ NNP 16440 432 20 _ _ NNP 16440 432 21 x x NNP 16440 432 22 _ _ NNP 16440 432 23 = = SYM 16440 432 24 4.183 4.183 CD 16440 432 25 and and CC 16440 432 26 2.56_x 2.56_x CD 16440 432 27 _ _ NNP 16440 432 28 = = SYM 16440 432 29 10.708 10.708 CD 16440 432 30 and and CC 16440 432 31 the the DT 16440 432 32 discharges discharge NNS 16440 432 33 are be VBP 16440 432 34 : : : 16440 432 35 From from IN 16440 432 36 the the DT 16440 432 37 10-in 10-in NNP 16440 432 38 . . . 16440 433 1 pipe pipe NN 16440 433 2 = = SYM 16440 433 3 5.840 5.840 CD 16440 433 4 cu cu NN 16440 433 5 . . . 16440 434 1 ft ft NNP 16440 434 2 . . NNP 16440 434 3 per per IN 16440 434 4 sec sec NNP 16440 434 5 . . . 16440 434 6 " " '' 16440 435 1 " " `` 16440 435 2 16 16 CD 16440 435 3 " " '' 16440 435 4 " " '' 16440 435 5 = = NFP 16440 435 6 5.839 5.839 CD 16440 435 7 " " `` 16440 435 8 " " `` 16440 435 9 " " '' 16440 435 10 " " '' 16440 435 11 _ _ NNP 16440 435 12 Coefficients_.--On Coefficients_.--On NNP 16440 435 13 May May NNP 16440 435 14 12th 12th NN 16440 435 15 , , , 16440 435 16 1909 1909 CD 16440 435 17 , , , 16440 435 18 the the DT 16440 435 19 10-in 10-in NNP 16440 435 20 . . . 16440 436 1 line line NN 16440 436 2 was be VBD 16440 436 3 working work VBG 16440 436 4 on on IN 16440 436 5 a a DT 16440 436 6 grade grade NN 16440 436 7 of of IN 16440 436 8 0.03338 0.03338 CD 16440 436 9 , , , 16440 436 10 and and CC 16440 436 11 , , , 16440 436 12 with with IN 16440 436 13 _ _ NNP 16440 436 14 n n CC 16440 436 15 _ _ NNP 16440 436 16 = = SYM 16440 436 17 0.009 0.009 CD 16440 436 18 , , , 16440 436 19 _ _ NNP 16440 436 20 C C NNP 16440 436 21 _ _ NNP 16440 436 22 should should MD 16440 436 23 have have VB 16440 436 24 been be VBN 16440 436 25 131 131 CD 16440 436 26 . . . 16440 437 1 It -PRON- PRP 16440 437 2 was be VBD 16440 437 3 actually actually RB 16440 437 4 138 138 CD 16440 437 5 , , , 16440 437 6 making make VBG 16440 437 7 _ _ NNP 16440 437 8 n n CC 16440 437 9 _ _ NNP 16440 437 10 = = SYM 16440 437 11 0.00866 0.00866 CD 16440 437 12 . . . 16440 438 1 The the DT 16440 438 2 16-in 16-in CD 16440 438 3 . . . 16440 439 1 line line NN 16440 439 2 was be VBD 16440 439 3 working work VBG 16440 439 4 on on IN 16440 439 5 a a DT 16440 439 6 grade grade NN 16440 439 7 of of IN 16440 439 8 0.0030625 0.0030625 CD 16440 439 9 , , , 16440 439 10 and and CC 16440 439 11 , , , 16440 439 12 with with IN 16440 439 13 _ _ NNP 16440 439 14 n n CC 16440 439 15 _ _ NNP 16440 439 16 = = SYM 16440 439 17 0.009 0.009 CD 16440 439 18 , , , 16440 439 19 _ _ NNP 16440 439 20 C C NNP 16440 439 21 _ _ NNP 16440 439 22 should should MD 16440 439 23 have have VB 16440 439 24 been be VBN 16440 439 25 145 145 CD 16440 439 26 . . . 16440 440 1 It -PRON- PRP 16440 440 2 was be VBD 16440 440 3 actually actually RB 16440 440 4 141 141 CD 16440 440 5 , , , 16440 440 6 making make VBG 16440 440 7 _ _ NNP 16440 440 8 n n CC 16440 440 9 _ _ NNP 16440 440 10 = = SYM 16440 440 11 0.0092 0.0092 CD 16440 440 12 . . . 16440 441 1 Referring refer VBG 16440 441 2 to to IN 16440 441 3 the the DT 16440 441 4 estimated estimate VBN 16440 441 5 hydraulic hydraulic JJ 16440 441 6 grade grade NN 16440 441 7 between between IN 16440 441 8 Coyote Coyote NNP 16440 441 9 and and CC 16440 441 10 Corona Corona NNP 16440 441 11 ( ( -LRB- 16440 441 12 Plate Plate NNP 16440 441 13 V V NNP 16440 441 14 ) ) -RRB- 16440 441 15 , , , 16440 441 16 the the DT 16440 441 17 coefficients coefficient NNS 16440 441 18 , , , 16440 441 19 0.01 0.01 CD 16440 441 20 and and CC 16440 441 21 0.012 0.012 CD 16440 441 22 , , , 16440 441 23 were be VBD 16440 441 24 used use VBN 16440 441 25 for for IN 16440 441 26 wood wood NN 16440 441 27 and and CC 16440 441 28 iron iron NN 16440 441 29 , , , 16440 441 30 respectively respectively RB 16440 441 31 , , , 16440 441 32 on on IN 16440 441 33 which which WDT 16440 441 34 basis basis NN 16440 441 35 , , , 16440 441 36 the the DT 16440 441 37 maximum maximum JJ 16440 441 38 pressure pressure NN 16440 441 39 at at IN 16440 441 40 Coyote Coyote NNP 16440 441 41 was be VBD 16440 441 42 expected expect VBN 16440 441 43 to to TO 16440 441 44 be be VB 16440 441 45 304 304 CD 16440 441 46 lb lb IN 16440 441 47 . . . 16440 442 1 and and CC 16440 442 2 , , , 16440 442 3 at at IN 16440 442 4 Luna Luna NNP 16440 442 5 , , , 16440 442 6 310 310 CD 16440 442 7 lb lb NN 16440 442 8 . . . 16440 443 1 per per IN 16440 443 2 sq sq NNP 16440 443 3 . . . 16440 444 1 in in IN 16440 444 2 . . . 16440 445 1 The the DT 16440 445 2 actual actual JJ 16440 445 3 maximum maximum NN 16440 445 4 at at IN 16440 445 5 Coyote Coyote NNP 16440 445 6 , , , 16440 445 7 with with IN 16440 445 8 pumps pump NNS 16440 445 9 at at IN 16440 445 10 full full JJ 16440 445 11 normal normal JJ 16440 445 12 speed speed NN 16440 445 13 , , , 16440 445 14 was be VBD 16440 445 15 270 270 CD 16440 445 16 lb lb RB 16440 445 17 . . . 16440 445 18 , , , 16440 445 19 and and CC 16440 445 20 , , , 16440 445 21 at at IN 16440 445 22 Luna Luna NNP 16440 445 23 , , , 16440 445 24 278 278 CD 16440 445 25 lb lb RB 16440 445 26 . . . 16440 445 27 , , , 16440 445 28 indicating indicate VBG 16440 445 29 that that IN 16440 445 30 the the DT 16440 445 31 values value NNS 16440 445 32 of of IN 16440 445 33 the the DT 16440 445 34 coefficients coefficient NNS 16440 445 35 taken take VBN 16440 445 36 were be VBD 16440 445 37 too too RB 16440 445 38 high high JJ 16440 445 39 . . . 16440 446 1 This this DT 16440 446 2 checks check NNS 16440 446 3 with with IN 16440 446 4 the the DT 16440 446 5 tests test NNS 16440 446 6 between between IN 16440 446 7 Bonito Bonito NNP 16440 446 8 and and CC 16440 446 9 Nogal Nogal NNP 16440 446 10 . . . 16440 447 1 Of of RB 16440 447 2 course course RB 16440 447 3 , , , 16440 447 4 the the DT 16440 447 5 iron iron NN 16440 447 6 pipe pipe NN 16440 447 7 will will MD 16440 447 8 increase increase VB 16440 447 9 in in IN 16440 447 10 roughness roughness NN 16440 447 11 , , , 16440 447 12 and and CC 16440 447 13 , , , 16440 447 14 in in IN 16440 447 15 time time NN 16440 447 16 the the DT 16440 447 17 pumping pumping NN 16440 447 18 pressure pressure NN 16440 447 19 will will MD 16440 447 20 approach approach VB 16440 447 21 the the DT 16440 447 22 calculated calculate VBN 16440 447 23 amount amount NN 16440 447 24 . . . 16440 448 1 The the DT 16440 448 2 interior interior NN 16440 448 3 of of IN 16440 448 4 the the DT 16440 448 5 iron iron NN 16440 448 6 pipe pipe NN 16440 448 7 now now RB 16440 448 8 has have VBZ 16440 448 9 a a DT 16440 448 10 smooth smooth JJ 16440 448 11 coat coat NN 16440 448 12 of of IN 16440 448 13 asphalt asphalt NN 16440 448 14 . . . 16440 449 1 _ _ NNP 16440 449 2 Pipe Pipe NNP 16440 449 3 Breakage_.--The breakage_.--the CD 16440 449 4 breakage breakage NN 16440 449 5 or or CC 16440 449 6 damage damage NN 16440 449 7 to to IN 16440 449 8 the the DT 16440 449 9 wood wood NN 16440 449 10 pipe pipe NN 16440 449 11 in in IN 16440 449 12 shipment shipment NN 16440 449 13 occurred occur VBD 16440 449 14 on on IN 16440 449 15 the the DT 16440 449 16 ends end NNS 16440 449 17 , , , 16440 449 18 the the DT 16440 449 19 tenons tenon NNS 16440 449 20 being be VBG 16440 449 21 most most RBS 16440 449 22 exposed expose VBN 16440 449 23 to to IN 16440 449 24 injury injury NN 16440 449 25 from from IN 16440 449 26 shifting shift VBG 16440 449 27 in in IN 16440 449 28 the the DT 16440 449 29 cars car NNS 16440 449 30 . . . 16440 450 1 The the DT 16440 450 2 damage damage NN 16440 450 3 due due IN 16440 450 4 to to IN 16440 450 5 the the DT 16440 450 6 shipment shipment NN 16440 450 7 and and CC 16440 450 8 handling handling NN 16440 450 9 of of IN 16440 450 10 the the DT 16440 450 11 Elmira Elmira NNP 16440 450 12 pipe pipe NN 16440 450 13 was be VBD 16440 450 14 1 1 CD 16440 450 15 % % NN 16440 450 16 and and CC 16440 450 17 one one CD 16440 450 18 - - HYPH 16440 450 19 half half NN 16440 450 20 as as RB 16440 450 21 much much JJ 16440 450 22 for for IN 16440 450 23 the the DT 16440 450 24 Bay Bay NNP 16440 450 25 City City NNP 16440 450 26 pipe pipe NN 16440 450 27 . . . 16440 451 1 Less Less JJR 16440 451 2 than than IN 16440 451 3 6 6 CD 16440 451 4 pieces piece NNS 16440 451 5 out out IN 16440 451 6 of of IN 16440 451 7 100,000 100,000 CD 16440 451 8 laid lay VBN 16440 451 9 have have VBP 16440 451 10 had have VBN 16440 451 11 to to TO 16440 451 12 be be VB 16440 451 13 removed remove VBN 16440 451 14 from from IN 16440 451 15 the the DT 16440 451 16 trench trench NN 16440 451 17 . . . 16440 452 1 The the DT 16440 452 2 iron iron NN 16440 452 3 pipe pipe NN 16440 452 4 came come VBD 16440 452 5 from from IN 16440 452 6 Chattanooga Chattanooga NNP 16440 452 7 , , , 16440 452 8 and and CC 16440 452 9 was be VBD 16440 452 10 badly badly RB 16440 452 11 handled handle VBN 16440 452 12 in in IN 16440 452 13 transit transit NN 16440 452 14 . . . 16440 453 1 Much much JJ 16440 453 2 of of IN 16440 453 3 it -PRON- PRP 16440 453 4 was be VBD 16440 453 5 transferred transfer VBN 16440 453 6 en en IN 16440 453 7 route route NN 16440 453 8 , , , 16440 453 9 and and CC 16440 453 10 6 6 CD 16440 453 11 % % NN 16440 453 12 was be VBD 16440 453 13 broken break VBN 16440 453 14 when when WRB 16440 453 15 received receive VBN 16440 453 16 . . . 16440 454 1 The the DT 16440 454 2 breaks break NNS 16440 454 3 were be VBD 16440 454 4 generally generally RB 16440 454 5 cracks crack NNS 16440 454 6 of of IN 16440 454 7 the the DT 16440 454 8 spigot spigot NN 16440 454 9 end end NN 16440 454 10 . . . 16440 455 1 Of of IN 16440 455 2 this this DT 16440 455 3 broken broken JJ 16440 455 4 pipe pipe NN 16440 455 5 , , , 16440 455 6 practically practically RB 16440 455 7 all all DT 16440 455 8 was be VBD 16440 455 9 cut cut VBN 16440 455 10 and and CC 16440 455 11 laid lay VBN 16440 455 12 . . . 16440 456 1 The the DT 16440 456 2 average average JJ 16440 456 3 cut cut NN 16440 456 4 was be VBD 16440 456 5 about about RB 16440 456 6 16 16 CD 16440 456 7 in in IN 16440 456 8 . . . 16440 457 1 from from IN 16440 457 2 the the DT 16440 457 3 spigot spigot NN 16440 457 4 end end NN 16440 457 5 of of IN 16440 457 6 533 533 CD 16440 457 7 pieces piece NNS 16440 457 8 . . . 16440 458 1 This this DT 16440 458 2 cut cut NN 16440 458 3 pipe pipe NN 16440 458 4 has have VBZ 16440 458 5 caused cause VBN 16440 458 6 no no DT 16440 458 7 trouble trouble NN 16440 458 8 in in IN 16440 458 9 the the DT 16440 458 10 trench trench NN 16440 458 11 . . . 16440 459 1 At at RB 16440 459 2 least least RBS 16440 459 3 27 27 CD 16440 459 4 pieces piece NNS 16440 459 5 of of IN 16440 459 6 cracked crack VBN 16440 459 7 pipe pipe NN 16440 459 8 got get VBD 16440 459 9 past past IN 16440 459 10 the the DT 16440 459 11 field field NN 16440 459 12 inspectors inspector NNS 16440 459 13 and and CC 16440 459 14 into into IN 16440 459 15 the the DT 16440 459 16 trench trench NN 16440 459 17 . . . 16440 460 1 This this DT 16440 460 2 cracked crack VBN 16440 460 3 pipe pipe NN 16440 460 4 began begin VBD 16440 460 5 blowing blow VBG 16440 460 6 out out RP 16440 460 7 at at IN 16440 460 8 a a DT 16440 460 9 pressure pressure NN 16440 460 10 of of IN 16440 460 11 50 50 CD 16440 460 12 lb lb XX 16440 460 13 . . . 16440 460 14 , , , 16440 460 15 and and CC 16440 460 16 continued continue VBD 16440 460 17 until until IN 16440 460 18 the the DT 16440 460 19 full full JJ 16440 460 20 normal normal JJ 16440 460 21 pumping pumping NN 16440 460 22 pressure pressure NN 16440 460 23 was be VBD 16440 460 24 reached reach VBN 16440 460 25 , , , 16440 460 26 when when WRB 16440 460 27 the the DT 16440 460 28 breaks break NNS 16440 460 29 suddenly suddenly RB 16440 460 30 ceased cease VBD 16440 460 31 . . . 16440 461 1 These these DT 16440 461 2 pipes pipe NNS 16440 461 3 were be VBD 16440 461 4 broken break VBN 16440 461 5 out out RP 16440 461 6 at at IN 16440 461 7 the the DT 16440 461 8 rate rate NN 16440 461 9 of of IN 16440 461 10 1 1 CD 16440 461 11 or or CC 16440 461 12 2 2 CD 16440 461 13 per per IN 16440 461 14 day day NN 16440 461 15 , , , 16440 461 16 with with IN 16440 461 17 an an DT 16440 461 18 occasional occasional JJ 16440 461 19 day day NN 16440 461 20 between between IN 16440 461 21 breaks break NNS 16440 461 22 . . . 16440 462 1 A a DT 16440 462 2 24-hour 24-hour CD 16440 462 3 work work NN 16440 462 4 - - HYPH 16440 462 5 train train NN 16440 462 6 service service NN 16440 462 7 was be VBD 16440 462 8 maintained maintain VBN 16440 462 9 . . . 16440 463 1 The the DT 16440 463 2 pipe pipe NN 16440 463 3 gang gang NN 16440 463 4 soon soon RB 16440 463 5 became become VBD 16440 463 6 skilled skilled JJ 16440 463 7 , , , 16440 463 8 and and CC 16440 463 9 could could MD 16440 463 10 put put VB 16440 463 11 in in RP 16440 463 12 a a DT 16440 463 13 new new JJ 16440 463 14 section section NN 16440 463 15 of of IN 16440 463 16 pipe pipe NN 16440 463 17 in in RB 16440 463 18 from from IN 16440 463 19 4 4 CD 16440 463 20 to to IN 16440 463 21 6 6 CD 16440 463 22 hours hour NNS 16440 463 23 . . . 16440 464 1 Each each DT 16440 464 2 break break NN 16440 464 3 generally generally RB 16440 464 4 caused cause VBD 16440 464 5 an an DT 16440 464 6 interruption interruption NN 16440 464 7 of of IN 16440 464 8 about about RB 16440 464 9 6 6 CD 16440 464 10 hours hour NNS 16440 464 11 to to IN 16440 464 12 the the DT 16440 464 13 pumps pump NNS 16440 464 14 on on IN 16440 464 15 the the DT 16440 464 16 section section NN 16440 464 17 where where WRB 16440 464 18 it -PRON- PRP 16440 464 19 occurred occur VBD 16440 464 20 . . . 16440 465 1 The the DT 16440 465 2 best good JJS 16440 465 3 record record NN 16440 465 4 was be VBD 16440 465 5 3 3 CD 16440 465 6 hours hour NNS 16440 465 7 and and CC 16440 465 8 50 50 CD 16440 465 9 min min NN 16440 465 10 . . . 16440 466 1 from from IN 16440 466 2 the the DT 16440 466 3 stopping stopping NN 16440 466 4 to to IN 16440 466 5 the the DT 16440 466 6 starting starting NN 16440 466 7 of of IN 16440 466 8 the the DT 16440 466 9 pumps pump NNS 16440 466 10 . . . 16440 467 1 This this DT 16440 467 2 strenuous strenuous JJ 16440 467 3 life life NN 16440 467 4 lasted last VBD 16440 467 5 30 30 CD 16440 467 6 days day NNS 16440 467 7 . . . 16440 468 1 Most Most JJS 16440 468 2 of of IN 16440 468 3 these these DT 16440 468 4 breaks break NNS 16440 468 5 were be VBD 16440 468 6 in in RB 16440 468 7 or or CC 16440 468 8 near near IN 16440 468 9 the the DT 16440 468 10 middle middle NN 16440 468 11 of of IN 16440 468 12 the the DT 16440 468 13 pipe pipe NN 16440 468 14 . . . 16440 469 1 Evidently evidently RB 16440 469 2 , , , 16440 469 3 the the DT 16440 469 4 field field NN 16440 469 5 inspectors inspector NNS 16440 469 6 were be VBD 16440 469 7 not not RB 16440 469 8 expecting expect VBG 16440 469 9 cracks crack NNS 16440 469 10 in in IN 16440 469 11 that that DT 16440 469 12 locality locality NN 16440 469 13 . . . 16440 470 1 An an DT 16440 470 2 inspection inspection NN 16440 470 3 usually usually RB 16440 470 4 indicated indicate VBD 16440 470 5 that that IN 16440 470 6 the the DT 16440 470 7 pipe pipe NN 16440 470 8 had have VBD 16440 470 9 been be VBN 16440 470 10 struck strike VBN 16440 470 11 by by IN 16440 470 12 the the DT 16440 470 13 bell bell NN 16440 470 14 of of IN 16440 470 15 another another DT 16440 470 16 one one CD 16440 470 17 in in IN 16440 470 18 the the DT 16440 470 19 vicinity vicinity NN 16440 470 20 of of IN 16440 470 21 the the DT 16440 470 22 break break NN 16440 470 23 . . . 16440 471 1 All all DT 16440 471 2 pipes pipe NNS 16440 471 3 were be VBD 16440 471 4 lifted lift VBN 16440 471 5 from from IN 16440 471 6 the the DT 16440 471 7 car car NN 16440 471 8 carefully carefully RB 16440 471 9 and and CC 16440 471 10 laid lay VBD 16440 471 11 down down RP 16440 471 12 at at IN 16440 471 13 the the DT 16440 471 14 trench trench NN 16440 471 15 along along IN 16440 471 16 the the DT 16440 471 17 track track NN 16440 471 18 in in IN 16440 471 19 a a DT 16440 471 20 single single JJ 16440 471 21 movement movement NN 16440 471 22 by by IN 16440 471 23 a a DT 16440 471 24 logging log VBG 16440 471 25 crane crane NN 16440 471 26 , , , 16440 471 27 and and CC 16440 471 28 were be VBD 16440 471 29 not not RB 16440 471 30 broken break VBN 16440 471 31 in in IN 16440 471 32 such such JJ 16440 471 33 handling handling NN 16440 471 34 . . . 16440 472 1 Three three CD 16440 472 2 breaks break NNS 16440 472 3 only only RB 16440 472 4 have have VBP 16440 472 5 been be VBN 16440 472 6 reported report VBN 16440 472 7 as as IN 16440 472 8 due due JJ 16440 472 9 to to IN 16440 472 10 defective defective JJ 16440 472 11 metal metal NN 16440 472 12 or or CC 16440 472 13 casting casting NN 16440 472 14 . . . 16440 473 1 No no DT 16440 473 2 break break NN 16440 473 3 of of IN 16440 473 4 a a DT 16440 473 5 sound sound JJ 16440 473 6 shell shell NN 16440 473 7 of of IN 16440 473 8 full full JJ 16440 473 9 thickness thickness NN 16440 473 10 has have VBZ 16440 473 11 been be VBN 16440 473 12 found find VBN 16440 473 13 . . . 16440 474 1 _ _ NNP 16440 474 2 Trenching_.--Deep Trenching_.--Deep NNP 16440 474 3 frosts frost NNS 16440 474 4 are be VBP 16440 474 5 unknown unknown JJ 16440 474 6 in in IN 16440 474 7 this this DT 16440 474 8 section section NN 16440 474 9 . . . 16440 475 1 The the DT 16440 475 2 pipe pipe NN 16440 475 3 was be VBD 16440 475 4 laid lay VBN 16440 475 5 so so IN 16440 475 6 that that IN 16440 475 7 the the DT 16440 475 8 top top NN 16440 475 9 was be VBD 16440 475 10 about about RB 16440 475 11 1 1 CD 16440 475 12 ft ft NN 16440 475 13 . . . 16440 475 14 below below IN 16440 475 15 the the DT 16440 475 16 surface surface NN 16440 475 17 of of IN 16440 475 18 the the DT 16440 475 19 ground ground NN 16440 475 20 . . . 16440 476 1 The the DT 16440 476 2 trenching trenching NN 16440 476 3 was be VBD 16440 476 4 a a DT 16440 476 5 simple simple JJ 16440 476 6 matter matter NN 16440 476 7 . . . 16440 477 1 Part part NN 16440 477 2 of of IN 16440 477 3 the the DT 16440 477 4 work work NN 16440 477 5 between between IN 16440 477 6 Bonito Bonito NNP 16440 477 7 and and CC 16440 477 8 the the DT 16440 477 9 railway railway NN 16440 477 10 on on IN 16440 477 11 the the DT 16440 477 12 Carrizozo Carrizozo NNP 16440 477 13 plain plain NN 16440 477 14 was be VBD 16440 477 15 done do VBN 16440 477 16 by by IN 16440 477 17 Buckeye Buckeye NNP 16440 477 18 ditchers ditcher NNS 16440 477 19 . . . 16440 478 1 All all DT 16440 478 2 other other JJ 16440 478 3 ditching ditch VBG 16440 478 4 was be VBD 16440 478 5 done do VBN 16440 478 6 by by IN 16440 478 7 a a DT 16440 478 8 railroad railroad NN 16440 478 9 plow plow NN 16440 478 10 followed follow VBN 16440 478 11 by by IN 16440 478 12 pick pick NN 16440 478 13 and and CC 16440 478 14 shovel shovel NN 16440 478 15 , , , 16440 478 16 or or CC 16440 478 17 by by IN 16440 478 18 the the DT 16440 478 19 two two CD 16440 478 20 latter latter JJ 16440 478 21 tools tool NNS 16440 478 22 only only RB 16440 478 23 . . . 16440 479 1 The the DT 16440 479 2 ditcher ditcher NN 16440 479 3 could could MD 16440 479 4 open open VB 16440 479 5 2,000 2,000 CD 16440 479 6 ft ft NN 16440 479 7 . . NN 16440 479 8 of of IN 16440 479 9 trench trench NN 16440 479 10 per per IN 16440 479 11 day day NN 16440 479 12 , , , 16440 479 13 but but CC 16440 479 14 averaged average VBD 16440 479 15 about about IN 16440 479 16 500 500 CD 16440 479 17 . . . 16440 480 1 The the DT 16440 480 2 plow plow NN 16440 480 3 and and CC 16440 480 4 35 35 CD 16440 480 5 men man NNS 16440 480 6 could could MD 16440 480 7 open open VB 16440 480 8 3,500 3,500 CD 16440 480 9 ft ft NN 16440 480 10 . . . 16440 480 11 A a DT 16440 480 12 chain chain NN 16440 480 13 about about RB 16440 480 14 6 6 CD 16440 480 15 ft ft NN 16440 480 16 . . NN 16440 480 17 long long RB 16440 480 18 separated separate VBD 16440 480 19 the the DT 16440 480 20 end end NN 16440 480 21 of of IN 16440 480 22 the the DT 16440 480 23 plow plow NN 16440 480 24 beam beam NN 16440 480 25 and and CC 16440 480 26 the the DT 16440 480 27 double double JJ 16440 480 28 tree tree NN 16440 480 29 . . . 16440 481 1 In in IN 16440 481 2 this this DT 16440 481 3 way way NN 16440 481 4 the the DT 16440 481 5 trench trench NN 16440 481 6 was be VBD 16440 481 7 plowed plow VBN 16440 481 8 to to IN 16440 481 9 the the DT 16440 481 10 bottom bottom NN 16440 481 11 . . . 16440 482 1 Two two CD 16440 482 2 mules mule NNS 16440 482 3 , , , 16440 482 4 two two CD 16440 482 5 men man NNS 16440 482 6 , , , 16440 482 7 and and CC 16440 482 8 a a DT 16440 482 9 scraper scraper NN 16440 482 10 could could MD 16440 482 11 back back VB 16440 482 12 - - HYPH 16440 482 13 fill fill VB 16440 482 14 3,500 3,500 CD 16440 482 15 ft ft NN 16440 482 16 . . NNP 16440 482 17 per per IN 16440 482 18 day day NN 16440 482 19 . . . 16440 483 1 _ _ NNP 16440 483 2 Pipe Pipe NNP 16440 483 3 Laying_.--Between Laying_.--Between NNP 16440 483 4 Bonito Bonito NNP 16440 483 5 and and CC 16440 483 6 the the DT 16440 483 7 railway railway NN 16440 483 8 , , , 16440 483 9 one one CD 16440 483 10 gang gang NN 16440 483 11 of of IN 16440 483 12 ten ten CD 16440 483 13 men man NNS 16440 483 14 could could MD 16440 483 15 lay lay VB 16440 483 16 4,000 4,000 CD 16440 483 17 ft ft NN 16440 483 18 . . NN 16440 483 19 of of IN 16440 483 20 12-in 12-in CD 16440 483 21 . . . 16440 484 1 pipe pipe NN 16440 484 2 per per IN 16440 484 3 day day NN 16440 484 4 . . . 16440 485 1 The the DT 16440 485 2 average average NN 16440 485 3 was be VBD 16440 485 4 much much RB 16440 485 5 less less JJR 16440 485 6 , , , 16440 485 7 owing owe VBG 16440 485 8 to to IN 16440 485 9 a a DT 16440 485 10 variety variety NN 16440 485 11 of of IN 16440 485 12 causes cause NNS 16440 485 13 . . . 16440 486 1 At at IN 16440 486 2 the the DT 16440 486 3 end end NN 16440 486 4 , , , 16440 486 5 the the DT 16440 486 6 railway railway NN 16440 486 7 company company NN 16440 486 8 added add VBN 16440 486 9 to to IN 16440 486 10 the the DT 16440 486 11 contractor contractor NN 16440 486 12 's 's POS 16440 486 13 force force NN 16440 486 14 , , , 16440 486 15 and and CC 16440 486 16 laid lay VBD 16440 486 17 the the DT 16440 486 18 last last JJ 16440 486 19 10 10 CD 16440 486 20 miles mile NNS 16440 486 21 of of IN 16440 486 22 pipe pipe NN 16440 486 23 in in IN 16440 486 24 7 7 CD 16440 486 25 days day NNS 16440 486 26 , , , 16440 486 27 there there EX 16440 486 28 being be VBG 16440 486 29 a a DT 16440 486 30 half half JJ 16440 486 31 dozen dozen NN 16440 486 32 separate separate JJ 16440 486 33 gangs gang NNS 16440 486 34 at at IN 16440 486 35 work work NN 16440 486 36 . . . 16440 487 1 Along along IN 16440 487 2 the the DT 16440 487 3 railway railway NN 16440 487 4 , , , 16440 487 5 the the DT 16440 487 6 day day NN 16440 487 7 's 's POS 16440 487 8 record record NN 16440 487 9 on on IN 16440 487 10 wood wood NN 16440 487 11 pipe pipe NN 16440 487 12 was be VBD 16440 487 13 4,000 4,000 CD 16440 487 14 ft ft NN 16440 487 15 . . NN 16440 487 16 of of IN 16440 487 17 11-in 11-in NNP 16440 487 18 . . NNP 16440 487 19 , , , 16440 487 20 6,200 6,200 CD 16440 487 21 ft ft NN 16440 487 22 . . NNP 16440 487 23 of of IN 16440 487 24 7 7 CD 16440 487 25 - - SYM 16440 487 26 1/2-in 1/2-in CD 16440 487 27 . . . 16440 488 1 and and CC 16440 488 2 8345 8345 CD 16440 488 3 ft ft NNP 16440 488 4 . . NNP 16440 488 5 of of IN 16440 488 6 3 3 CD 16440 488 7 - - SYM 16440 488 8 1/2-in 1/2-in CD 16440 488 9 , , , 16440 488 10 pipe pipe NN 16440 488 11 laid lay VBN 16440 488 12 by by IN 16440 488 13 a a DT 16440 488 14 gang gang NN 16440 488 15 of of IN 16440 488 16 eight eight CD 16440 488 17 men man NNS 16440 488 18 after after IN 16440 488 19 the the DT 16440 488 20 pipe pipe NN 16440 488 21 was be VBD 16440 488 22 distributed distribute VBN 16440 488 23 along along IN 16440 488 24 the the DT 16440 488 25 trench trench NN 16440 488 26 . . . 16440 489 1 These these DT 16440 489 2 eight eight CD 16440 489 3 men man NNS 16440 489 4 , , , 16440 489 5 of of IN 16440 489 6 whom whom WP 16440 489 7 five five CD 16440 489 8 were be VBD 16440 489 9 Americans Americans NNPS 16440 489 10 , , , 16440 489 11 laid lay VBD 16440 489 12 76 76 CD 16440 489 13 miles mile NNS 16440 489 14 of of IN 16440 489 15 pipe pipe NN 16440 489 16 , , , 16440 489 17 and and CC 16440 489 18 became become VBD 16440 489 19 expert expert JJ 16440 489 20 . . . 16440 490 1 Their -PRON- PRP$ 16440 490 2 operation operation NN 16440 490 3 was be VBD 16440 490 4 like like IN 16440 490 5 the the DT 16440 490 6 working working NN 16440 490 7 of of IN 16440 490 8 a a DT 16440 490 9 clock clock NN 16440 490 10 . . . 16440 491 1 On on IN 16440 491 2 the the DT 16440 491 3 12-in 12-in CD 16440 491 4 . . . 16440 492 1 iron iron NN 16440 492 2 pipe pipe NN 16440 492 3 , , , 16440 492 4 the the DT 16440 492 5 regular regular JJ 16440 492 6 day day NN 16440 492 7 's 's POS 16440 492 8 work work NN 16440 492 9 was be VBD 16440 492 10 96 96 CD 16440 492 11 joints joint NNS 16440 492 12 , , , 16440 492 13 or or CC 16440 492 14 1,152 1,152 CD 16440 492 15 ft ft NN 16440 492 16 . . NN 16440 492 17 of of IN 16440 492 18 pipe pipe NN 16440 492 19 laid lay VBD 16440 492 20 and and CC 16440 492 21 caulked caulk VBD 16440 492 22 . . . 16440 493 1 The the DT 16440 493 2 record record NN 16440 493 3 was be VBD 16440 493 4 1,644 1,644 CD 16440 493 5 ft ft NN 16440 493 6 . . . 16440 493 7 Two two CD 16440 493 8 gangs gang NNS 16440 493 9 laid lay VBD 16440 493 10 101,300 101,300 CD 16440 493 11 lin lin NNP 16440 493 12 . . . 16440 494 1 ft ft NNP 16440 494 2 . . NNP 16440 494 3 in in IN 16440 494 4 60 60 CD 16440 494 5 days day NNS 16440 494 6 . . . 16440 495 1 Such such PDT 16440 495 2 a a DT 16440 495 3 gang gang NN 16440 495 4 consisted consist VBD 16440 495 5 of of IN 16440 495 6 1 1 CD 16440 495 7 foreman foreman NN 16440 495 8 , , , 16440 495 9 1 1 CD 16440 495 10 inspector inspector NN 16440 495 11 , , , 16440 495 12 8 8 CD 16440 495 13 caulkers caulker NNS 16440 495 14 , , , 16440 495 15 4 4 CD 16440 495 16 yarners yarner NNS 16440 495 17 , , , 16440 495 18 1 1 CD 16440 495 19 melter melter NN 16440 495 20 , , , 16440 495 21 1 1 CD 16440 495 22 pourer pourer NN 16440 495 23 , , , 16440 495 24 1 1 CD 16440 495 25 helper helper NN 16440 495 26 , , , 16440 495 27 and and CC 16440 495 28 10 10 CD 16440 495 29 men man NNS 16440 495 30 putting put VBG 16440 495 31 pipe pipe NN 16440 495 32 into into IN 16440 495 33 the the DT 16440 495 34 trench trench NN 16440 495 35 . . . 16440 496 1 _ _ NNP 16440 496 2 Cost Cost VBD 16440 496 3 Data_.--The data_.--the NN 16440 496 4 pipe pipe NN 16440 496 5 from from IN 16440 496 6 Bonito Bonito NNP 16440 496 7 to to IN 16440 496 8 the the DT 16440 496 9 railway railway NN 16440 496 10 was be VBD 16440 496 11 laid lay VBN 16440 496 12 by by IN 16440 496 13 contract contract NN 16440 496 14 . . . 16440 497 1 The the DT 16440 497 2 price price NN 16440 497 3 was be VBD 16440 497 4 18 18 CD 16440 497 5 cents cent NNS 16440 497 6 per per IN 16440 497 7 lin lin NNP 16440 497 8 . . . 16440 498 1 ft ft NNP 16440 498 2 . . NNP 16440 498 3 laid laid NNP 16440 498 4 and and CC 16440 498 5 back back RB 16440 498 6 - - HYPH 16440 498 7 filled fill VBN 16440 498 8 from from IN 16440 498 9 the the DT 16440 498 10 railway railway NN 16440 498 11 to to IN 16440 498 12 the the DT 16440 498 13 Nogal Nogal NNP 16440 498 14 Reservoir Reservoir NNP 16440 498 15 , , , 16440 498 16 and and CC 16440 498 17 28 28 CD 16440 498 18 cents cent NNS 16440 498 19 from from IN 16440 498 20 Nogal Nogal NNP 16440 498 21 to to IN 16440 498 22 Bonito Bonito NNP 16440 498 23 . . . 16440 499 1 In in IN 16440 499 2 addition addition NN 16440 499 3 , , , 16440 499 4 50 50 CD 16440 499 5 cents cent NNS 16440 499 6 per per IN 16440 499 7 ton ton NN 16440 499 8 per per IN 16440 499 9 mile mile NN 16440 499 10 was be VBD 16440 499 11 paid pay VBN 16440 499 12 for for IN 16440 499 13 hauling haul VBG 16440 499 14 pipe pipe NN 16440 499 15 , , , 16440 499 16 and and CC 16440 499 17 extra extra JJ 16440 499 18 compensation compensation NN 16440 499 19 for for IN 16440 499 20 setting set VBG 16440 499 21 valves valve NNS 16440 499 22 . . . 16440 500 1 From from IN 16440 500 2 Coyote Coyote NNP 16440 500 3 , , , 16440 500 4 east east NN 16440 500 5 along along IN 16440 500 6 the the DT 16440 500 7 railway railway NN 16440 500 8 , , , 16440 500 9 the the DT 16440 500 10 work work NN 16440 500 11 was be VBD 16440 500 12 done do VBN 16440 500 13 by by IN 16440 500 14 the the DT 16440 500 15 railway railway NN 16440 500 16 company company NN 16440 500 17 under under IN 16440 500 18 the the DT 16440 500 19 writer writer NN 16440 500 20 's 's POS 16440 500 21 direction direction NN 16440 500 22 . . . 16440 501 1 The the DT 16440 501 2 total total JJ 16440 501 3 cost cost NN 16440 501 4 of of IN 16440 501 5 laying lay VBG 16440 501 6 384,300 384,300 CD 16440 501 7 ft ft NN 16440 501 8 . . NN 16440 501 9 of of IN 16440 501 10 wood wood NN 16440 501 11 pipe pipe NN 16440 501 12 , , , 16440 501 13 from from IN 16440 501 14 11 11 CD 16440 501 15 to to TO 16440 501 16 3 3 CD 16440 501 17 - - SYM 16440 501 18 1/2 1/2 CD 16440 501 19 in in IN 16440 501 20 . . . 16440 502 1 in in IN 16440 502 2 diameter diameter NN 16440 502 3 , , , 16440 502 4 was be VBD 16440 502 5 $ $ $ 16440 502 6 18,156.77 18,156.77 CD 16440 502 7 , , , 16440 502 8 or or CC 16440 502 9 4.72 4.72 CD 16440 502 10 cents cent NNS 16440 502 11 per per IN 16440 502 12 ft ft NNP 16440 502 13 . . NNP 16440 502 14 , , , 16440 502 15 divided divide VBN 16440 502 16 as as IN 16440 502 17 follows follow VBZ 16440 502 18 : : : 16440 502 19 Ditching ditch VBG 16440 502 20 $ $ $ 16440 502 21 0.0249 0.0249 CD 16440 502 22 Laying lay VBG 16440 502 23 0.0113 0.0113 CD 16440 502 24 Back back RB 16440 502 25 - - HYPH 16440 502 26 filling filling NN 16440 502 27 0.0110 0.0110 CD 16440 502 28 ------- ------- NFP 16440 502 29 Total total NN 16440 502 30 $ $ $ 16440 502 31 0.0472 0.0472 CD 16440 502 32 This this DT 16440 502 33 includes include VBZ 16440 502 34 unloading unloading NN 16440 502 35 from from IN 16440 502 36 the the DT 16440 502 37 cars car NNS 16440 502 38 . . . 16440 503 1 Train train NN 16440 503 2 service service NN 16440 503 3 cost cost VBP 16440 503 4 1/3 1/3 CD 16440 503 5 cent cent NN 16440 503 6 per per IN 16440 503 7 ft ft FW 16440 503 8 . . . 16440 503 9 additional additional JJ 16440 503 10 . . . 16440 504 1 The the DT 16440 504 2 pipe pipe NN 16440 504 3 gang gang NN 16440 504 4 , , , 16440 504 5 including include VBG 16440 504 6 back back NN 16440 504 7 - - HYPH 16440 504 8 filling filling NN 16440 504 9 , , , 16440 504 10 consisted consist VBD 16440 504 11 of of IN 16440 504 12 1 1 CD 16440 504 13 foreman foreman NN 16440 504 14 , , , 16440 504 15 at at IN 16440 504 16 $ $ $ 16440 504 17 100 100 CD 16440 504 18 per per IN 16440 504 19 month month NN 16440 504 20 , , , 16440 504 21 one one CD 16440 504 22 assistant assistant NN 16440 504 23 foreman foreman NN 16440 504 24 at at IN 16440 504 25 $ $ $ 16440 504 26 75 75 CD 16440 504 27 , , , 16440 504 28 and and CC 16440 504 29 about about RB 16440 504 30 30 30 CD 16440 504 31 Mexicans Mexicans NNPS 16440 504 32 at at IN 16440 504 33 $ $ $ 16440 504 34 1 1 CD 16440 504 35 per per IN 16440 504 36 day day NN 16440 504 37 . . . 16440 505 1 The the DT 16440 505 2 rates rate NNS 16440 505 3 were be VBD 16440 505 4 the the DT 16440 505 5 same same JJ 16440 505 6 in in IN 16440 505 7 the the DT 16440 505 8 ditching ditch VBG 16440 505 9 gang gang NN 16440 505 10 . . . 16440 506 1 The the DT 16440 506 2 plow plow NN 16440 506 3 team team NN 16440 506 4 cost cost VBD 16440 506 5 $ $ $ 16440 506 6 6 6 CD 16440 506 7 per per IN 16440 506 8 day day NN 16440 506 9 . . . 16440 507 1 Including include VBG 16440 507 2 all all DT 16440 507 3 general general JJ 16440 507 4 expense expense NN 16440 507 5 , , , 16440 507 6 the the DT 16440 507 7 cost cost NN 16440 507 8 does do VBZ 16440 507 9 not not RB 16440 507 10 exceed exceed VB 16440 507 11 6 6 CD 16440 507 12 cents cent NNS 16440 507 13 per per IN 16440 507 14 lin lin NNP 16440 507 15 . . . 16440 508 1 ft ft IN 16440 508 2 . . . 16440 509 1 The the DT 16440 509 2 cost cost NN 16440 509 3 of of IN 16440 509 4 laying lay VBG 16440 509 5 101,300 101,300 CD 16440 509 6 ft ft NN 16440 509 7 . . NNP 16440 509 8 of of IN 16440 509 9 12-in 12-in CD 16440 509 10 . . . 16440 510 1 cast cast VBN 16440 510 2 - - HYPH 16440 510 3 iron iron NN 16440 510 4 pipe pipe NN 16440 510 5 was be VBD 16440 510 6 $ $ $ 16440 510 7 23826.67 23826.67 CD 16440 510 8 , , , 16440 510 9 or or CC 16440 510 10 23.5 23.5 CD 16440 510 11 cents cent NNS 16440 510 12 per per IN 16440 510 13 ft ft NNP 16440 510 14 . . NNP 16440 510 15 , , , 16440 510 16 divided divide VBN 16440 510 17 as as IN 16440 510 18 follows follow VBZ 16440 510 19 : : : 16440 510 20 Ditching ditch VBG 16440 510 21 $ $ $ 16440 510 22 0.0249 0.0249 CD 16440 510 23 Laying lay VBG 16440 510 24 0.1180 0.1180 CD 16440 510 25 Back back RB 16440 510 26 - - HYPH 16440 510 27 filling filling NN 16440 510 28 0.0110 0.0110 CD 16440 510 29 Lead lead NN 16440 510 30 0.0790 0.0790 CD 16440 510 31 Oakum Oakum NNP 16440 510 32 0.0014 0.0014 CD 16440 510 33 ------- ------- NFP 16440 510 34 Total total NN 16440 510 35 $ $ $ 16440 510 36 0.2343 0.2343 CD 16440 510 37 This this DT 16440 510 38 includes include VBZ 16440 510 39 train train NN 16440 510 40 service service NN 16440 510 41 and and CC 16440 510 42 unloading unloading NN 16440 510 43 pipe pipe NN 16440 510 44 , , , 16440 510 45 but but CC 16440 510 46 nothing nothing NN 16440 510 47 for for IN 16440 510 48 tools tool NNS 16440 510 49 . . . 16440 511 1 The the DT 16440 511 2 foreman foreman NN 16440 511 3 and and CC 16440 511 4 inspector inspector NN 16440 511 5 received receive VBD 16440 511 6 $ $ $ 16440 511 7 100 100 CD 16440 511 8 per per IN 16440 511 9 month month NN 16440 511 10 , , , 16440 511 11 the the DT 16440 511 12 caulkers caulker NNS 16440 511 13 , , , 16440 511 14 $ $ $ 16440 511 15 3 3 CD 16440 511 16 ; ; : 16440 511 17 pourer pourer NN 16440 511 18 , , , 16440 511 19 $ $ $ 16440 511 20 3 3 CD 16440 511 21 ; ; : 16440 511 22 melter melter NN 16440 511 23 , , , 16440 511 24 $ $ $ 16440 511 25 2.50 2.50 CD 16440 511 26 ; ; SYM 16440 511 27 2 2 CD 16440 511 28 pipe pipe NN 16440 511 29 - - HYPH 16440 511 30 men man NNS 16440 511 31 , , , 16440 511 32 $ $ $ 16440 511 33 2 2 CD 16440 511 34 , , , 16440 511 35 and and CC 16440 511 36 laborers laborer NNS 16440 511 37 , , , 16440 511 38 $ $ $ 16440 511 39 1 1 CD 16440 511 40 per per IN 16440 511 41 day day NN 16440 511 42 . . . 16440 512 1 Professional professional JJ 16440 512 2 caulkers caulker NNS 16440 512 3 wanted want VBD 16440 512 4 $ $ $ 16440 512 5 5 5 CD 16440 512 6 per per IN 16440 512 7 day day NN 16440 512 8 . . . 16440 513 1 Carpenters carpenter NNS 16440 513 2 , , , 16440 513 3 blacksmiths blacksmith NNS 16440 513 4 , , , 16440 513 5 and and CC 16440 513 6 boiler boiler NN 16440 513 7 - - HYPH 16440 513 8 makers maker NNS 16440 513 9 made make VBD 16440 513 10 good good JJ 16440 513 11 caulkers caulker NNS 16440 513 12 ; ; : 16440 513 13 their -PRON- PRP$ 16440 513 14 work work NN 16440 513 15 is be VBZ 16440 513 16 standing stand VBG 16440 513 17 perfectly perfectly RB 16440 513 18 under under IN 16440 513 19 a a DT 16440 513 20 275-lb 275-lb CD 16440 513 21 . . . 16440 514 1 service service NN 16440 514 2 . . . 16440 515 1 The the DT 16440 515 2 cost cost NN 16440 515 3 of of IN 16440 515 4 the the DT 16440 515 5 pumping pumping NN 16440 515 6 plants plant NNS 16440 515 7 complete complete JJ 16440 515 8 per per IN 16440 515 9 horse horse NN 16440 515 10 - - HYPH 16440 515 11 power power NN 16440 515 12 is be VBZ 16440 515 13 as as IN 16440 515 14 follows follow VBZ 16440 515 15 : : : 16440 515 16 Pumps pump NNS 16440 515 17 $ $ $ 16440 515 18 79.00 79.00 CD 16440 515 19 Boilers boiler NNS 16440 515 20 18.70 18.70 CD 16440 515 21 Building Building NNP 16440 515 22 41.70 41.70 CD 16440 515 23 ------ ------ : 16440 515 24 Total total NN 16440 515 25 $ $ $ 16440 515 26 139.40 139.40 CD 16440 515 27 per per IN 16440 515 28 h.p h.p NNP 16440 515 29 . . . 16440 516 1 The the DT 16440 516 2 approximate approximate JJ 16440 516 3 cost cost NN 16440 516 4 per per IN 16440 516 5 million million CD 16440 516 6 gallons gallon NNS 16440 516 7 of of IN 16440 516 8 storage storage NN 16440 516 9 capacity capacity NN 16440 516 10 is be VBZ 16440 516 11 as as IN 16440 516 12 follows follow VBZ 16440 516 13 : : : 16440 516 14 Nogal Nogal NNP 16440 516 15 Storage Storage NNP 16440 516 16 Reservoir Reservoir NNP 16440 516 17 $ $ $ 16440 516 18 103.00 103.00 CD 16440 516 19 Carrizozo Carrizozo NNP 16440 516 20 Service Service NNP 16440 516 21 " " '' 16440 516 22 3,040.00 3,040.00 CD 16440 516 23 Coyote Coyote NNP 16440 516 24 " " '' 16440 516 25 " " `` 16440 516 26 2,880.00 2,880.00 CD 16440 516 27 Luna Luna NNP 16440 516 28 " " '' 16440 516 29 " " `` 16440 516 30 3,480.00 3,480.00 CD 16440 516 31 Corona Corona NNP 16440 516 32 " " '' 16440 516 33 " " `` 16440 516 34 2,720.00 2,720.00 CD 16440 516 35 To to TO 16440 516 36 cover cover VB 16440 516 37 general general JJ 16440 516 38 expense expense NN 16440 516 39 , , , 16440 516 40 3 3 CD 16440 516 41 % % NN 16440 516 42 should should MD 16440 516 43 be be VB 16440 516 44 added add VBN 16440 516 45 to to IN 16440 516 46 all all PDT 16440 516 47 the the DT 16440 516 48 costs cost NNS 16440 516 49 above above IN 16440 516 50 given give VBN 16440 516 51 . . . 16440 517 1 The the DT 16440 517 2 costs cost NNS 16440 517 3 per per IN 16440 517 4 foot foot NN 16440 517 5 of of IN 16440 517 6 pipe pipe NN 16440 517 7 - - HYPH 16440 517 8 laying lay VBG 16440 517 9 include include VBP 16440 517 10 the the DT 16440 517 11 setting setting NN 16440 517 12 of of IN 16440 517 13 all all DT 16440 517 14 specials special NNS 16440 517 15 , , , 16440 517 16 valves valve NNS 16440 517 17 , , , 16440 517 18 and and CC 16440 517 19 stand stand VB 16440 517 20 - - HYPH 16440 517 21 pipes pipe NNS 16440 517 22 . . . 16440 518 1 The the DT 16440 518 2 difference difference NN 16440 518 3 of of IN 16440 518 4 cost cost NN 16440 518 5 in in IN 16440 518 6 laying lay VBG 16440 518 7 11-in 11-in CD 16440 518 8 . . . 16440 519 1 and and CC 16440 519 2 3 3 CD 16440 519 3 - - SYM 16440 519 4 1/2-in 1/2-in CD 16440 519 5 . . . 16440 520 1 wood wood NN 16440 520 2 pipe pipe NN 16440 520 3 is be VBZ 16440 520 4 not not RB 16440 520 5 nearly nearly RB 16440 520 6 as as RB 16440 520 7 great great JJ 16440 520 8 as as IN 16440 520 9 the the DT 16440 520 10 difference difference NN 16440 520 11 in in IN 16440 520 12 diameter diameter NN 16440 520 13 or or CC 16440 520 14 the the DT 16440 520 15 total total JJ 16440 520 16 quantity quantity NN 16440 520 17 laid lay VBN 16440 520 18 on on IN 16440 520 19 record record NN 16440 520 20 days day NNS 16440 520 21 . . . 16440 521 1 While while IN 16440 521 2 the the DT 16440 521 3 record record NN 16440 521 4 is be VBZ 16440 521 5 4,000 4,000 CD 16440 521 6 ft ft NN 16440 521 7 . . . 16440 521 8 and and CC 16440 521 9 8,345 8,345 CD 16440 521 10 ft ft NNP 16440 521 11 . . NNP 16440 521 12 , , , 16440 521 13 the the DT 16440 521 14 76 76 CD 16440 521 15 miles mile NNS 16440 521 16 of of IN 16440 521 17 pipe pipe NN 16440 521 18 of of IN 16440 521 19 all all DT 16440 521 20 diameters diameter NNS 16440 521 21 were be VBD 16440 521 22 laid lay VBN 16440 521 23 in in IN 16440 521 24 a a DT 16440 521 25 total total JJ 16440 521 26 time time NN 16440 521 27 , , , 16440 521 28 including include VBG 16440 521 29 all all DT 16440 521 30 delays delay NNS 16440 521 31 , , , 16440 521 32 of of IN 16440 521 33 223 223 CD 16440 521 34 days day NNS 16440 521 35 , , , 16440 521 36 or or CC 16440 521 37 an an DT 16440 521 38 average average NN 16440 521 39 of of IN 16440 521 40 only only RB 16440 521 41 1723 1723 CD 16440 521 42 ft ft NNP 16440 521 43 . . NNP 16440 521 44 per per IN 16440 521 45 day day NN 16440 521 46 . . . 16440 522 1 The the DT 16440 522 2 cost cost NN 16440 522 3 of of IN 16440 522 4 the the DT 16440 522 5 11-in 11-in CD 16440 522 6 . . . 16440 523 1 pipe pipe NN 16440 523 2 is be VBZ 16440 523 3 covered cover VBN 16440 523 4 by by IN 16440 523 5 7 7 CD 16440 523 6 cents cent NNS 16440 523 7 per per IN 16440 523 8 ft ft NN 16440 523 9 . . . 16440 524 1 The the DT 16440 524 2 pipe pipe NN 16440 524 3 was be VBD 16440 524 4 laid lay VBN 16440 524 5 by by IN 16440 524 6 a a DT 16440 524 7 single single JJ 16440 524 8 gang gang NN 16440 524 9 as as RB 16440 524 10 fast fast RB 16440 524 11 as as IN 16440 524 12 it -PRON- PRP 16440 524 13 was be VBD 16440 524 14 received receive VBN 16440 524 15 from from IN 16440 524 16 the the DT 16440 524 17 factory factory NN 16440 524 18 . . . 16440 525 1 The the DT 16440 525 2 reduction reduction NN 16440 525 3 from from IN 16440 525 4 7 7 CD 16440 525 5 to to TO 16440 525 6 3 3 CD 16440 525 7 - - SYM 16440 525 8 1/2 1/2 CD 16440 525 9 in in IN 16440 525 10 . . . 16440 526 1 at at IN 16440 526 2 Mile Mile NNP 16440 526 3 230 230 CD 16440 526 4 ( ( -LRB- 16440 526 5 Plate plate NN 16440 526 6 V V NNP 16440 526 7 ) ) -RRB- 16440 526 8 is be VBZ 16440 526 9 on on IN 16440 526 10 account account NN 16440 526 11 of of IN 16440 526 12 delivering deliver VBG 16440 526 13 water water NN 16440 526 14 to to IN 16440 526 15 the the DT 16440 526 16 Santa Santa NNP 16440 526 17 Fà Fà NNP 16440 526 18 © © NNP 16440 526 19 's 's POS 16440 526 20 new new JJ 16440 526 21 transcontinental transcontinental JJ 16440 526 22 low low JJ 16440 526 23 - - HYPH 16440 526 24 grade grade NN 16440 526 25 line line NN 16440 526 26 which which WDT 16440 526 27 crosses cross VBZ 16440 526 28 the the DT 16440 526 29 El El NNP 16440 526 30 Paso Paso NNP 16440 526 31 and and CC 16440 526 32 Southwestern Southwestern NNP 16440 526 33 Railway Railway NNP 16440 526 34 at at IN 16440 526 35 Vaughn Vaughn NNP 16440 526 36 , , , 16440 526 37 and and CC 16440 526 38 has have VBZ 16440 526 39 a a DT 16440 526 40 division division NN 16440 526 41 point point NN 16440 526 42 there there RB 16440 526 43 . . . 16440 527 1 On on IN 16440 527 2 its -PRON- PRP$ 16440 527 3 adjacent adjacent JJ 16440 527 4 divisions division NNS 16440 527 5 , , , 16440 527 6 the the DT 16440 527 7 Santa Santa NNP 16440 527 8 Fà Fà NNP 16440 527 9 © © NNP 16440 527 10 had have VBD 16440 527 11 the the DT 16440 527 12 same same JJ 16440 527 13 trouble trouble NN 16440 527 14 with with IN 16440 527 15 local local JJ 16440 527 16 waters water NNS 16440 527 17 which which WDT 16440 527 18 compelled compel VBD 16440 527 19 the the DT 16440 527 20 El El NNP 16440 527 21 Paso Paso NNP 16440 527 22 and and CC 16440 527 23 Southwestern Southwestern NNP 16440 527 24 to to TO 16440 527 25 find find VB 16440 527 26 a a DT 16440 527 27 better well JJR 16440 527 28 supply supply NN 16440 527 29 . . . 16440 528 1 The the DT 16440 528 2 Bonito Bonito NNP 16440 528 3 water water NN 16440 528 4 is be VBZ 16440 528 5 conducted conduct VBN 16440 528 6 to to IN 16440 528 7 and and CC 16440 528 8 used use VBN 16440 528 9 at at IN 16440 528 10 points point NNS 16440 528 11 160 160 CD 16440 528 12 miles mile NNS 16440 528 13 from from IN 16440 528 14 its -PRON- PRP$ 16440 528 15 origin origin NN 16440 528 16 on on IN 16440 528 17 Bonito Bonito NNP 16440 528 18 Creek Creek NNP 16440 528 19 . . . 16440 529 1 DISCUSSION DISCUSSION NNP 16440 529 2 G.E.P. G.E.P. NNP 16440 530 1 SMITH SMITH NNP 16440 530 2 , , , 16440 530 3 ASSOC ASSOC NNP 16440 530 4 . . . 16440 531 1 M. M. NNP 16440 531 2 AM AM NNP 16440 531 3 . . . 16440 532 1 SOC SOC NNP 16440 532 2 . . . 16440 533 1 C.E. C.E. NNP 16440 534 1 ( ( -LRB- 16440 534 2 by by IN 16440 534 3 letter).--The letter).--the NN 16440 534 4 author author NN 16440 534 5 has have VBZ 16440 534 6 done do VBN 16440 534 7 great great JJ 16440 534 8 service service NN 16440 534 9 to to IN 16440 534 10 the the DT 16440 534 11 West West NNP 16440 534 12 in in IN 16440 534 13 demonstrating demonstrate VBG 16440 534 14 the the DT 16440 534 15 practicability practicability NN 16440 534 16 of of IN 16440 534 17 transporting transport VBG 16440 534 18 small small JJ 16440 534 19 water water NN 16440 534 20 supplies supply NNS 16440 534 21 to to IN 16440 534 22 great great JJ 16440 534 23 distances distance NNS 16440 534 24 . . . 16440 535 1 Close close JJ 16440 535 2 association association NN 16440 535 3 with with IN 16440 535 4 the the DT 16440 535 5 desert desert NN 16440 535 6 is be VBZ 16440 535 7 required require VBN 16440 535 8 to to TO 16440 535 9 appreciate appreciate VB 16440 535 10 fully fully RB 16440 535 11 its -PRON- PRP$ 16440 535 12 waterless waterless JJ 16440 535 13 condition condition NN 16440 535 14 . . . 16440 536 1 For for IN 16440 536 2 most most JJS 16440 536 3 of of IN 16440 536 4 the the DT 16440 536 5 year year NN 16440 536 6 there there EX 16440 536 7 are be VBP 16440 536 8 no no DT 16440 536 9 living live VBG 16440 536 10 waters water NNS 16440 536 11 on on IN 16440 536 12 the the DT 16440 536 13 surface surface NN 16440 536 14 . . . 16440 537 1 As as IN 16440 537 2 a a DT 16440 537 3 rule rule NN 16440 537 4 , , , 16440 537 5 ground ground NN 16440 537 6 - - HYPH 16440 537 7 waters water NNS 16440 537 8 are be VBP 16440 537 9 concentrated concentrate VBN 16440 537 10 beneath beneath IN 16440 537 11 very very RB 16440 537 12 limited limited JJ 16440 537 13 areas area NNS 16440 537 14 of of IN 16440 537 15 valley valley NNP 16440 537 16 land land NN 16440 537 17 . . . 16440 538 1 The the DT 16440 538 2 great great JJ 16440 538 3 masses masse NNS 16440 538 4 of of IN 16440 538 5 valley valley NNP 16440 538 6 fill fill VBP 16440 538 7 in in RP 16440 538 8 some some DT 16440 538 9 places place NNS 16440 538 10 are be VBP 16440 538 11 underdrained underdrained JJ 16440 538 12 to to IN 16440 538 13 great great JJ 16440 538 14 depths depth NNS 16440 538 15 and and CC 16440 538 16 in in IN 16440 538 17 other other JJ 16440 538 18 places place NNS 16440 538 19 are be VBP 16440 538 20 so so RB 16440 538 21 compacted compacted JJ 16440 538 22 and and CC 16440 538 23 cemented cement VBD 16440 538 24 as as IN 16440 538 25 to to TO 16440 538 26 be be VB 16440 538 27 impervious impervious JJ 16440 538 28 . . . 16440 539 1 Wells Wells NNP 16440 539 2 sometimes sometimes RB 16440 539 3 are be VBP 16440 539 4 driven drive VBN 16440 539 5 from from IN 16440 539 6 1,000 1,000 CD 16440 539 7 to to IN 16440 539 8 2,000 2,000 CD 16440 539 9 ft ft NN 16440 539 10 . . NNP 16440 539 11 , , , 16440 539 12 without without IN 16440 539 13 securing secure VBG 16440 539 14 any any DT 16440 539 15 supply supply NN 16440 539 16 at at RB 16440 539 17 all all RB 16440 539 18 . . . 16440 540 1 Moreover moreover RB 16440 540 2 , , , 16440 540 3 desert desert NN 16440 540 4 ground ground NN 16440 540 5 - - HYPH 16440 540 6 waters water NNS 16440 540 7 are be VBP 16440 540 8 often often RB 16440 540 9 exceedingly exceedingly RB 16440 540 10 hard hard JJ 16440 540 11 or or CC 16440 540 12 alkaline alkaline VBP 16440 540 13 , , , 16440 540 14 and and CC 16440 540 15 , , , 16440 540 16 therefore therefore RB 16440 540 17 , , , 16440 540 18 are be VBP 16440 540 19 unfit unfit JJ 16440 540 20 for for IN 16440 540 21 many many JJ 16440 540 22 uses use NNS 16440 540 23 . . . 16440 541 1 In in IN 16440 541 2 going go VBG 16440 541 3 to to IN 16440 541 4 the the DT 16440 541 5 high high JJ 16440 541 6 mountains mountain NNS 16440 541 7 for for IN 16440 541 8 a a DT 16440 541 9 supply supply NN 16440 541 10 , , , 16440 541 11 the the DT 16440 541 12 author author NN 16440 541 13 has have VBZ 16440 541 14 struck strike VBN 16440 541 15 a a DT 16440 541 16 principle principle NN 16440 541 17 of of IN 16440 541 18 wide wide JJ 16440 541 19 application application NN 16440 541 20 . . . 16440 542 1 In in IN 16440 542 2 many many JJ 16440 542 3 of of IN 16440 542 4 the the DT 16440 542 5 mountains mountain NNS 16440 542 6 of of IN 16440 542 7 the the DT 16440 542 8 Southwest Southwest NNP 16440 542 9 there there EX 16440 542 10 are be VBP 16440 542 11 springs spring NNS 16440 542 12 and and CC 16440 542 13 small small JJ 16440 542 14 streams stream NNS 16440 542 15 of of IN 16440 542 16 excellent excellent JJ 16440 542 17 water water NN 16440 542 18 . . . 16440 543 1 Often often RB 16440 543 2 , , , 16440 543 3 as as IN 16440 543 4 in in IN 16440 543 5 the the DT 16440 543 6 case case NN 16440 543 7 discussed discuss VBN 16440 543 8 , , , 16440 543 9 very very RB 16440 543 10 little little JJ 16440 543 11 storage storage NN 16440 543 12 is be VBZ 16440 543 13 required require VBN 16440 543 14 . . . 16440 544 1 These these DT 16440 544 2 streams stream NNS 16440 544 3 , , , 16440 544 4 however however RB 16440 544 5 , , , 16440 544 6 are be VBP 16440 544 7 absorbed absorb VBN 16440 544 8 or or CC 16440 544 9 disappear disappear VB 16440 544 10 before before IN 16440 544 11 reaching reach VBG 16440 544 12 even even RB 16440 544 13 the the DT 16440 544 14 mouths mouth NNS 16440 544 15 of of IN 16440 544 16 the the DT 16440 544 17 cañons caã±on NNS 16440 544 18 , , , 16440 544 19 and and CC 16440 544 20 the the DT 16440 544 21 problem problem NN 16440 544 22 has have VBZ 16440 544 23 been be VBN 16440 544 24 to to TO 16440 544 25 convey convey VB 16440 544 26 the the DT 16440 544 27 water water NN 16440 544 28 to to TO 16440 544 29 distant distant VB 16440 544 30 cities city NNS 16440 544 31 and and CC 16440 544 32 mining mining NN 16440 544 33 camps camp NNS 16440 544 34 at at IN 16440 544 35 reasonable reasonable JJ 16440 544 36 cost cost NN 16440 544 37 . . . 16440 545 1 There there EX 16440 545 2 are be VBP 16440 545 3 several several JJ 16440 545 4 cities city NNS 16440 545 5 in in IN 16440 545 6 Arizona Arizona NNP 16440 545 7 now now RB 16440 545 8 possessing possess VBG 16440 545 9 pumped pumped JJ 16440 545 10 water water NN 16440 545 11 supplies supply NNS 16440 545 12 , , , 16440 545 13 which which WDT 16440 545 14 have have VBP 16440 545 15 possible possible JJ 16440 545 16 gravity gravity NN 16440 545 17 supplies supply NNS 16440 545 18 of of IN 16440 545 19 superior superior JJ 16440 545 20 quality quality NN 16440 545 21 . . . 16440 546 1 The the DT 16440 546 2 writer writer NN 16440 546 3 believes believe VBZ 16440 546 4 that that IN 16440 546 5 ultimately ultimately RB 16440 546 6 the the DT 16440 546 7 gravity gravity NN 16440 546 8 supplies supply NNS 16440 546 9 will will MD 16440 546 10 replace replace VB 16440 546 11 the the DT 16440 546 12 pumping pump VBG 16440 546 13 plants plant NNS 16440 546 14 . . . 16440 547 1 In in IN 16440 547 2 the the DT 16440 547 3 Bonita Bonita NNP 16440 547 4 pipe pipe NN 16440 547 5 line line NN 16440 547 6 , , , 16440 547 7 wood wood NN 16440 547 8 - - HYPH 16440 547 9 stave stave NN 16440 547 10 pipe pipe NN 16440 547 11 was be VBD 16440 547 12 used use VBN 16440 547 13 for for IN 16440 547 14 the the DT 16440 547 15 gravity gravity NN 16440 547 16 sections section NNS 16440 547 17 . . . 16440 548 1 In in IN 16440 548 2 other other JJ 16440 548 3 localities locality NNS 16440 548 4 , , , 16440 548 5 where where WRB 16440 548 6 the the DT 16440 548 7 grade grade NN 16440 548 8 of of IN 16440 548 9 the the DT 16440 548 10 line line NN 16440 548 11 is be VBZ 16440 548 12 very very RB 16440 548 13 uniform uniform JJ 16440 548 14 , , , 16440 548 15 as as IN 16440 548 16 would would MD 16440 548 17 be be VB 16440 548 18 the the DT 16440 548 19 case case NN 16440 548 20 down down IN 16440 548 21 a a DT 16440 548 22 typical typical JJ 16440 548 23 clinoplain clinoplain NN 16440 548 24 , , , 16440 548 25 cement cement NN 16440 548 26 pipe pipe NN 16440 548 27 is be VBZ 16440 548 28 deserving deserve VBG 16440 548 29 of of IN 16440 548 30 consideration consideration NN 16440 548 31 . . . 16440 549 1 It -PRON- PRP 16440 549 2 would would MD 16440 549 3 cost cost VB 16440 549 4 no no DT 16440 549 5 more more JJR 16440 549 6 than than IN 16440 549 7 wood wood NN 16440 549 8 stave stave NN 16440 549 9 , , , 16440 549 10 would would MD 16440 549 11 be be VB 16440 549 12 more more RBR 16440 549 13 durable durable JJ 16440 549 14 , , , 16440 549 15 and and CC 16440 549 16 , , , 16440 549 17 furthermore furthermore RB 16440 549 18 , , , 16440 549 19 it -PRON- PRP 16440 549 20 need nee MD 16440 549 21 have have VB 16440 549 22 no no DT 16440 549 23 greater great JJR 16440 549 24 leakage leakage NN 16440 549 25 . . . 16440 550 1 Its -PRON- PRP$ 16440 550 2 cost cost NN 16440 550 3 , , , 16440 550 4 however however RB 16440 550 5 , , , 16440 550 6 increases increase VBZ 16440 550 7 rapidly rapidly RB 16440 550 8 when when WRB 16440 550 9 built build VBN 16440 550 10 to to TO 16440 550 11 withstand withstand VB 16440 550 12 high high JJ 16440 550 13 pressures pressure NNS 16440 550 14 . . . 16440 551 1 The the DT 16440 551 2 use use NN 16440 551 3 of of IN 16440 551 4 bran bran NN 16440 551 5 for for IN 16440 551 6 determining determine VBG 16440 551 7 velocities velocity NNS 16440 551 8 is be VBZ 16440 551 9 of of IN 16440 551 10 interest interest NN 16440 551 11 . . . 16440 552 1 The the DT 16440 552 2 results result NNS 16440 552 3 are be VBP 16440 552 4 in in IN 16440 552 5 close close JJ 16440 552 6 accord accord NN 16440 552 7 with with IN 16440 552 8 those those DT 16440 552 9 obtained obtain VBN 16440 552 10 from from IN 16440 552 11 the the DT 16440 552 12 weir weir NNP 16440 552 13 measurements measurement NNS 16440 552 14 . . . 16440 553 1 In in IN 16440 553 2 the the DT 16440 553 3 measurement measurement NN 16440 553 4 of of IN 16440 553 5 ground ground NN 16440 553 6 - - HYPH 16440 553 7 water water NN 16440 553 8 velocities velocity NNS 16440 553 9 by by IN 16440 553 10 means mean NNS 16440 553 11 of of IN 16440 553 12 salts salt NNS 16440 553 13 in in IN 16440 553 14 solution solution NN 16440 553 15 , , , 16440 553 16 it -PRON- PRP 16440 553 17 is be VBZ 16440 553 18 found find VBN 16440 553 19 that that IN 16440 553 20 the the DT 16440 553 21 velocities velocity NNS 16440 553 22 of of IN 16440 553 23 different different JJ 16440 553 24 filaments filament NNS 16440 553 25 of of IN 16440 553 26 waters water NNS 16440 553 27 are be VBP 16440 553 28 extremely extremely RB 16440 553 29 variable variable JJ 16440 553 30 , , , 16440 553 31 and and CC 16440 553 32 a a DT 16440 553 33 quart quart NN 16440 553 34 of of IN 16440 553 35 salt salt NN 16440 553 36 solution solution NN 16440 553 37 , , , 16440 553 38 after after IN 16440 553 39 moving move VBG 16440 553 40 forward forward RB 16440 553 41 a a DT 16440 553 42 few few JJ 16440 553 43 feet foot NNS 16440 553 44 , , , 16440 553 45 is be VBZ 16440 553 46 widely widely RB 16440 553 47 dispersed disperse VBN 16440 553 48 . . . 16440 554 1 It -PRON- PRP 16440 554 2 would would MD 16440 554 3 be be VB 16440 554 4 of of IN 16440 554 5 value value NN 16440 554 6 to to TO 16440 554 7 know know VB 16440 554 8 to to TO 16440 554 9 what what WDT 16440 554 10 extent extent NN 16440 554 11 the the DT 16440 554 12 bran bran NN 16440 554 13 was be VBD 16440 554 14 distributed distribute VBN 16440 554 15 during during IN 16440 554 16 its -PRON- PRP$ 16440 554 17 4-hour 4-hour CD 16440 554 18 journey journey NN 16440 554 19 through through IN 16440 554 20 the the DT 16440 554 21 pipe pipe NN 16440 554 22 line line NN 16440 554 23 , , , 16440 554 24 and and CC 16440 554 25 during during IN 16440 554 26 how how WRB 16440 554 27 many many JJ 16440 554 28 minutes minute NNS 16440 554 29 it -PRON- PRP 16440 554 30 was be VBD 16440 554 31 being be VBG 16440 554 32 discharged discharge VBN 16440 554 33 at at IN 16440 554 34 the the DT 16440 554 35 lower low JJR 16440 554 36 end end NN 16440 554 37 of of IN 16440 554 38 the the DT 16440 554 39 line line NN 16440 554 40 . . . 16440 555 1 Was be VBD 16440 555 2 the the DT 16440 555 3 first first JJ 16440 555 4 appearance appearance NN 16440 555 5 , , , 16440 555 6 or or CC 16440 555 7 the the DT 16440 555 8 average average JJ 16440 555 9 time time NN 16440 555 10 of of IN 16440 555 11 appearance appearance NN 16440 555 12 , , , 16440 555 13 accepted accept VBN 16440 555 14 for for IN 16440 555 15 computing compute VBG 16440 555 16 the the DT 16440 555 17 velocity velocity NN 16440 555 18 of of IN 16440 555 19 flow flow NN 16440 555 20 ? ? . 16440 556 1 KENNETH KENNETH NNP 16440 556 2 ALLEN ALLEN NNP 16440 556 3 , , , 16440 556 4 M. M. NNP 16440 556 5 AM AM NNP 16440 556 6 . . . 16440 557 1 SOC SOC NNP 16440 557 2 . . . 16440 558 1 C.E. C.E. NNP 16440 559 1 ( ( -LRB- 16440 559 2 by by IN 16440 559 3 letter).--From letter).--from IN 16440 559 4 its -PRON- PRP$ 16440 559 5 lightness lightness NN 16440 559 6 , , , 16440 559 7 toughness toughness NN 16440 559 8 , , , 16440 559 9 flexibility flexibility NN 16440 559 10 , , , 16440 559 11 and and CC 16440 559 12 the the DT 16440 559 13 facility facility NN 16440 559 14 with with IN 16440 559 15 which which WDT 16440 559 16 it -PRON- PRP 16440 559 17 can can MD 16440 559 18 be be VB 16440 559 19 laid lay VBN 16440 559 20 , , , 16440 559 21 wood wood NN 16440 559 22 pipe pipe NN 16440 559 23 has have VBZ 16440 559 24 manifest manifest NN 16440 559 25 advantages advantage NNS 16440 559 26 for for IN 16440 559 27 use use NN 16440 559 28 in in IN 16440 559 29 inaccessible inaccessible JJ 16440 559 30 places place NNS 16440 559 31 and and CC 16440 559 32 where where WRB 16440 559 33 handling handling NN 16440 559 34 is be VBZ 16440 559 35 difficult difficult JJ 16440 559 36 ; ; : 16440 559 37 loss loss NN 16440 559 38 in in IN 16440 559 39 transportation transportation NN 16440 559 40 is be VBZ 16440 559 41 almost almost RB 16440 559 42 negligible negligible JJ 16440 559 43 , , , 16440 559 44 it -PRON- PRP 16440 559 45 will will MD 16440 559 46 stand stand VB 16440 559 47 much much JJ 16440 559 48 unequal unequal JJ 16440 559 49 settlement settlement NN 16440 559 50 without without IN 16440 559 51 cracking crack VBG 16440 559 52 , , , 16440 559 53 and and CC 16440 559 54 ordinary ordinary JJ 16440 559 55 leaks leak NNS 16440 559 56 are be VBP 16440 559 57 easily easily RB 16440 559 58 repaired repair VBN 16440 559 59 . . . 16440 560 1 The the DT 16440 560 2 coating coating NN 16440 560 3 of of IN 16440 560 4 the the DT 16440 560 5 bands band NNS 16440 560 6 is be VBZ 16440 560 7 of of IN 16440 560 8 such such JJ 16440 560 9 great great JJ 16440 560 10 importance importance NN 16440 560 11 that that IN 16440 560 12 it -PRON- PRP 16440 560 13 should should MD 16440 560 14 be be VB 16440 560 15 inspected inspect VBN 16440 560 16 very very RB 16440 560 17 thoroughly thoroughly RB 16440 560 18 , , , 16440 560 19 in in IN 16440 560 20 order order NN 16440 560 21 to to TO 16440 560 22 remedy remedy VB 16440 560 23 defects defect NNS 16440 560 24 before before IN 16440 560 25 the the DT 16440 560 26 back back NN 16440 560 27 - - HYPH 16440 560 28 filling filling NN 16440 560 29 is be VBZ 16440 560 30 done do VBN 16440 560 31 . . . 16440 561 1 The the DT 16440 561 2 writer writer NN 16440 561 3 has have VBZ 16440 561 4 found find VBN 16440 561 5 Durable durable JJ 16440 561 6 Metal Metal NNP 16440 561 7 Coating coat VBG 16440 561 8 an an DT 16440 561 9 excellent excellent JJ 16440 561 10 preservative preservative NN 16440 561 11 . . . 16440 562 1 Bands band NNS 16440 562 2 coated coat VBD 16440 562 3 with with IN 16440 562 4 this this DT 16440 562 5 preparation preparation NN 16440 562 6 were be VBD 16440 562 7 buried bury VBN 16440 562 8 in in IN 16440 562 9 a a DT 16440 562 10 salt salt NN 16440 562 11 marsh marsh NN 16440 562 12 , , , 16440 562 13 and and CC 16440 562 14 , , , 16440 562 15 after after IN 16440 562 16 a a DT 16440 562 17 year year NN 16440 562 18 , , , 16440 562 19 the the DT 16440 562 20 metal metal NN 16440 562 21 was be VBD 16440 562 22 found find VBN 16440 562 23 intact intact JJ 16440 562 24 and and CC 16440 562 25 the the DT 16440 562 26 coating coating NN 16440 562 27 fresh fresh JJ 16440 562 28 and and CC 16440 562 29 elastic elastic JJ 16440 562 30 . . . 16440 563 1 This this DT 16440 563 2 coating coating NN 16440 563 3 , , , 16440 563 4 however however RB 16440 563 5 , , , 16440 563 6 does do VBZ 16440 563 7 not not RB 16440 563 8 adhere adhere VB 16440 563 9 very very RB 16440 563 10 firmly firmly RB 16440 563 11 to to IN 16440 563 12 a a DT 16440 563 13 smooth smooth JJ 16440 563 14 metal metal NN 16440 563 15 surface surface NN 16440 563 16 , , , 16440 563 17 so so IN 16440 563 18 that that IN 16440 563 19 , , , 16440 563 20 with with IN 16440 563 21 careless careless JJ 16440 563 22 handling handling NN 16440 563 23 , , , 16440 563 24 patches patch NNS 16440 563 25 may may MD 16440 563 26 become become VB 16440 563 27 rubbed rubbed JJ 16440 563 28 or or CC 16440 563 29 torn tear VBN 16440 563 30 off off RP 16440 563 31 . . . 16440 564 1 There there EX 16440 564 2 is be VBZ 16440 564 3 no no DT 16440 564 4 advantage advantage NN 16440 564 5 in in IN 16440 564 6 coating coat VBG 16440 564 7 the the DT 16440 564 8 surface surface NN 16440 564 9 of of IN 16440 564 10 the the DT 16440 564 11 pipe pipe NN 16440 564 12 . . . 16440 565 1 To to TO 16440 565 2 prevent prevent VB 16440 565 3 decay decay NN 16440 565 4 , , , 16440 565 5 such such JJ 16440 565 6 pipe pipe NN 16440 565 7 should should MD 16440 565 8 carry carry VB 16440 565 9 water water NN 16440 565 10 under under IN 16440 565 11 pressure pressure NN 16440 565 12 or or CC 16440 565 13 be be VB 16440 565 14 laid lay VBN 16440 565 15 in in IN 16440 565 16 a a DT 16440 565 17 saturated saturate VBN 16440 565 18 soil soil NN 16440 565 19 , , , 16440 565 20 so so IN 16440 565 21 that that IN 16440 565 22 the the DT 16440 565 23 wood wood NN 16440 565 24 of of IN 16440 565 25 which which WDT 16440 565 26 it -PRON- PRP 16440 565 27 is be VBZ 16440 565 28 made make VBN 16440 565 29 will will MD 16440 565 30 always always RB 16440 565 31 be be VB 16440 565 32 saturated saturate VBN 16440 565 33 , , , 16440 565 34 and and CC 16440 565 35 coating coat VBG 16440 565 36 the the DT 16440 565 37 wood wood NN 16440 565 38 may may MD 16440 565 39 interfere interfere VB 16440 565 40 with with IN 16440 565 41 this this DT 16440 565 42 . . . 16440 566 1 Under under IN 16440 566 2 these these DT 16440 566 3 conditions condition NNS 16440 566 4 the the DT 16440 566 5 life life NN 16440 566 6 of of IN 16440 566 7 such such JJ 16440 566 8 pipe pipe NN 16440 566 9 is be VBZ 16440 566 10 not not RB 16440 566 11 known know VBN 16440 566 12 , , , 16440 566 13 but but CC 16440 566 14 it -PRON- PRP 16440 566 15 is be VBZ 16440 566 16 evidently evidently RB 16440 566 17 very very RB 16440 566 18 great great JJ 16440 566 19 . . . 16440 567 1 Large large JJ 16440 567 2 quantities quantity NNS 16440 567 3 of of IN 16440 567 4 wood wood NN 16440 567 5 pipe pipe NN 16440 567 6 have have VBP 16440 567 7 been be VBN 16440 567 8 removed remove VBN 16440 567 9 from from IN 16440 567 10 trenches trench NNS 16440 567 11 in in IN 16440 567 12 Boston Boston NNP 16440 567 13 , , , 16440 567 14 New New NNP 16440 567 15 York York NNP 16440 567 16 City City NNP 16440 567 17 . . . 16440 568 1 Philadelphia Philadelphia NNP 16440 568 2 , , , 16440 568 3 Baltimore Baltimore NNP 16440 568 4 , , , 16440 568 5 and and CC 16440 568 6 elsewhere elsewhere RB 16440 568 7 , , , 16440 568 8 usually usually RB 16440 568 9 in in IN 16440 568 10 perfectly perfectly RB 16440 568 11 sound sound JJ 16440 568 12 condition condition NN 16440 568 13 . . . 16440 569 1 It -PRON- PRP 16440 569 2 was be VBD 16440 569 3 commonly commonly RB 16440 569 4 made make VBN 16440 569 5 of of IN 16440 569 6 logs log NNS 16440 569 7 of of IN 16440 569 8 spruce spruce NN 16440 569 9 , , , 16440 569 10 yellow yellow JJ 16440 569 11 pine pine NN 16440 569 12 , , , 16440 569 13 or or CC 16440 569 14 oak oak NN 16440 569 15 , , , 16440 569 16 from from IN 16440 569 17 12 12 CD 16440 569 18 to to TO 16440 569 19 18 18 CD 16440 569 20 ft ft NN 16440 569 21 . . NNP 16440 569 22 long long RB 16440 569 23 , , , 16440 569 24 12 12 CD 16440 569 25 to to TO 16440 569 26 24 24 CD 16440 569 27 in in IN 16440 569 28 . . . 16440 570 1 in in IN 16440 570 2 diameter diameter NN 16440 570 3 , , , 16440 570 4 and and CC 16440 570 5 with with IN 16440 570 6 a a DT 16440 570 7 bore bore NN 16440 570 8 from from IN 16440 570 9 3 3 CD 16440 570 10 to to IN 16440 570 11 6 6 CD 16440 570 12 in in RB 16440 570 13 . . . 16440 571 1 in in IN 16440 571 2 diameter diameter NN 16440 571 3 . . . 16440 572 1 Some some DT 16440 572 2 6-in 6-in CD 16440 572 3 . . . 16440 573 1 pipe pipe NN 16440 573 2 taken take VBN 16440 573 3 up up RP 16440 573 4 in in IN 16440 573 5 Philadelphia Philadelphia NNP 16440 573 6 had have VBD 16440 573 7 an an DT 16440 573 8 external external JJ 16440 573 9 diameter diameter NN 16440 573 10 of of IN 16440 573 11 30 30 CD 16440 573 12 in in IN 16440 573 13 . . . 16440 574 1 The the DT 16440 574 2 ends end NNS 16440 574 3 were be VBD 16440 574 4 usually usually RB 16440 574 5 bound bind VBN 16440 574 6 with with IN 16440 574 7 wrought wrought NN 16440 574 8 - - HYPH 16440 574 9 iron iron NN 16440 574 10 collars collar NNS 16440 574 11 , , , 16440 574 12 and and CC 16440 574 13 adjacent adjacent JJ 16440 574 14 lengths length NNS 16440 574 15 were be VBD 16440 574 16 connected connect VBN 16440 574 17 by by IN 16440 574 18 an an DT 16440 574 19 iron iron NN 16440 574 20 thimble thimble NN 16440 574 21 driven drive VBN 16440 574 22 into into IN 16440 574 23 the the DT 16440 574 24 end end NN 16440 574 25 of of IN 16440 574 26 each each DT 16440 574 27 piece piece NN 16440 574 28 . . . 16440 575 1 A a DT 16440 575 2 few few JJ 16440 575 3 years year NNS 16440 575 4 ago ago RB 16440 575 5 the the DT 16440 575 6 writer writer NN 16440 575 7 took take VBD 16440 575 8 up up RP 16440 575 9 more more JJR 16440 575 10 than than IN 16440 575 11 2000 2000 CD 16440 575 12 ft ft NN 16440 575 13 . . NN 16440 575 14 of of IN 16440 575 15 wood wood NN 16440 575 16 pipe pipe NN 16440 575 17 of of IN 16440 575 18 this this DT 16440 575 19 kind kind NN 16440 575 20 , , , 16440 575 21 which which WDT 16440 575 22 had have VBD 16440 575 23 been be VBN 16440 575 24 laid lay VBN 16440 575 25 in in IN 16440 575 26 saturated saturate VBN 16440 575 27 soil soil NN 16440 575 28 about about IN 16440 575 29 a a DT 16440 575 30 century century NN 16440 575 31 earlier early RBR 16440 575 32 . . . 16440 576 1 It -PRON- PRP 16440 576 2 was be VBD 16440 576 3 of of IN 16440 576 4 Southern southern JJ 16440 576 5 pine pine NN 16440 576 6 logs log NNS 16440 576 7 , , , 16440 576 8 about about RB 16440 576 9 16 16 CD 16440 576 10 in in IN 16440 576 11 . . . 16440 577 1 in in IN 16440 577 2 diameter diameter NN 16440 577 3 , , , 16440 577 4 14 14 CD 16440 577 5 - - SYM 16440 577 6 1/2 1/2 CD 16440 577 7 ft ft NN 16440 577 8 . . NN 16440 577 9 long long RB 16440 577 10 , , , 16440 577 11 and and CC 16440 577 12 had have VBD 16440 577 13 a a DT 16440 577 14 5-in 5-in NN 16440 577 15 . . . 16440 578 1 bore bore NNP 16440 578 2 . . . 16440 579 1 Joints joint NNS 16440 579 2 were be VBD 16440 579 3 made make VBN 16440 579 4 with with IN 16440 579 5 tapering taper VBG 16440 579 6 cast cast NN 16440 579 7 - - HYPH 16440 579 8 iron iron NN 16440 579 9 ferrules ferrule NNS 16440 579 10 9 9 CD 16440 579 11 in in IN 16440 579 12 . . . 16440 580 1 long long RB 16440 580 2 , , , 16440 580 3 and and CC 16440 580 4 connections connection NNS 16440 580 5 to to IN 16440 580 6 smaller small JJR 16440 580 7 service service NN 16440 580 8 pipes pipe NNS 16440 580 9 were be VBD 16440 580 10 made make VBN 16440 580 11 with with IN 16440 580 12 similar similar JJ 16440 580 13 but but CC 16440 580 14 smaller small JJR 16440 580 15 ferrules ferrule NNS 16440 580 16 of of IN 16440 580 17 cast cast JJ 16440 580 18 brass brass NN 16440 580 19 . . . 16440 581 1 The the DT 16440 581 2 wood wood NN 16440 581 3 was be VBD 16440 581 4 apparently apparently RB 16440 581 5 as as RB 16440 581 6 sound sound JJ 16440 581 7 as as IN 16440 581 8 when when WRB 16440 581 9 it -PRON- PRP 16440 581 10 was be VBD 16440 581 11 first first RB 16440 581 12 laid lay VBN 16440 581 13 . . . 16440 582 1 The the DT 16440 582 2 use use NN 16440 582 3 of of IN 16440 582 4 flat flat JJ 16440 582 5 iron iron NN 16440 582 6 for for IN 16440 582 7 wrapping wrapping NN 16440 582 8 or or CC 16440 582 9 banding banding NN 16440 582 10 pipe pipe NN 16440 582 11 is be VBZ 16440 582 12 believed believe VBN 16440 582 13 to to TO 16440 582 14 be be VB 16440 582 15 wrong wrong JJ 16440 582 16 in in IN 16440 582 17 principle principle NN 16440 582 18 . . . 16440 583 1 Round round JJ 16440 583 2 iron iron NN 16440 583 3 furnishes furnish VBZ 16440 583 4 the the DT 16440 583 5 requisite requisite JJ 16440 583 6 strength strength NN 16440 583 7 with with IN 16440 583 8 the the DT 16440 583 9 least least JJS 16440 583 10 exposure exposure NN 16440 583 11 to to IN 16440 583 12 corrosion corrosion NN 16440 583 13 , , , 16440 583 14 and and CC 16440 583 15 ensures ensure VBZ 16440 583 16 a a DT 16440 583 17 more more RBR 16440 583 18 perfect perfect JJ 16440 583 19 contact contact NN 16440 583 20 with with IN 16440 583 21 the the DT 16440 583 22 wood wood NN 16440 583 23 . . . 16440 584 1 In in IN 16440 584 2 a a DT 16440 584 3 42-in 42-in NNP 16440 584 4 . . . 16440 585 1 stave stave NN 16440 585 2 pipe pipe NN 16440 585 3 laid lay VBN 16440 585 4 by by IN 16440 585 5 the the DT 16440 585 6 writer writer NN 16440 585 7 for for IN 16440 585 8 the the DT 16440 585 9 Water Water NNP 16440 585 10 Department Department NNP 16440 585 11 of of IN 16440 585 12 Atlantic Atlantic NNP 16440 585 13 City City NNP 16440 585 14 , , , 16440 585 15 N.J. New Jersey NNP 16440 585 16 , , , 16440 585 17 the the DT 16440 585 18 lumber lumber NN 16440 585 19 used use VBN 16440 585 20 was be VBD 16440 585 21 Washington Washington NNP 16440 585 22 fir fir NN 16440 585 23 , , , 16440 585 24 cypress cypress NN 16440 585 25 having have VBG 16440 585 26 been be VBN 16440 585 27 found find VBN 16440 585 28 difficult difficult JJ 16440 585 29 to to TO 16440 585 30 procure procure VB 16440 585 31 in in IN 16440 585 32 sufficient sufficient JJ 16440 585 33 quantity quantity NN 16440 585 34 , , , 16440 585 35 and and CC 16440 585 36 redwood redwood NN 16440 585 37 being be VBG 16440 585 38 more more RBR 16440 585 39 costly costly JJ 16440 585 40 and and CC 16440 585 41 no no RB 16440 585 42 better better RB 16440 585 43 . . . 16440 586 1 In in IN 16440 586 2 this this DT 16440 586 3 , , , 16440 586 4 his -PRON- PRP$ 16440 586 5 experience experience NN 16440 586 6 coincided coincide VBD 16440 586 7 with with IN 16440 586 8 that that DT 16440 586 9 of of IN 16440 586 10 the the DT 16440 586 11 author author NN 16440 586 12 . . . 16440 587 1 Cedar Cedar NNP 16440 587 2 was be VBD 16440 587 3 considered consider VBN 16440 587 4 , , , 16440 587 5 but but CC 16440 587 6 could could MD 16440 587 7 not not RB 16440 587 8 be be VB 16440 587 9 obtained obtain VBN 16440 587 10 in in IN 16440 587 11 sufficient sufficient JJ 16440 587 12 lengths length NNS 16440 587 13 or or CC 16440 587 14 quantity quantity NN 16440 587 15 , , , 16440 587 16 and and CC 16440 587 17 long long JJ 16440 587 18 - - HYPH 16440 587 19 leaf leaf NN 16440 587 20 pine pine NN 16440 587 21 which which WDT 16440 587 22 would would MD 16440 587 23 have have VB 16440 587 24 passed pass VBN 16440 587 25 the the DT 16440 587 26 somewhat somewhat RB 16440 587 27 rigid rigid JJ 16440 587 28 specifications specification NNS 16440 587 29 would would MD 16440 587 30 have have VB 16440 587 31 been be VBN 16440 587 32 difficult difficult JJ 16440 587 33 to to TO 16440 587 34 secure secure VB 16440 587 35 . . . 16440 588 1 It -PRON- PRP 16440 588 2 is be VBZ 16440 588 3 believed believe VBN 16440 588 4 , , , 16440 588 5 however however RB 16440 588 6 , , , 16440 588 7 that that IN 16440 588 8 there there EX 16440 588 9 is be VBZ 16440 588 10 a a DT 16440 588 11 field field NN 16440 588 12 at at IN 16440 588 13 least least JJS 16440 588 14 for for IN 16440 588 15 long long JJ 16440 588 16 - - HYPH 16440 588 17 leaf leaf NN 16440 588 18 pine pine NN 16440 588 19 for for IN 16440 588 20 such such JJ 16440 588 21 construction construction NN 16440 588 22 . . . 16440 589 1 Washington Washington NNP 16440 589 2 fir fir NN 16440 589 3 was be VBD 16440 589 4 found find VBN 16440 589 5 admirable admirable JJ 16440 589 6 in in IN 16440 589 7 every every DT 16440 589 8 respect respect NN 16440 589 9 , , , 16440 589 10 and and CC 16440 589 11 was be VBD 16440 589 12 moderate moderate JJ 16440 589 13 in in IN 16440 589 14 cost cost NN 16440 589 15 at at IN 16440 589 16 that that DT 16440 589 17 time time NN 16440 589 18 . . . 16440 590 1 The the DT 16440 590 2 bands band NNS 16440 590 3 were be VBD 16440 590 4 bent bent JJ 16440 590 5 in in IN 16440 590 6 the the DT 16440 590 7 field field NN 16440 590 8 , , , 16440 590 9 and and CC 16440 590 10 , , , 16440 590 11 after after IN 16440 590 12 heating heating NN 16440 590 13 in in IN 16440 590 14 an an DT 16440 590 15 oven oven NN 16440 590 16 for for IN 16440 590 17 about about RB 16440 590 18 3 3 CD 16440 590 19 min min NN 16440 590 20 . . NNP 16440 590 21 , , , 16440 590 22 were be VBD 16440 590 23 dipped dip VBN 16440 590 24 in in IN 16440 590 25 bunches bunche NNS 16440 590 26 of of IN 16440 590 27 five five CD 16440 590 28 into into IN 16440 590 29 a a DT 16440 590 30 kettle kettle NN 16440 590 31 of of IN 16440 590 32 melted melt VBN 16440 590 33 mineral mineral NN 16440 590 34 rubber rubber NN 16440 590 35 at at IN 16440 590 36 a a DT 16440 590 37 temperature temperature NN 16440 590 38 of of IN 16440 590 39 about about RB 16440 590 40 400 400â CD 16440 590 41 ° ° NNS 16440 590 42 Fahr Fahr NNP 16440 590 43 . . NNP 16440 590 44 , , , 16440 590 45 and and CC 16440 590 46 then then RB 16440 590 47 hung hang VBD 16440 590 48 up up RP 16440 590 49 for for IN 16440 590 50 the the DT 16440 590 51 coating coating NN 16440 590 52 to to IN 16440 590 53 harden harden NNP 16440 590 54 . . . 16440 591 1 This this DT 16440 591 2 took take VBD 16440 591 3 place place NN 16440 591 4 rapidly rapidly RB 16440 591 5 , , , 16440 591 6 as as IN 16440 591 7 the the DT 16440 591 8 work work NN 16440 591 9 was be VBD 16440 591 10 done do VBN 16440 591 11 in in IN 16440 591 12 winter winter NN 16440 591 13 . . . 16440 592 1 If if IN 16440 592 2 the the DT 16440 592 3 band band NN 16440 592 4 were be VBD 16440 592 5 wound wind VBN 16440 592 6 spirally spirally RB 16440 592 7 , , , 16440 592 8 the the DT 16440 592 9 coating coating NN 16440 592 10 would would MD 16440 592 11 have have VB 16440 592 12 to to TO 16440 592 13 be be VB 16440 592 14 done do VBN 16440 592 15 in in IN 16440 592 16 the the DT 16440 592 17 shop shop NN 16440 592 18 , , , 16440 592 19 but but CC 16440 592 20 field field NN 16440 592 21 coating coating NN 16440 592 22 is be VBZ 16440 592 23 preferable preferable JJ 16440 592 24 , , , 16440 592 25 as as IN 16440 592 26 it -PRON- PRP 16440 592 27 avoids avoid VBZ 16440 592 28 injury injury NN 16440 592 29 to to IN 16440 592 30 the the DT 16440 592 31 coating coating NN 16440 592 32 during during IN 16440 592 33 transportation transportation NN 16440 592 34 . . . 16440 593 1 An an DT 16440 593 2 advantage advantage NN 16440 593 3 of of IN 16440 593 4 wood wood NN 16440 593 5 pipe pipe NN 16440 593 6 for for IN 16440 593 7 conveying convey VBG 16440 593 8 water water NN 16440 593 9 is be VBZ 16440 593 10 its -PRON- PRP$ 16440 593 11 low low JJ 16440 593 12 coefficient coefficient NN 16440 593 13 of of IN 16440 593 14 friction friction NN 16440 593 15 . . . 16440 594 1 The the DT 16440 594 2 results result NNS 16440 594 3 obtained obtain VBN 16440 594 4 by by IN 16440 594 5 the the DT 16440 594 6 author author NN 16440 594 7 ( ( -LRB- 16440 594 8 _ _ NNP 16440 594 9 n n CC 16440 594 10 _ _ NNP 16440 594 11 = = SYM 16440 594 12 0.00866 0.00866 CD 16440 594 13 to to IN 16440 594 14 0.0092 0.0092 CD 16440 594 15 ) ) -RRB- 16440 594 16 appear appear VBP 16440 594 17 to to TO 16440 594 18 be be VB 16440 594 19 very very RB 16440 594 20 low low JJ 16440 594 21 as as IN 16440 594 22 compared compare VBN 16440 594 23 with with IN 16440 594 24 determinations determination NNS 16440 594 25 made make VBN 16440 594 26 for for IN 16440 594 27 wood wood NN 16440 594 28 - - HYPH 16440 594 29 stave stave NN 16440 594 30 pipe pipe NN 16440 594 31 . . . 16440 595 1 Kutter Kutter NNP 16440 595 2 's 's POS 16440 595 3 coefficient coefficient NN 16440 595 4 for for IN 16440 595 5 the the DT 16440 595 6 latter latter JJ 16440 595 7 varies varie NNS 16440 595 8 from from IN 16440 595 9 0.0096 0.0096 CD 16440 595 10 in in IN 16440 595 11 the the DT 16440 595 12 case case NN 16440 595 13 of of IN 16440 595 14 the the DT 16440 595 15 30-in 30-in NNP 16440 595 16 . . . 16440 596 1 pipe pipe NN 16440 596 2 at at IN 16440 596 3 Denver,[B Denver,[B NNP 16440 596 4 ] ] -RRB- 16440 596 5 to to IN 16440 596 6 from from IN 16440 596 7 0.012 0.012 CD 16440 596 8 to to IN 16440 596 9 0.015 0.015 CD 16440 596 10 as as IN 16440 596 11 determined determine VBN 16440 596 12 by by IN 16440 596 13 Messrs. Messrs. NNPS 16440 596 14 Marx Marx NNP 16440 596 15 , , , 16440 596 16 Wing Wing NNP 16440 596 17 , , , 16440 596 18 and and CC 16440 596 19 Hoskins Hoskins NNPS 16440 596 20 for for IN 16440 596 21 the the DT 16440 596 22 72-in 72-in CD 16440 596 23 . . . 16440 597 1 pipe pipe NN 16440 597 2 of of IN 16440 597 3 the the DT 16440 597 4 Pioneer Pioneer NNP 16440 597 5 Power Power NNP 16440 597 6 Plant Plant NNP 16440 597 7 of of IN 16440 597 8 Ogden Ogden NNP 16440 597 9 . . . 16440 598 1 [ [ -LRB- 16440 598 2 C c NN 16440 598 3 ] ] -RRB- 16440 598 4 Probably probably RB 16440 598 5 0.011 0.011 CD 16440 598 6 would would MD 16440 598 7 be be VB 16440 598 8 a a DT 16440 598 9 fairly fairly RB 16440 598 10 safe safe JJ 16440 598 11 figure figure NN 16440 598 12 to to TO 16440 598 13 use use VB 16440 598 14 in in IN 16440 598 15 designing design VBG 16440 598 16 new new JJ 16440 598 17 work work NN 16440 598 18 . . . 16440 599 1 [ [ -LRB- 16440 599 2 Illustration illustration NN 16440 599 3 : : : 16440 599 4 FIG FIG NNP 16440 599 5 . . . 16440 600 1 3 3 LS 16440 600 2 . . . 16440 601 1 DETAILS DETAILS NNP 16440 601 2 OF of IN 16440 601 3 OLD OLD NNP 16440 601 4 WOOD wood NN 16440 601 5 PIPE PIPE NNS 16440 601 6 . . . 16440 601 7 ] ] -RRB- 16440 602 1 J.L. J.L. NNP 16440 603 1 CAMPBELL CAMPBELL NNP 16440 603 2 , , , 16440 603 3 M. M. NNP 16440 603 4 AM AM NNP 16440 603 5 . . . 16440 604 1 SOC SOC NNP 16440 604 2 . . . 16440 605 1 C.E. C.E. NNP 16440 606 1 ( ( -LRB- 16440 606 2 by by IN 16440 606 3 letter).--Referring letter).--referre VBG 16440 606 4 to to IN 16440 606 5 Mr. Mr. NNP 16440 606 6 Smith Smith NNP 16440 606 7 's 's POS 16440 606 8 question question NN 16440 606 9 about about IN 16440 606 10 the the DT 16440 606 11 velocity velocity NN 16440 606 12 measurements measurement NNS 16440 606 13 by by IN 16440 606 14 bran bran NN 16440 606 15 , , , 16440 606 16 the the DT 16440 606 17 first first JJ 16440 606 18 appearance appearance NN 16440 606 19 of of IN 16440 606 20 the the DT 16440 606 21 bran bran NN 16440 606 22 and and CC 16440 606 23 the the DT 16440 606 24 colors color NNS 16440 606 25 was be VBD 16440 606 26 taken take VBN 16440 606 27 because because IN 16440 606 28 the the DT 16440 606 29 intervals interval NNS 16440 606 30 of of IN 16440 606 31 time time NN 16440 606 32 given give VBN 16440 606 33 thereby thereby RB 16440 606 34 were be VBD 16440 606 35 in in IN 16440 606 36 close close JJ 16440 606 37 accord accord NN 16440 606 38 among among IN 16440 606 39 themselves -PRON- PRP 16440 606 40 and and CC 16440 606 41 with with IN 16440 606 42 the the DT 16440 606 43 weir weir NNP 16440 606 44 measurements measurement NNS 16440 606 45 . . . 16440 607 1 The the DT 16440 607 2 time time NN 16440 607 3 from from IN 16440 607 4 the the DT 16440 607 5 first first JJ 16440 607 6 trace trace NN 16440 607 7 of of IN 16440 607 8 bran bran NN 16440 607 9 or or CC 16440 607 10 color color NN 16440 607 11 until until IN 16440 607 12 final final JJ 16440 607 13 disappearance disappearance NN 16440 607 14 varied vary VBN 16440 607 15 between between IN 16440 607 16 15 15 CD 16440 607 17 and and CC 16440 607 18 20 20 CD 16440 607 19 min min NN 16440 607 20 . . . 16440 608 1 Bran bran NN 16440 608 2 in in IN 16440 608 3 abundance abundance NN 16440 608 4 or or CC 16440 608 5 pronounced pronounce VBN 16440 608 6 color color NN 16440 608 7 showed show VBD 16440 608 8 in in IN 16440 608 9 2 2 CD 16440 608 10 min min NN 16440 608 11 . . . 16440 609 1 after after IN 16440 609 2 the the DT 16440 609 3 first first JJ 16440 609 4 appearance appearance NN 16440 609 5 , , , 16440 609 6 while while IN 16440 609 7 the the DT 16440 609 8 disappearance disappearance NN 16440 609 9 or or CC 16440 609 10 fading fading JJ 16440 609 11 was be VBD 16440 609 12 noticeable noticeable JJ 16440 609 13 after after IN 16440 609 14 a a DT 16440 609 15 period period NN 16440 609 16 of of IN 16440 609 17 from from IN 16440 609 18 7 7 CD 16440 609 19 to to TO 16440 609 20 10 10 CD 16440 609 21 min min NN 16440 609 22 . . . 16440 610 1 It -PRON- PRP 16440 610 2 required require VBD 16440 610 3 2 2 CD 16440 610 4 - - SYM 16440 610 5 1/2 1/2 CD 16440 610 6 min min NN 16440 610 7 . . . 16440 611 1 to to TO 16440 611 2 get get VB 16440 611 3 the the DT 16440 611 4 bran bran NN 16440 611 5 or or CC 16440 611 6 colors color NNS 16440 611 7 into into IN 16440 611 8 the the DT 16440 611 9 intake intake NN 16440 611 10 at at IN 16440 611 11 the the DT 16440 611 12 head head NN 16440 611 13 of of IN 16440 611 14 the the DT 16440 611 15 line line NN 16440 611 16 and and CC 16440 611 17 leave leave VB 16440 611 18 the the DT 16440 611 19 water water NN 16440 611 20 clear clear JJ 16440 611 21 . . . 16440 612 1 [ [ -LRB- 16440 612 2 Footnote Footnote NNP 16440 612 3 B B NNP 16440 612 4 : : : 16440 612 5 _ _ NNP 16440 612 6 Transactions Transactions NNPS 16440 612 7 _ _ NNP 16440 612 8 , , , 16440 612 9 Am Am NNP 16440 612 10 . . . 16440 613 1 Soc Soc NNP 16440 613 2 . . . 16440 614 1 C.E. C.E. NNP 16440 614 2 , , , 16440 614 3 Vol Vol NNP 16440 614 4 . . . 16440 615 1 XXXVI XXXVI NNP 16440 615 2 , , , 16440 615 3 p. p. NN 16440 616 1 26 26 CD 16440 616 2 . . . 16440 616 3 ] ] -RRB- 16440 617 1 [ [ -LRB- 16440 617 2 Footnote Footnote NNP 16440 617 3 C C NNP 16440 617 4 : : : 16440 617 5 _ _ NNP 16440 617 6 Journal Journal NNP 16440 617 7 _ _ NNP 16440 617 8 , , , 16440 617 9 New New NNP 16440 617 10 England England NNP 16440 617 11 Water Water NNP 16440 617 12 Works Works NNPS 16440 617 13 Assoc Assoc NNP 16440 617 14 . . . 16440 617 15 , , , 16440 617 16 Vol Vol NNP 16440 617 17 . . . 16440 618 1 XXII XXII NNP 16440 618 2 , , , 16440 618 3 p. p. NN 16440 619 1 279 279 CD 16440 619 2 . . . 16440 619 3 ] ] -RRB- 16440 620 1 Mr. Mr. NNP 16440 620 2 Allen Allen NNP 16440 620 3 refers refer VBZ 16440 620 4 to to IN 16440 620 5 the the DT 16440 620 6 bored bored JJ 16440 620 7 wood wood NN 16440 620 8 pipe pipe NN 16440 620 9 laid lay VBD 16440 620 10 many many JJ 16440 620 11 years year NNS 16440 620 12 ago ago RB 16440 620 13 in in IN 16440 620 14 Eastern eastern JJ 16440 620 15 cities city NNS 16440 620 16 . . . 16440 621 1 The the DT 16440 621 2 writer writer NN 16440 621 3 's 's POS 16440 621 4 experience experience NN 16440 621 5 indicates indicate VBZ 16440 621 6 that that IN 16440 621 7 a a DT 16440 621 8 bored bored JJ 16440 621 9 pipe pipe NN 16440 621 10 will will MD 16440 621 11 not not RB 16440 621 12 deliver deliver VB 16440 621 13 as as RB 16440 621 14 much much JJ 16440 621 15 water water NN 16440 621 16 as as IN 16440 621 17 a a DT 16440 621 18 planed planed JJ 16440 621 19 stave stave NN 16440 621 20 pipe pipe NN 16440 621 21 , , , 16440 621 22 on on IN 16440 621 23 account account NN 16440 621 24 of of IN 16440 621 25 the the DT 16440 621 26 greater great JJR 16440 621 27 interior interior JJ 16440 621 28 roughness roughness NN 16440 621 29 of of IN 16440 621 30 the the DT 16440 621 31 former former JJ 16440 621 32 . . . 16440 622 1 Referring refer VBG 16440 622 2 to to IN 16440 622 3 the the DT 16440 622 4 profile profile NN 16440 622 5 , , , 16440 622 6 the the DT 16440 622 7 8 8 CD 16440 622 8 - - SYM 16440 622 9 1/2-in 1/2-in CD 16440 622 10 . . . 16440 623 1 pipe pipe NN 16440 623 2 between between IN 16440 623 3 Corona Corona NNP 16440 623 4 and and CC 16440 623 5 Duran Duran NNP 16440 623 6 had have VBD 16440 623 7 a a DT 16440 623 8 theoretical theoretical JJ 16440 623 9 capacity capacity NN 16440 623 10 of of IN 16440 623 11 744,000 744,000 CD 16440 623 12 gal gal NN 16440 623 13 . . . 16440 624 1 per per IN 16440 624 2 day day NN 16440 624 3 . . . 16440 625 1 A a DT 16440 625 2 recent recent JJ 16440 625 3 test test NN 16440 625 4 showed show VBD 16440 625 5 it -PRON- PRP 16440 625 6 to to TO 16440 625 7 be be VB 16440 625 8 delivering deliver VBG 16440 625 9 water water NN 16440 625 10 at at IN 16440 625 11 the the DT 16440 625 12 rate rate NN 16440 625 13 of of IN 16440 625 14 759,000 759,000 CD 16440 625 15 gal gal NN 16440 625 16 . . . 16440 626 1 per per IN 16440 626 2 day day NN 16440 626 3 . . . 16440 627 1 The the DT 16440 627 2 3 3 CD 16440 627 3 - - SYM 16440 627 4 1/2-in 1/2-in CD 16440 627 5 . . . 16440 628 1 pipe pipe NN 16440 628 2 between between IN 16440 628 3 Vaughn Vaughn NNP 16440 628 4 and and CC 16440 628 5 Pastura Pastura NNP 16440 628 6 had have VBD 16440 628 7 a a DT 16440 628 8 theoretical theoretical JJ 16440 628 9 capacity capacity NN 16440 628 10 of of IN 16440 628 11 84 84 CD 16440 628 12 000 000 CD 16440 628 13 gal gal NN 16440 628 14 . . . 16440 629 1 per per IN 16440 629 2 day day NN 16440 629 3 . . . 16440 630 1 It -PRON- PRP 16440 630 2 delivers deliver VBZ 16440 630 3 only only RB 16440 630 4 65,000 65,000 CD 16440 630 5 gal gal NN 16440 630 6 . . . 16440 631 1 per per IN 16440 631 2 day day NN 16440 631 3 . . . 16440 632 1 There there EX 16440 632 2 are be VBP 16440 632 3 5 5 CD 16440 632 4 miles mile NNS 16440 632 5 of of IN 16440 632 6 bored bored JJ 16440 632 7 pipe pipe NN 16440 632 8 on on IN 16440 632 9 the the DT 16440 632 10 upper upper JJ 16440 632 11 end end NN 16440 632 12 of of IN 16440 632 13 this this DT 16440 632 14 section section NN 16440 632 15 . . . 16440 633 1 Pressure pressure NN 16440 633 2 gaugings gauging NNS 16440 633 3 show show VBP 16440 633 4 a a DT 16440 633 5 hydraulic hydraulic JJ 16440 633 6 gradient gradient NN 16440 633 7 in in IN 16440 633 8 excess excess NN 16440 633 9 of of IN 16440 633 10 the the DT 16440 633 11 theoretical theoretical JJ 16440 633 12 on on IN 16440 633 13 the the DT 16440 633 14 bored bored JJ 16440 633 15 pipe pipe NN 16440 633 16 , , , 16440 633 17 whereas whereas IN 16440 633 18 the the DT 16440 633 19 stave stave NN 16440 633 20 pipe pipe NN 16440 633 21 on on IN 16440 633 22 the the DT 16440 633 23 lower low JJR 16440 633 24 end end NN 16440 633 25 carries carry VBZ 16440 633 26 the the DT 16440 633 27 65,000 65,000 CD 16440 633 28 gal gal NN 16440 633 29 . . . 16440 634 1 on on IN 16440 634 2 a a DT 16440 634 3 flatter flat JJR 16440 634 4 gradient gradient NN 16440 634 5 than than IN 16440 634 6 the the DT 16440 634 7 theoretical theoretical JJ 16440 634 8 one one CD 16440 634 9 . . . 16440 635 1 Experience experience NN 16440 635 2 on on IN 16440 635 3 this this DT 16440 635 4 pipe pipe NN 16440 635 5 line line NN 16440 635 6 indicates indicate VBZ 16440 635 7 that that IN 16440 635 8 _ _ NNP 16440 635 9 n n CC 16440 635 10 _ _ NNP 16440 635 11 = = SYM 16440 635 12 0.009 0.009 CD 16440 635 13 , , , 16440 635 14 in in IN 16440 635 15 Kutter Kutter NNP 16440 635 16 's 's POS 16440 635 17 formula formula NN 16440 635 18 , , , 16440 635 19 closely closely RB 16440 635 20 approximates approximate VBZ 16440 635 21 the the DT 16440 635 22 capacity capacity NN 16440 635 23 of of IN 16440 635 24 planed planed JJ 16440 635 25 wood wood NN 16440 635 26 stave stave NN 16440 635 27 pipes pipe NNS 16440 635 28 of of IN 16440 635 29 8 8 CD 16440 635 30 to to IN 16440 635 31 16 16 CD 16440 635 32 in in IN 16440 635 33 . . . 16440 636 1 in in IN 16440 636 2 diameter diameter NN 16440 636 3 . . . 16440 637 1 The the DT 16440 637 2 writer writer NN 16440 637 3 favors favor VBZ 16440 637 4 the the DT 16440 637 5 use use NN 16440 637 6 of of IN 16440 637 7 0.01 0.01 CD 16440 637 8 as as IN 16440 637 9 conservative conservative JJ 16440 637 10 and and CC 16440 637 11 economical economical JJ 16440 637 12 . . . 16440 638 1 With with IN 16440 638 2 equal equal JJ 16440 638 3 exposure exposure NN 16440 638 4 to to IN 16440 638 5 corrosion corrosion NN 16440 638 6 , , , 16440 638 7 the the DT 16440 638 8 round round JJ 16440 638 9 band band NN 16440 638 10 is be VBZ 16440 638 11 undoubtedly undoubtedly RB 16440 638 12 the the DT 16440 638 13 better well JJR 16440 638 14 , , , 16440 638 15 but but CC 16440 638 16 the the DT 16440 638 17 flat flat JJ 16440 638 18 band band NN 16440 638 19 has have VBZ 16440 638 20 the the DT 16440 638 21 advantage advantage NN 16440 638 22 of of IN 16440 638 23 being be VBG 16440 638 24 completely completely RB 16440 638 25 buried bury VBN 16440 638 26 in in IN 16440 638 27 the the DT 16440 638 28 protective protective JJ 16440 638 29 coat coat NN 16440 638 30 of of IN 16440 638 31 the the DT 16440 638 32 particular particular JJ 16440 638 33 kind kind NN 16440 638 34 of of IN 16440 638 35 wood wood NN 16440 638 36 pipe pipe NN 16440 638 37 under under IN 16440 638 38 consideration consideration NN 16440 638 39 . . .